Traffic
Hai Duong starts construction of provincial road 394B and opens the East-West axis road
|
Hai Duong - Hai Duong province has just started construction of provincial road 394B and opened the East-West axis road for technical traffic, contributing to the completion of traffic infrastructure.
Prime Minister cuts ribbon to inaugurate Tan Son Nhat T3 Terminal
|
HCMC - On April 19, Prime Minister Pham Minh Chinh cut the ribbon to inaugurate the Tan Son Nhat Airport Terminal T3 project.
Starting construction of the 265 billion VND road connecting National Highway 28 with National Highway 1
|
Binh Thuan - The 4.5km long route connects National Highway 28 - the expressway intersection to National Highway 1 to shorten the distance and travel time.
From today, a series of roads in the center of Ho Chi Minh City will be closed to traffic for many nights
|
HCMC - From 6pm to 10am on April 19, 26, 29 and 30, many roads in the city center will be closed to traffic.
Starting construction of Ho Chi Minh City Ring Road 2 project, section through Thu Duc city
|
HCMC - The Ho Chi Minh City Ring Road 2 project, a package to relocate technical infrastructure and clear mines - phases 1 and 2 started construction on April 19.
Traffic accident at roundabout, young girl died
|
Binh Duong - At the roundabout on Highway 13, an accident occurred between a truck and a motorbike, resulting in the death of a young girl.
Hot News in Saigon: Median strip removed on major road
|
Hot News in Saigon on September 28: Median strip removed on major road in HCMC; Water outage in HCMC on weekends;...
Revealing the 13km long elevated road in the East of Ho Chi Minh City
|
HCMC – The 13km-long, 4-lane elevated road section of Ring Road 3, running through Thu Duc City, is gradually taking shape after more than a year of construction.
Underpass branch at the southern gateway of Ho Chi Minh City before opening to traffic
|
HCMC - The HC2 underpass branch (from District 7 to Binh Chanh District) at the Nguyen Van Linh - Nguyen Huu Tho intersection will open to traffic on September 30.
Hanoi builds 45m wide road, to be completed in 2026
|
Hanoi has begun construction of a 2.2km long road with a 45m cross-section, expected to be completed after 1.5 years.
Da Nang cannot close all residential roads across the railway yet
|
Da Nang - There are currently 10 residential crossings across the railway that cannot be closed because they are serving traffic while waiting for investment in the construction of a service road.
The fine exceeded the salary, the driver said "I will not drive anymore"
|
Receive bulky goods for more than 100 thousand VND in freight. However, many drivers were detected and handled by Hanoi Traffic Police, with fines many times higher than their wages.
Proposal to adjust traffic flow on Cam Lo - La Son expressway
|
Quang Tri - Traffic accidents continue to increase, so the locality continues to propose reviewing traffic diversion on the Cam Lo - La Son expressway.
Traffic police launch 30-day peak to handle students violating traffic laws
|
Traffic police forces nationwide have launched a high-profile campaign to inspect and handle violations of traffic safety and order by students and their parents...
Image of 9-vehicle pile-up on Highway 51
|
Ba Ria - Vung Tau - The Provincial Traffic Police Department has just extracted camera footage of a series of accidents involving 9 vehicles that blocked National Highway 51.
The remaining part of Phong Chau bridge is at risk of collapsing
|
Phu Tho - The remaining part of Phong Chau bridge at present shows signs of tilting, subsidence..., and could collapse at any time.
From 2025, in which cases can drivers get off when stopping their cars?
|
From January 1, 2025, in some cases, car drivers are allowed to get off when stopping the vehicle but must ensure safety measures.
Truck carrying smuggled goods crashes into many vehicles to escape in Ho Chi Minh City
|
HCMC - A truck carrying smuggled goods from Tay Ninh to HCMC, passing through Cu Chi district, was surrounded by police, the driver fled and crashed into many vehicles on Highway 22.
Speeding up construction of 1,300 billion VND road connecting Noi Bai - Lao Cai expressway
|
Yen Bai - The route connecting Nghia Lo with Noi Bai - Lao Cai expressway is being accelerated, with the goal of completion by 2025.
Solution for the last 0.15% of the highway area through Quang Binh
|
Quang Binh - Localities are developing plans to enforce the handover of the last meters of highway land to the Project Management Boards.