Traffic

Completion of asphalting of National Highway 13 overpass and Nguyen Thi Minh Khai street in Ho Chi Minh City

|

HCMC - The overpass of the Ring Road 3 HCMC project across National Highway 13 and Nguyen Thi Minh Khai street has been asphalted.

100m embankment landslide near Cha Lo International Border Gate

|

Quang Tri - Heavy rain causes 100m of embankment near Cha Lo International Border Gate to erode, some households are affected.

Quang Ngai people agree to dismantle houses to expand National Highway 24B

|

Quang Ngai is accelerating site clearance for the National Highway 24B upgrade project, striving to hand over 70% of the site by the end of September to accelerate construction.

Investing 155 billion VND to build a road connecting the Hoa Lac - Hoa Binh route in Phu Tho

|

Phu Tho - Thinh Minh commune invests 155 billion VND for the Hoa Lac - Hoa Binh connecting road project with Hoa Binh 6A bridge (phase 1).

Moment of car losing control, overturning on the highway, suspected to be due to driver drowsiness

|

Lam Dong - Dashcam recorded the scene of a truck losing control and overturning on the Vinh Hao - Phan Thiet expressway on September 13.

Hot Saigon: Domestic consortium proposes to make a general contractor for the $2 billion Metro line in Ho Chi Minh City

|

Hot Saigon News on May 20: Domestic consortium proposes to make a general contractor for the $2 billion Metro line in Ho Chi Minh City; Developments of the new heavy rain in the South;...

Scene of the motorbike and container truck accident that killed a man

|

Binh Duong - The accident between a motorbike and a container truck that killed one person occurred on the afternoon of May 20, at the intersection of Pham Ngoc Thach Street and My Phuoc Tan Van Street.

Technology motorbike taxi drivers are ready to switch to electric vehicles if there is a support solution

|

To synchronously deploy and completely switch from gasoline vehicles to electric vehicles, whether in Ho Chi Minh City or other major cities, many more solutions are needed to support workers.

Heavy rain, truck overturns in the middle of the road in Ho Chi Minh City, people break the door to rescue a driver trapped

|

HCMC - On May 20, a truck overturned on Tran Van Giau Street, the driver was trapped inside the cabin, causing traffic congestion.

Hanoi Metro talks about fixing the leaked water incident on the Cat Linh - Ha Dong train

|

The problem of water regulation flowing caused passengers on the Cat Linh - Ha Dong train to wear umbrellas, many people were worried and hoped for a quick fix to ensure safety and convenience.

HCMC builds an intersection connecting the South with the Ben Luc - Long Thanh Expressway, with a total capital of 591 billion VND

|

HCMC - The Ben Luc - Long Thanh Expressway Intersection with National Highway 50 (Binh Chanh District) has a total capital of VND591 billion, expected to start construction at the end of 2025, and be completed in 2026.

Bridges to expand Hanoi's development space

|

Yesterday (May 19), Tu Lien Bridge was started. This is a project along with the Tran Hung Dao and Ngoc Hoi bridges projects that Hanoi started construction in 2025 with the goal of solving traffic problems and bringing many important economic development opportunities to Hanoi and neighboring areas.

170 electronic boards of Ho Chi Minh City bus waiting rooms damaged, affecting people

|

Ho Chi Minh City has 170 damaged electronic boards for bus waiting rooms, many places are occupied, painted with figures, littered... affecting people's experience.

Air conditioners flow, visitors on the Cat Linh - Ha Dong train must cover themselves

|

Hanoi - On the afternoon of May 19, some passengers on the Cat Linh - Ha Dong train had to use an umbrella to hide in the train car to avoid water from the air conditioning system flowing down to them.

The Metro line worth over2 billion USD through 6 districts of Ho Chi Minh City has a domestic investor proposing construction

|

HCMC - Metro Line 2 (Ben Thanh - Tham Luong) is more than 11km long, passing through 6 districts, expected to start construction at the end of 2025, with a domestic consortium proposed as a general contractor.

HCMC is about to build 5 more bridges in District 8, with a total capital of thousands of billions of VND

|

HCMC - Binh Tien Bridge and Road, Rach Cat Bridge and the three Canh Ngang bridges No. 1, 2, 3 are about to be built in District 8 to increase traffic connectivity and reduce congestion in the area.

Hot Saigon: 2,177 households in Ho Chi Minh City are about to give up land to build a 4-lane highway

|

Hot Saigon News on September 19: 3 secondary schools enroll students in grade 6 using a survey test to announce the impact ratio; 2,177 households are about to give up land to build a highway;...

The theory of driving test, if 1 question is incorrect, must also be retaken

|

If only 1 question is correct about handling serious traffic safety violations, the driving test theory test will not meet the requirements.

Nhon Trach Bridge finishes early, ready to open to traffic at the end of June

|

Ho Chi Minh City - Nhon Trach Bridge, a key project of the Ho Chi Minh City Ring Road 3 project, will open to traffic at the end of June, 3 months ahead of schedule.

Research on investment in the 14.6 km long coastal road project through Phan Thiet

|

Binh Thuan - The province is studying an investment plan for the coastal road project through Phan Thiet city and the Ca Ty River overpass.