Traffic

Completion of asphalting of National Highway 13 overpass and Nguyen Thi Minh Khai street in Ho Chi Minh City

|

HCMC - The overpass of the Ring Road 3 HCMC project across National Highway 13 and Nguyen Thi Minh Khai street has been asphalted.

100m embankment landslide near Cha Lo International Border Gate

|

Quang Tri - Heavy rain causes 100m of embankment near Cha Lo International Border Gate to erode, some households are affected.

Quang Ngai people agree to dismantle houses to expand National Highway 24B

|

Quang Ngai is accelerating site clearance for the National Highway 24B upgrade project, striving to hand over 70% of the site by the end of September to accelerate construction.

Investing 155 billion VND to build a road connecting the Hoa Lac - Hoa Binh route in Phu Tho

|

Phu Tho - Thinh Minh commune invests 155 billion VND for the Hoa Lac - Hoa Binh connecting road project with Hoa Binh 6A bridge (phase 1).

Moment of car losing control, overturning on the highway, suspected to be due to driver drowsiness

|

Lam Dong - Dashcam recorded the scene of a truck losing control and overturning on the Vinh Hao - Phan Thiet expressway on September 13.

Hanoi announces traffic reorganization on 2 central streets from June 11

|

Hanoi - 2 streets in Hoan Kiem district will be reorganized for traffic from tomorrow (June 11).

Vehicles extended from the highway, parallel road to An Phu intersection after the morning rain in Ho Chi Minh City

|

HCMC - Thousands of vehicles of all kinds stretched for kilometers on the roads towards the An Phu intersection on the morning of June 10.

Details of 3 large bridges on key routes in Nam Dinh

|

Nam Dinh - After a period of construction, 3 large bridges on the new Nam Dinh - Lac Quan coastal road are gradually being completed.

The Ministry of Construction proposes to amend many regulations on road fees

|

The Ministry of Construction has just proposed amending a number of articles related to road fees.

Hanoi starts construction of metro depot No. 2 in October 2025

|

Hanoi - Xuan Dinh Depot of metro line 2 (Nam Thang Long - Tran Hung Dao section) is expected to start construction in October 2025.

Tien Giang builds a bridge worth over VND119 billion connecting the large rice-producing area of Cai Lay district

|

Tien Giang - The locality is implementing a project to build a bridge over Nguyen Van Tiep canal with a total capital of 119.451 billion VND.

Hot Saigon: Prolonged traffic jam on the road leading to the Ho Chi Minh City Expressway

|

Hot Saigon News on September 9: Searching for the person who hired a three-wheeled driver to throw away functional foods; Congestion at An Phu intersection;...

Every day, Hanoi Traffic Police fined hundreds of cases of driving on the sidewalk and running red lights

|

Hanoi - Every day, the traffic police force handles hundreds of violations, such as running red lights, riding motorbikes on the sidewalk, going in the wrong direction.

Traffic police verify the incident of a man sneaking out the glass door to take photos while the car was running

|

Binh Thuan - A car was running on a tourist route when a person in the car crawled out the glass door, swinging into the car to take photos.

In the first 6 months of the year, Hanoi public passenger transport serves millions of people

|

Hanoi Public passenger transport continues to record impressive growth in both transportation output and revenue.

New developments on the Metro line worth over 2 billion USD through 6 districts of Ho Chi Minh City

|

HCMC - Metro Line No. 2 (Ben Thanh - Tham Luong) passing through 6 districts 1, 3, 10, 12, Tan Binh and Tan Phu will pilot bid designation, first of all consulting packages.

People in Thu Duc City are miserable because of the degraded road, full of potholes

|

HCMC - Lo Lu Street is currently seriously degraded, the road surface is peeling, full of potholes stretching hundreds of meters.

Collision with tractor-trailer in Ho Chi Minh City, mother and child died on the spot

|

HCMC - A motorbike collided with a tractor-trailer on Provincial Road 8 (Cu Chi District), causing the mother and child to die on the spot. The police are currently handling the scene.

Reviewing and repairing damage on the Vinh Hao - Phan Thiet Expressway

|

Binh Thuan - Vinh Hao - Phan Thiet Expressway is being reviewed for damage to repair after 2 years of operation.

On the construction site of the 692 billion VND road connecting 2 expressways in Phu Tho

|

Phu Tho - 3 construction teams are being deployed at the construction site of the Noi Bai - Lao Cai Expressway Construction Investment Project with Tuyen Quang - Phu Tho Expressway.