Traffic

Ba Bau intersection in Lam Dong is congested for more than 1km after waiting for a red light for more than 80 seconds

|

Lam Dong - Cars lined up about 1km long on National Highway 1 to wait to pass the red light for 81 seconds at Ba Bau intersection.

Quy Nhon - Pleiku Expressway will cross two dangerous steep passes

|

Gia Lai - The expressway project is expected to start construction in 2025 and will cross the two passes of An Khe and Mang Yang, with a long, quite dangerous steep terrain.

Reasons why motorbikes are still crowded into the car lane on Pham Van Dong Street, Hanoi

|

Hanoi - Motorbikes are still crowded entering the lane reserved for cars on Pham Van Dong Street even though the entire road axis is very airy.

Technology driver dies on the spot after hitting an electric pole in Ho Chi Minh City

|

HCMC - After a strong crash into an electric pole on Pham Van Chieu Street, a male technology driver died on the spot.

Expected to issue emission standards for millions of motorbikes in July

|

The authorities are finalizing to issue emission standards for vehicles.

The 1,500 billion VND project to expand the southern gateway of Ho Chi Minh City has completed 100% of the site

|

HCMC - The National Highway 50 expansion project, the southern gateway of HCMC, with a total capital of VND1,500 billion, through Binh Chanh district has completed 100% of the site.

The man who pointed his hand at a motorbike while performing a circus said that due to back pain, he let his hand down and back

|

Binh Duong - On April 21, the Traffic Police Department of the Provincial Police invited the man who pulled a wheelie and let go of the other hand to perform a circus on the road to work.

The bridge connecting Long Bien with Gia Lam is behind schedule, no completion date has been set

|

Hanoi - The slow handover of the site has caused the road bridge project across the Duong River to not be completed in 2025 as planned and the completion date has not been set.

Dien Bien adjusts regulations on right turns at some intersections

|

Dien Bien - The Provincial Police have just officially announced the adjustment of regulations when red lights are at some intersections in Dien Bien Phu City.

Motorbike taxi driver dies on the spot after accident with 7-seat car

|

Binh Duong - The provincial police are investigating the accident of a motorbike and a car that caused the death of a motorbike taxi driver at the scene.

On the occasion of April 30 - May 1, Hanoi increases buses, tightens public transport safety

|

Hanoi The Hanoi Traffic Management and Operation Center has just planned to organize public passenger transport during the April 30 - May 1, 2025 holiday.

Many roads in the center of Ho Chi Minh City are restricted from traffic from 5:00 p.m. today

|

HCMC - Many roads in the city center will be restricted to traffic this afternoon and evening (September 20).

Progress of site clearance for 3 key transport projects in Hoang Mai

|

Hanoi - Hoang Mai District is reclaiming land and handing over land to build 3 key traffic projects in the area.

Hanoi opens 6-lane road, begins construction of intersection worth nearly VND2,400 billion

|

Hanoi - The city has just opened the road connecting Nam Tu Liem and Ha Dong districts, and at the same time started construction of an important intersection in Hoai Duc district.

16 urban areas have not yet opened their roads, Hanoi faces the risk of prolonged congestion

|

Hanoi - Despite being put into use, 16 urban areas in Hanoi have not yet been connected to the general transport network, creating serious bottlenecks.

Current status of the intersection in Ha Dong before building an overpass to reduce congestion

|

Hanoi - An overpass worth nearly VND880 billion will be built at the intersection of Le Trong Tan Street and National Highway 6 with the expectation of helping to reduce congestion and increase connectivity.

The shape of the Bung - Van Ninh expressway has just been opened to traffic

|

Quang Binh - The Bung - Van Ninh expressway section has just been opened to traffic, contributing to promoting traffic connectivity and socio-economic development in the North Central region.

Hai Duong starts construction of provincial road 394B and opens the East-West axis road

|

Hai Duong - Hai Duong province has just started construction of provincial road 394B and opened the East-West axis road for technical traffic, contributing to the completion of traffic infrastructure.

Prime Minister cuts ribbon to inaugurate Tan Son Nhat T3 Terminal

|

HCMC - On April 19, Prime Minister Pham Minh Chinh cut the ribbon to inaugurate the Tan Son Nhat Airport Terminal T3 project.

Starting construction of the 265 billion VND road connecting National Highway 28 with National Highway 1

|

Binh Thuan - The 4.5km long route connects National Highway 28 - the expressway intersection to National Highway 1 to shorten the distance and travel time.