Traffic

People self-dismantle works, hand over land for more than 7km of road in Hung Yen

|

Hung Yen - After propaganda and mobilization, some households on DH66C route, Hung Ha commune have proactively dismantled the violating construction and handed over the site.

Many cars collide in a chain reaction on Nhat Tan bridge

|

Hanoi - Many cars collide in a chain reaction on Nhat Tan bridge. Functional forces are investigating the cause.

Motorbike crushed after head-on collision with truck, 1 person died

|

Lam Dong - A motorbike driven by a young man crashed head-on into a truck on National Highway 1. This young man died on the spot.

Traffic police force made records of 746 violations, revoked 166 driver's licenses

|

Khanh Hoa - In 5 months, the traffic police force made records of 746 violations and revoked 166 driver's licenses for violations.

Investing 158 billion VND to build a road connecting Tuyen Quang - Phu Tho expressway

|

Phu Tho will have another traffic route invested in construction to connect the old Thanh Ba district center with the Tuyen Quang - Phu Tho expressway.

Quang Tri airport project faces difficulties due to slow site clearance

|

Quang Tri - The price has not been agreed upon, the land origin is unknown and the resettlement area is not yet available, so the site clearance for the Quang Tri airport project has not been completed.

Hanoi reclaims land from nearly 800 households to expand arterial roads

|

Hanoi - It is expected that 788 households in two districts will have their land reclaimed to expand a 7km-long arterial road, with an investment capital of more than VND5,480 billion.

4 main roads in Thu Thiem remain unfinished after 10 years

|

HCMC - After 10 years of construction, 4 main roads in Thu Thiem New Urban Area (Thu Duc City) are still not completed due to land acquisition problems.

Progress of 47km, 4-lane route to relieve traffic jams in Ho Chi Minh City

|

After 18 months of construction, Beltway 3 passing through Ho Chi Minh City is more than 47km long (passing through Thu Duc, Cu Chi, Hoc Mon, Binh Chanh) with 4 expressway lanes, reaching 24.3% of the volume.

Cause of Highway 6 traffic accident that killed 12-year-old girl

|

Hoa Binh - The police have determined the cause of the traffic accident on National Highway 6 through Tan Lac district at midnight that killed a 12-year-old girl.

Metro Line 1 guaranteed to run on December 22 despite disbursement problems

|

HCMC - Metro Line 1 (Ben Thanh - Suoi Tien) will officially be put into commercial operation on December 22, 2024, despite difficulties in disbursing the CP1a package.

The land for road expansion costing over 1,000 billion in Ho Chi Minh City is littered with garbage

|

HCMC - The vacant land to widen Chu Van An Street (Binh Thanh District) is littered with trash and scrap, causing pollution, even though there is a sign saying "No dumping".

Things to note if Hanoi "locks" motorbike taxi drivers to wear work cards

|

If approved, the regulation requiring motorbike taxi drivers to wear work identification cards that Hanoi is currently seeking opinions on will be applied from 2024.

Record of blue-plate car driving into motorbike lane on Phu My bridge

|

HCMC - A driver of a blue-plate car drove into the motorbike lane on Phu My Bridge (District 7) and was ticketed by HCMC Traffic Police.

Hanoi doubles the width of National Highway 1A after more than 10 years of difficulties

|

Hanoi - National Highway 1A, the 3.8km Van Dien-Ngoc Hoi section, is being widened more than twice (from 20m to 46m) after more than 10 years of difficulties in site clearance.

What is in the Phong Chau bridge sections that are about to be demolished?

|

Phu Tho - The remaining part of Phong Chau bridge, mainly on the side of Phung Nguyen commune, Lam Thao district, is being prepared to be demolished by functional units.

Morning news: Roads in Dak Lak are damaged before handover

|

Morning news on December 6: Before handover, the 1,800 billion VND traffic road in Dak Lak is damaged; Rural land in Ha Dong district exceeds 100 million VND/m2;…

Building Mang Den airport is absolutely necessary

|

According to the Ministry of Transport, the development of transport infrastructure, including Mang Den airport (Kon Tum), is extremely necessary.

Long Bien - Gia Lam bridge project after 15 months of construction

|

Hanoi - After 15 months of construction, some items of the project to build a railway and road bridge across the Duong River, with a capital of nearly 1,850 billion VND, have taken shape.

Deprivation of driving license 330 cases in Ha Nam

|

Ha Nam - In November 2024, Phu Ly City Police revoked the driving licenses of 330 cases and detained 149 vehicles violating traffic safety and urban order.