Traffic

Hanoi adjusts traffic on Thang Long Avenue to construct metro line No. 5

|

Hanoi reorganizes traffic on Thang Long Avenue to serve the construction of metro line No. 5 for 1 year.

Hanoi urgently builds parking lot in the central area

|

Hanoi lacks serious parking lots in the central area. The Department of Construction proposes urgent investment in parking lots in Ba Dinh, Hoan Kiem and Cua Nam.

Proposal to build connecting roads on the Khanh Hoa - Buon Ma Thuot expressway with about 1,700 billion VND

|

Dak Lak - Locality proposes to invest in building a road connecting the end point of the Khanh Hoa - Buon Ma Thuot expressway... with a total investment of about 1,700 billion VND.

Barricades, digging roads for emergency underground culvert construction in Hanoi

|

During rush hour, the Hoang Quoc Viet - Buoi - Lac Long Quan intersection area is locally congested due to emergency underground culvert construction barriers.

Tomorrow, Hanoi starts construction of 3 sections of Ring Road 2.5, 40-50m wide

|

Hanoi - 3 sections of Ring Road 2.5 with a total length of about 2.26km, cross-section 40-50m will be started tomorrow (March 20).

Leaders of Quang Tri province urgently direct the upgrade of Tan Lien - Thuan road

|

Quang Tri - Provincial leaders request relevant units to urgently remove obstacles and ensure the completion of upgrading the Tan Lien - Thuan road in 2026.

Billion-VND traffic route in Southeast Hai Phong gradually revealed

|

Hai Phong - The investment project to build the road from Provincial Road 354 to National Highway 10 is accelerating progress, striving to reach the target in June 2026.

Hanoi informs about the progress of the extended To Huu road - National Highway 6 and Provincial Road 419

|

Hanoi - Voters proposed that the City People's Committee invest funds and direct the acceleration of the construction progress of traffic road projects in Chuong My ward.

Hanoi dismantles, relocates works, and hands over land for National Highway 6

|

Hanoi - National Highway 6, Ba La - Xuan Mai section, will have a cross-section extended to 50-60 m, and many bridges on the route will also be built.

More than 4,000 people violate alcohol concentration during the New Year holiday in Ho Chi Minh City

|

Ho Chi Minh City - During the 2026 New Year holiday, the traffic police force of Ho Chi Minh City handled more than 4,000 cases of alcohol and drug concentration violations.

Continuing the bridge span, Da Nang workers are out of the scene of blocking the river from the market

|

Da Nang - Duy Phuoc bridge has officially temporarily opened to motorbike traffic, shortening travel distance for thousands of workers before the New Year.

Multiple-vehicle accident on National Highway 47B causes 1 death

|

Thanh Hoa - An accident between a truck, a tractor-trailer and a car on National Highway 47B killed 1 person and injured 1 person.

Phu Quy Island temporarily runs out of gas due to rough seas

|

Lam Dong - Gas stations in Phu Quy Special Zone are temporarily out of gasoline due to rough seas, and transport ships cannot transport fuel from the mainland to the island.

Hanoi Ring Road 3 reduces prolonged congestion thanks to flexible traffic organization

|

Hanoi - On the last day of the New Year holiday, Ring Road 3 is "easier to breathe" for vehicles thanks to flexible traffic organization plans.

Series of traffic projects reaching the 2026 target

|

2026 begins with high expectations when a series of key transportation projects across the country enter the completion phase, preparing to be put into operation.

Sanctioning passenger car drivers going in the opposite direction, driving in emergency lanes on the highway

|

After reflecting on social networks, traffic police verified and fined the passenger car driver who went against traffic and drove into the emergency stop lane on the Noi Bai - Lao Cai highway.

Ho Chi Minh City installs 8 elevators at Metro Line 1 pedestrian bridges

|

Ho Chi Minh City installs 8 elevators at 7 pedestrian bridges connecting the elevated stations of Metro Line 1 (Ben Thanh - Suoi Tien), expected to be completed in mid-2026.

Many bottlenecks on the key tourist route in Tuyen Quang

|

Tuyen Quang - National Highway 4C, a vital traffic and tourism route leading to the Dong Van Karst Plateau, is revealing many bottlenecks that need to be overcome.

Machine runs all night, workers work without holidays

|

During the 2026 New Year holiday, the construction atmosphere on key traffic projects is still urgent. Thousands of engineers and workers stick to the construction site to ensure the progress of projects expected to be completed in 2026.

Component project 3 of Khanh Hoa - Buon Ma Thuot expressway reaches about 90% of the volume

|

Dak Lak - Sub-project 3 of the Khanh Hoa - Buon Ma Thuot expressway has been technically opened to traffic and currently reaches about 92% of the construction volume.