Traffic
National Highway 13 expansion, expected to relieve pressure at the Northeast gateway of Ho Chi Minh City
|
HCMC - The project to upgrade National Highway 13 to 8 lanes, a 15km long section through the old Binh Duong province, is being accelerated in areas where the site has been handed over.
Establishing a Steering Committee to remove land obstacles to expand Noi Bai - Lao Cai Expressway
|
Lao Cai - Removing land obstacles will help the Noi Bai - Lao Cai expressway soon be expanded to 4 lanes.
Collision with truck, woman dies on the spot
|
Ha Tinh - Collision with a truck, a woman driving an electric motorbike died on the spot.
Traffic flow to serve the construction of a project worth over VND6,000 billion in Hai Phong
|
Hai Phong - The Traffic Police Department has just announced temporary traffic diversion to serve the construction of Nguyen Trai Bridge and urban beautification of the surrounding area.
Close-up of landslides along the Bo River
|
HUE - Hundreds of meters of riverbank in Quang Dien commune were threatened by landslides on the inter-commune road and many households.
Some buses in Ho Chi Minh City do not stop completely when picking up passengers, the risk of traffic accidents
|
Ho Chi Minh City - Some buses do not stop when they pick up passengers, urge passengers to get up and down the bus, potentially at risk of accidents for passengers and pedestrians.
Lao Cai Sports Center officers violate the frame alcohol content
|
Lao Cai - Violation of frame alcohol content, 1 officer of the Provincial Sports Training and Sports Competition Center was fined 35 million VND
Metro tunnel excavators - Hanoi Railway Station is about to advance through the residential area
|
Hanoi - Metro tunnel dug machine - Hanoi "speedy" station is moving in the S10 station area, preparing to enter the residential area.
The road connecting Nam Tu Liem - Ha Dong touches the finish line, is expected to open the car before 30.4
|
Hanoi - Project on construction of Le Quang Dao street has basically completed the main items, proposed to clear the whole route in April 2025.
Planning for sea encroachment to build Ly Son airport
|
Quang Ngai - The planning of the sea encroachment to create a new land fund, expand the space to invest in building Ly Son airport is necessary, because the area of the island is not large and the population density is high.
Land acquisition nearly 110 households built overpasses, saved black spots in Hanoi
|
Hanoi - Nearly 110 households will be recovered with land and ground clearance to build overpasses at black congestion in Ha Dong and Thanh Tri districts.
The conversion car operates on Hanoi street, potentially dangerous traffic
|
Hanoi - UAZ, Jeep cars ... converted, carrying tourists operating on the streets, there are many risks of traffic safety.
The concrete bridge for more than 50 years is at risk of subsidence
|
Thanh Hoa - For many years, people in a ward in Thanh Hoa City have to go through a bridge with a hammock, seriously degraded and at risk of subsidence at any time.
The path for the visually impaired in Can Tho leads to the stump, electric pole
|
Can Tho - Instead of facilitating, making floating roads (for visually impaired people) led people to pedestrians on a towering tree on the sidewalk.
Applying for a license to relocate and cut nearly 100 trees to open the center of Hanoi wide 50m
|
Hanoi - Functional branches are applying for compassion and moving nearly 100 trees to implement the project of Ring Road 1 section of Hoang Cau - Voi Phuc.
Details of the parade and parade routes will pass on April 30
|
Ho Chi Minh City - Below is the expected roadmap for the parade and parade delegations that will move through on April 30, so that people can take the initiative in moving and monitoring.
Ho Chi Minh City announced a new traffic plan around Tan Son Nhat station
|
Ho Chi Minh City has officially announced the plan to organize the traffic organization connecting Tran Quoc Hoan - Cong Hoa, serving to connect to T3 station of Tan Son Nhat Airport.
On the occasion of 30.4-1.5, Hanoi increased more than 600 vehicles to serve passengers
|
Hanoi - Hanoi Bus Station Joint Stock Company plans to increase more than 600 vehicles to serve the travel needs of people during the holiday on April 30 - 1.5.
North - South highway in Ha Tinh basically completed, about to connect routes
|
Ha Tinh - representative of the investor of 2 projects of the North - South highway through Ha Tinh affirmed that it would be constructed to ensure the progress to clear the main route on April 28.
The 1.4km road causes hardship for people and workers
|
Vinh Long - The project to upgrade 1.4km of roads in Long Ho construction for many months is still unfinished, making people and workers face many difficulties.