Society
Changing the battery of an electric motorbike - a "piece" to help green traffic accelerate
|
In the context of fluctuating oil prices and increasing emission reduction pressure, the electric motorbike battery replacement model is emerging as a breakthrough solution in Vietnam. Not only bringing convenience to users, this model also helps reduce pressure on the power system and opens up a sustainable direction for urban traffic.
Granting special mechanisms from the Capital Law for Hanoi to handle bottlenecks
|
Hanoi - Special mechanisms from the Capital Law will help the city handle bottlenecks arising in practice.
Water level of some hydropower reservoirs in the North on March 20
|
Hydropower reservoirs in the Northern region are basically at a high level, many large reservoirs in the Northwest are approaching the normal water level and maintaining water discharge to serve power generation.
Elections in Lang Son reach almost absolute rate
|
Lang Son - The province received 615,175/61,541 voters participating in voting in the election, reaching a rate of 99.94%.
Encourage the formation of civilized energy consumption habits
|
On the morning of March 21, in Hanoi, the Ministry of Industry and Trade will organize the Launching Ceremony of "All people use energy economically and effectively and respond to Earth Hour 2026 Campaign".
Benefits increase 4 times when continuing to pay social insurance after retirement age
|
The benefit of paying social insurance after retirement age is one of the notable changes of the Social Insurance Law 2024, effective from July 1.
Reopening nuclear power projects for energy security
|
Nuclear power returns to energy planning, opening the way for sustainable development. Although it requires high technology and large capital, if overcome, Vietnam can enter a truly green energy era.
Forecast of when the rain will be concentrated in the South
|
According to the meteorological agency, rain in the South will be concentrated in the afternoon and evening.
Selecting a consulting contractor to report the pre-feasibility of the mountain tunnel in Nha Trang
|
Khanh Hoa - The locality is researching the construction of a long tunnel through Cu Hin mountain, forming an additional traffic route connecting Nha Trang with Cam Ranh airport.
Controversy over the recovery of 3.2 billion VND at the Driving Test Center in Quang Ngai
|
Former Director of Quang Ngai Provincial Driving Training and Testing Center said that the Provincial Chief Inspector needs to review the decision to recover 3.2 billion dong to supplement the income for workers at the center while the Provincial Chief Inspector confirms that the recovery is right.
A series of bottlenecks make renewable energy difficult
|
Despite the great potential for renewable energy (RE), the overlapping of legal documents and the lack of mechanisms, policies and legal corridors have caused many bottlenecks for R ever-changing energy projects when implementing.
Looking back at the design of Tran Hung Dao bridge that is about to start construction in Hanoi
|
Hanoi - Tran Hung Dao Bridge is expected to start construction in the third quarter of 2025.
Floods in Nghe An wash away bridges for people, many villages are isolated
|
Nghe An - Floods caused severe damage to many areas in Tuong Duong district, dozens of houses were swept away, and many roads were seriously eroded.
Multiple accidents on the Ho Chi Minh City - Long Thanh - Dau Giay Expressway, 5 km congestion
|
Two container trucks and two cars collided on the Ho Chi Minh City - Long Thanh - Dau Giay Expressway on the morning of May 30, causing a traffic jam on the route for more than 5 km.
The key to paving the way for Vietnam's renewable energy breakthrough
|
To achieve the goal of developing renewable energy sources according to the adjusted Power Plan VIII and towards Net Zero by 2050, Vietnam needs to quickly remove investment barriers and promote the modernization of the power grid system to maximize the potential of clean energy sources.
Coastal ghost ship in Ninh Thuan will be demolished before being salvaged
|
Ninh Thuan - The Ninh Thuan coastal spaceship is currently planned to be demolished before being salvaged.
Hai Duong proposes to build public housing and social housing after the merger
|
The fact that thousands of cadres, civil servants and public employees of Hai Duong province will work in Hai Phong City poses a big demand for travel, accommodation and living.
missing fisherman in Quang Binh leaves behind 3 fishermen in the coastal village
|
Quang Binh - Mr. Pham The Nhan, the main breadwinner of a family of 3 young children, went missing in the middle of the sea, leaving many people heartbroken and searching for him.
Hanoi reclaims land from 1,400 households to build bridges and roads worth over VND22,000 billion
|
Hanoi - It is expected that about 1,400 households will have their land reclaimed to build bridges across the Red River and Duong River and build the Ring Road 2.5, with a total capital of more than 22,000 billion VND.
Completing the Can Tho - Ca Mau expressway is a political task with no way back
|
According to Deputy Minister Pham Minh Ha, completing the Can Tho - Ca Mau expressway project is a political task and a major goal. Therefore, the units must make efforts.