Society
Before the election, be even more cautious with information on social networks
|
Recently, functional agencies in many localities have detected and handled cases of posting and sharing false information related to election work on social networks.
Driver drives in the opposite direction, blocks the car and challenges "please park all day if you like
|
Lao Cai - A car driver went in the opposite direction on Hoang Van Thu street (Sa Pa ward) and then stopped the car to block a vehicle going in the correct lane, causing traffic obstruction.
Election propaganda goes to every alley, knocking on every door in the highlands of Da Nang
|
Da Nang - Simple election propaganda sessions by the porch, by the fire are contributing to spreading the atmosphere of the democratic festival to highland villages.
Lam Dong Electricity ensures safe power supply for elections
|
Lam Dong - The electricity sector is developing a plan to be on duty 24/24 hours, ensuring safe and continuous power supply to serve polling stations in the area.
Hue City Border Guard organizes "Moon and River Festival" in the border area
|
HUE - The Mountains and Rivers Festival is organized by the Border Guard with many stage activities, election propaganda, gifts and health care for people.
The Ministry of Construction responds to traffic signals with hammock lines
|
When participating in traffic, many people wonder about the meaning and rules of movement when encountering the hammock-shaped line.
Foreign ship crashed into Phu Yen fishermen's fishing boat and fled
|
Phu Yen - While fishing at sea, the fishermen's fishing boat was broken by the ship carrying FRONT SPEY oil. After causing the accident, the cargo ship did not stop but continued to leave.
Progress of the Hoa Binh - Moc Chau Expressway project
|
After many months of construction, the Hoa Binh - Moc Chau expressway project, the section through Hoa Binh has achieved positive results in terms of progress.
Rescuing a 70-year-old woman in a fire in Quang Ninh
|
Quang Ninh - The fire that occurred on the morning of March 13 in Cam Pha City left a 70-year-old woman trapped in her house. The Fire Police force promptly rescued the victim safely.
The fence system along Sam Son coast is rusty and broken
|
Thanh Hoa - Hundreds of barriers along the Sam Son coastal walking route are rusty and broken, posing many potential dangers to people and tourists.
Many sections of Hanoi's Ring Road 4 have not been handed over
|
Hanoi strives to complete the Ring Road 4 parallel road in 2025, but up to now, there are still 18 sections of the site that have not been handed over to the contractor for construction.
Survey of the construction of a vital road connecting Dong Nai - Binh Phuoc provinces
|
Dong Nai - The Provincial People's Committee surveyed the construction location of Ma Da bridge connecting Binh Phuoc province to Ring Road 4 - Ho Chi Minh City, Long Thanh airport.
Talent attraction policy for Vietnam Financial Center
|
In the context of globalization and the strong development of the digital economy, international financial centers are increasingly affirming their important role in promoting economic growth, attracting investment capital and connecting global financial markets.
Slow handover of land, many projects are at risk of being delayed
|
Key projects in Tuyen Quang are facing difficulties due to slow handover of land. The government is making efforts to remove them to ensure construction progress.
Tuyen Quang sets a target of 70% of communes having swimming pools
|
To improve knowledge and skills in preventing drowning for children, Tuyen Quang province aims for 70% of commune-level units to have at least one swimming pool by 2035.
March returns to the memory storage site of Gas Ma - Truong Sa
|
Khanh Hoa - marks 10 years of placing stones to build the special soldier memorial area of Gac Ma, this place has become a March meeting place for the hearts of gratitude to heroes and martyrs.
Quang Nam is worried about landslides after heavy rain
|
Many cracks have appeared on the hillsides in Quang Nam after heavy rain, causing thousands of households to be worried about the risk of unusual landslides.
Lack of 6.3 million cubic meters of sand, Ho Chi Minh City Ring Road 3 is at risk of being behind schedule
|
The two sections of the Ho Chi Minh City Ring Road 3 project, over 21km long, are expected to open to traffic by the end of 2025, before the entire 76.34km route is completed on June 30, 2026. However, the construction progress is being hampered by a shortage of sand for embankment.
Reviewing the beauty of Central Highlands elephants
|
Dak Lak - The 2025 Buon Don Elephant Association was organized systematically and created its own mark, contributing to preserving the cultural identity of the Central Highlands.
Dak Nong resolutely removes obstacles for key projects
|
Dak Nong - Mr. Ho Van Muoi - Chairman of Dak Nong Provincial People's Committee requested relevant units to speed up the progress of two key projects.