Society
Gia Lai rainy season, workers focus on speeding up construction in border areas
|
Gia Lai - Despite unfavorable weather, many workers still stick to the construction site to soon complete the construction of schools in the border area.
15 more martyrs' remains found in Le Thi Rieng Park
|
Ho Chi Minh City - On August 4, functional forces gathered 15 more martyrs' remains at Le Thi Rieng Park, bringing the total number of martyrs' remains found to 197.
Huu Nghi border gate upgrades infrastructure to welcome expressway worth 11,808 billion VND
|
Lang Son - Huu Nghi - Chi Lang expressway is accelerating completion, leading to the requirement to expand internal roads, warehouses and customs clearance capacity at Huu Nghi border gate.
Forecast of heavy rain in provinces and cities in the next 2 days, dangerous weather warning
|
Northern and North Central regions are about to face widespread heavy rain; warning of potential risks of flash floods and landslides, especially in midland and mountainous areas.
Ben Thanh - Can Gio Metro accelerates construction of 920m long Soai Rap river overpass
|
Ho Chi Minh City - Ben Thanh - Can Gio Metro is accelerating the construction of the 920m long Soai Rap river overpass with many simultaneous construction fronts, aiming to be completed in 2028.
From each family to the community, energy saving becomes an inevitable trend
|
No longer just anyone's story, energy saving, fuel conversion... are becoming "blood vessels" maintaining sustainable development.
Thanh Hoa's largest waste treatment plant has resumed receiving waste
|
Thanh Hoa - After a period of temporary suspension, the largest waste treatment plant in the province has resumed receiving, contributing to stabilizing waste treatment in localities.
Recovering 3, 472.6m2 of land to implement the Tay Thang Long road project in Hanoi
|
Hanoi - Dan Phuong Commune People's Committee has just issued a decision to recover a total area of 3, 472.6m2 to implement the Tay Thang Long road construction investment project.
Latest forecast of the end of intense heat in the North
|
According to the meteorological agency, it is forecast that on April 17, widespread hot weather in the North and North Central regions will end.
Chinese shipping lines prepare to bring the largest ship to Ha Long Bay
|
Quang Ninh - Adora shipping line, headquartered in Shanghai, is preparing to bring the largest ship to Ha Long and wants to find a suitable location to place ships in Vietnam.
Forecast for the Southern region to have thunderstorms in some places from tomorrow
|
According to the Southern Hydrometeorological Station, from April 15, thunderstorms will appear in some places in the Southern region.
Scene of the apartment fire in Hanoi at noon
|
Hanoi - A fire occurred at an apartment building at No. 2 Vuong Thua Vu street (Khuong Dinh ward), smoke and fire billowed up.
Free medical examination and treatment for Khmer people during the Lunar New Year, Chol Chnam Thmay
|
Vinh Long - Responding to the Military-Civilian Tet, Chol Chnam Thmay Tet, 300 people and Khmer compatriots were health checked and provided with free medicine, creating a joyful and warm atmosphere.
Tuyen Quang sets a goal to eliminate the white area of national power grids
|
Tuyen Quang province strives to complete the investment in power supply for villages and residential areas that do not yet have national grid electricity by the end of the second quarter of 2027.
Rare pangolins discovered, people in Lam Dong voluntarily hand over to forest rangers
|
Lam Dong - A resident discovered a rare pangolin lying in the middle of the road while moving, brought it back and handed it over to functional agencies for protection.
Driving a motorbike into Thang Long Avenue due to being late for work, driver receives heavy fine
|
Hanoi - A series of motorbike drivers have been fined when entering Thang Long Avenue.
New Chairman of Da Nang Nguyen Manh Hung determined to remove land bottlenecks
|
Da Nang - New Chairman of Da Nang City People's Committee Nguyen Manh Hung pledged to drastically handle bottlenecks in projects and land that have been stuck for many years.
Long Thanh airport fuel supply system worth 2,880 billion VND is about to be completed
|
Dong Nai - Package 4.9, Long Thanh airport fuel supply system has a contract value of more than 2,880 billion VND.
Water levels of hydropower reservoirs nationwide on April 14th
|
The water level and inflow to the reservoirs at most hydropower reservoirs across the country are low, many reservoirs continue to generate electricity and do not discharge overflows.
Water level of some hydropower reservoirs in the North on April 14
|
The water level of many large lakes on the Da River system such as Hoa Binh and Son La continues to maintain power generation with high flow, and overflow has not been recorded.
