Society

Hanoi spends 30 billion VND to install items at 12 stations and Cat Linh train depot area

|

Hanoi - In the 2025 - 2026 period, metro 2A Cat Linh - Ha Dong will have additional fire prevention and fighting items installed at 12 stations and depots.

Deputy Prime Minister requests guidance on wind power support expenditure in Can Tho before July 15

|

Can Tho - Deputy Prime Minister Le Thanh Long requested relevant ministries and agencies to promptly handle recommendations from Can Tho, Soc Trang, and Hau Giang.

Voters hope to soon invest in upgrading the traffic route connecting Phu Yen with Dak Lak

|

Dak Lak - Many important recommendations were raised by voters at the Dak Lak voter contact conference.

The plan to move "abandoned" aircraft in Noi Bai to Khanh Hoa will cost about 8.7 billion

|

The aircraft abandoned in the Domestic card is valued at more than 1.7 billion. If this aircraft is transferred to Khanh Hoa, Dong Nai will lose from 8.7 billion to 9.6 billion VND.

Police proactively respond to heavy rain and floods in the North

|

The Ministry of Public Security requires police units and localities to deploy plans to prevent heavy rain, flash floods, and landslides in the North from July 10 to 12.

Mountainous provinces spend hundreds of billions of VND to build a series of stadiums

|

After completion, the stadiums with a total investment of hundreds of billions of VND will promote social development, culture and sports for the localities.

Scene of a barge carrying more than 100 tons of unknown fertilizer

|

Kien Giang - Checking the barge, the Coast Guard Region 4 Command discovered more than 100 tons of urea fertilizer but there were no documents proving its origin.

Forecast of the time when cold air will increase and cause widespread rain

|

From February 23, the cold air is forecast to strengthen and affect the North and North Central regions.

The square of the coastal tourism area is deteriorating after 1 year of use

|

Ha Tinh - Ky Ninh Sea Tourism Area Square (Ky Anh town) with a total investment of 55 billion VND, just put into use for a year, has deteriorated.

Workers dredging sludge under To Lich River

|

On February 22, dozens of workers dredged the sludge under the To Lich River to prepare to receive additional water from the Red River.

Another serious traffic jam on Khuat Duy Tien Street, Nguyen Xien

|

Hanoi - Although it is a weekend and not rush hour, Nguyen Xien and Khuat Duy Tien streets are still seriously congested, making it difficult for people to travel.

4 districts in Hanoi install cameras to record people illegally dumping waste

|

4 districts of Hanoi will install cameras to promptly detect and strictly handle violations, such as illegal dumping of waste, discharging waste at the wrong time...

Ha Giang informs about granting and exchanging driving licenses

|

The work of issuing and exchanging driving licenses (GPLX) in Ha Giang will continue to be carried out by the Department of Transport until there is an official handover document.

Searching for a worker on a missing fishing boat

|

Binh Thuan - A fishing boat was operating at sea when a worker on the boat fell into the sea and went missing.

Khanh Hoa reviews against waste of public housing assets

|

Khanh Hoa - On February 22, the leader of Khanh Hoa Provincial People's Committee said that he had directed units to urgently inspect and review public housing projects and fight waste.

Passenger bus caught fire fiercely on National Highway 1 through Binh Dinh

|

traveling on National Highway 1 through Tuy Phuoc District (Binh Dinh), a Ninh Binh-plate passenger car suddenly caught fire.

Roadmap for the construction of Ngoc Hoi bridge connecting Hanoi with Hung Yen

|

The Ngoc Hoi bridge construction project connecting Hanoi with Hung Yen is divided into 2 component project groups, with implementation period from 2025-2030.

Planting trees causing forest damage in the border belt

|

Cao Bang - 4 forces coordinated to plant trees along the border patrol road.

Latest progress of the Dong Dang - Tra Linh expressway project

|

Cao Bang - The Chairman of the Provincial People's Committee set a time frame for completing the site clearance of the first expressway through the area.

The Ministry of Finance guides the settlement of regimes for early retirees

|

Priority will be given to resolving policies and regimes for those with less remaining working time until retirement age.