Traffic
16 urban areas have not yet opened their roads, Hanoi faces the risk of prolonged congestion
|
Hanoi - Despite being put into use, 16 urban areas in Hanoi have not yet been connected to the general transport network, creating serious bottlenecks.
Current status of the intersection in Ha Dong before building an overpass to reduce congestion
|
Hanoi - An overpass worth nearly VND880 billion will be built at the intersection of Le Trong Tan Street and National Highway 6 with the expectation of helping to reduce congestion and increase connectivity.
The shape of the Bung - Van Ninh expressway has just been opened to traffic
|
Quang Binh - The Bung - Van Ninh expressway section has just been opened to traffic, contributing to promoting traffic connectivity and socio-economic development in the North Central region.
Hai Duong starts construction of provincial road 394B and opens the East-West axis road
|
Hai Duong - Hai Duong province has just started construction of provincial road 394B and opened the East-West axis road for technical traffic, contributing to the completion of traffic infrastructure.
Prime Minister cuts ribbon to inaugurate Tan Son Nhat T3 Terminal
|
HCMC - On April 19, Prime Minister Pham Minh Chinh cut the ribbon to inaugurate the Tan Son Nhat Airport Terminal T3 project.
Cao Bang new regulations on management of blue plate vehicles
|
Cao Bang - The Provincial People's Committee has just issued new regulations to effectively manage and use public vehicles (blue-plate vehicles).
Long Thanh airport control tower 2 months ahead of schedule
|
Dong Nai - The air traffic control tower project of Long Thanh airport component 2 is about 2 months ahead of schedule.
Busy laying asphalt to complete the road to Phan Thiet airport
|
Binh Thuan - About 1km of road is still being paved to complete the Phan Thiet airport road project as planned.
Metro line 1 will be put into commercial operation first, then inaugurated
|
HCMC - Metro Line 1 (Ben Thanh - Suoi Tien) will be put into commercial operation from December 22, 2024, while the inauguration ceremony will be postponed to after Lunar New Year 2025.
Can Tho - Ca Mau Expressway completes each section of construction
|
Minister of Transport Tran Hong Minh stated that for the Can Tho - Ca Mau expressway, sand and stone materials must be actively gathered and each section must be completed completely.
Current status of the road connecting 6 districts after removing the median strip
|
HCMC - Traffic on the two-wheeled lane on Vo Van Kiet Street has become more convenient after the hard median strip on this lane was removed.
Camera records dump truck being hit and turning around at roundabout
|
Binh Thuan - A dump truck was turning around a roundabout when a truck hit the side of the vehicle, causing it to spin around and was recorded by a camera.
Traffic police handle young man carrying goods like "circus" on the road
|
HCMC - Traffic police have fined a young man for carrying bulky goods like a "circus" on National Highway 1A, endangering road users.
Hanoi reclaims more than 18,000m2 of land to open a 30m wide arterial road
|
Hanoi - Thuong Tin District will reclaim more than 18,000 square meters of land in 2 communes and towns to implement the project of widening National Highway 1A from 11m to 30m.
New bridge connecting Bac Ninh - Bac Giang expected to be completed in 2026
|
Van Ha Bridge, connecting Bac Ninh - Bac Giang, is 360m long, with a total investment of about 220 billion VND; expected to be completed in 2026.
Relocating 263 trees to open a 50m road connecting Ha Dong with Thanh Tri
|
Hanoi - It is expected that 263 trees will need to be cut down and relocated to implement the project to expand Provincial Road 70, Ha Dong - Van Dien section, 7km long, with a capital of nearly 5,500 billion VND.
A key bridge in Thu Duc worth over 700 billion is about to open a branch
|
HCMC - These days, at the Tang Long bridge construction site, workers are urgently pushing the progress to complete 1 branch of the bridge in time to open to traffic at the end of December 2024.
Morning in the West: There will soon be a bridge worth nearly 4,000 billion connecting 2 provinces in the West
|
Morning of the Western Region, December 10: Localities in the Mekong Delta urgently deploy to arrange and streamline the apparatus; Construction of the second largest cable-stayed bridge in Vietnam;...
Project to open 50-60m wide road in Hanoi after 2 years of construction
|
Hanoi - After 2 years since the groundbreaking date, the project to expand National Highway 6, Ba La - Xuan Mai section, has only been implemented in some sections through Chuong My district.
Traffic accident in Hoa Binh, 1 Korean died
|
Hoa Binh - Police are investigating a traffic accident that killed a Korean.