Traffic
Current status of the intersection in Ha Dong before building an overpass to reduce congestion
|
Hanoi - An overpass worth nearly VND880 billion will be built at the intersection of Le Trong Tan Street and National Highway 6 with the expectation of helping to reduce congestion and increase connectivity.
The shape of the Bung - Van Ninh expressway has just been opened to traffic
|
Quang Binh - The Bung - Van Ninh expressway section has just been opened to traffic, contributing to promoting traffic connectivity and socio-economic development in the North Central region.
Hai Duong starts construction of provincial road 394B and opens the East-West axis road
|
Hai Duong - Hai Duong province has just started construction of provincial road 394B and opened the East-West axis road for technical traffic, contributing to the completion of traffic infrastructure.
Prime Minister cuts ribbon to inaugurate Tan Son Nhat T3 Terminal
|
HCMC - On April 19, Prime Minister Pham Minh Chinh cut the ribbon to inaugurate the Tan Son Nhat Airport Terminal T3 project.
Starting construction of the 265 billion VND road connecting National Highway 28 with National Highway 1
|
Binh Thuan - The 4.5km long route connects National Highway 28 - the expressway intersection to National Highway 1 to shorten the distance and travel time.
New regulations on road toll collection from 1.1.2025
|
A representative of the Ministry of Transport said that from January 1, 2025, new regulations on road toll collection will be applied.
Improve the capacity of 4-wheel electric vehicles to avoid traffic jams
|
According to experts, in order for 4-wheel electric vehicles to become a means of connecting railway lines and bus routes, many more changes are needed.
Traffic accident on Highway 27 leaves 2 dead
|
Dak Lak - A serious traffic accident just occurred on National Highway 27, passing through Lak district, causing 2 deaths on the spot.
Good news about the project to open a 46-56m wide arterial road in Hanoi
|
Hanoi - It is expected that in 2024, Thanh Tri district will complete site clearance for the expansion of National Highway 1A after many years of delay.
Tay Ho: Road subsidence creates deep holes causing traffic safety problems
|
Hanoi - For many years, To Ngoc Van Street (Tay Ho) has had subsidence and deep holes, causing serious traffic insecurity.
Investing 230 billion VND to build a rest stop on Van Phong - Nha Trang highway
|
Khanh Hoa - The investor is bidding to find an investor to implement the rest stop project on the Van Phong - Nha Trang highway with a total investment of more than 230 billion VND.
Preparing to demolish the remaining section of Phong Chau bridge
|
Phu Tho - The remaining section of Phong Chau bridge at risk of collapse, mainly in Phung Nguyen commune, Lam Thao district, is being prepared to be demolished and cleared.
A woman in Thai Binh died on the spot after colliding with a car
|
Thai Binh - After a strong collision with a car coming from the opposite direction, a woman in Nam Cuong commune, Tien Hai district died on the spot.
Revealing the five-digit license plates worth billions in the auction on November 18
|
License plate auction: On November 18, Vietnam Joint Stock Auction Company will auction 10,000 license plates in 6 time frames.
Two new 30-40m wide roads to be built in Hoang Mai, Hanoi
|
Hanoi - Hoang Mai District will build two 30-40m wide roads to help synchronize traffic infrastructure, contributing to the socio-economic development of the southern gateway of the city.
A series of super cool license plates will be available in the session on November 25-26
|
License plate auction: Vietnam Joint Stock Auction Company has announced a list of 20,000 license plates expected to be auctioned on November 25-26, 2024.
Adjusting the hundred billion road project in the heart of Son La city
|
Son La - The project to build a road with a total investment of hundreds of billions of VND in Son La city has just been approved for adjustment by the Provincial People's Committee.
Traffic project stuck because natural forest has not been cleared
|
Quang Tri - The natural forest area that the road passes through has not been cleared, causing the road project to be stuck and behind schedule.
The 2,600 billion VND belt project connecting Ho Chi Minh City - Dong Nai is behind schedule
|
Dong Nai - 3 main packages in the component project 3 of Ho Chi Minh City's Ring Road 3 passing through Nhon Trach district are behind schedule, with only 55% of the construction site completed.
Proposal to expand the range of 4-wheel electric vehicles is well received
|
Currently, information about the proposal to expand the scope of operation of 4-wheel electric vehicles by the Hanoi Department of Transport is receiving much attention from the people.