Traffic
Current status of the intersection in Ha Dong before building an overpass to reduce congestion
|
Hanoi - An overpass worth nearly VND880 billion will be built at the intersection of Le Trong Tan Street and National Highway 6 with the expectation of helping to reduce congestion and increase connectivity.
The shape of the Bung - Van Ninh expressway has just been opened to traffic
|
Quang Binh - The Bung - Van Ninh expressway section has just been opened to traffic, contributing to promoting traffic connectivity and socio-economic development in the North Central region.
Hai Duong starts construction of provincial road 394B and opens the East-West axis road
|
Hai Duong - Hai Duong province has just started construction of provincial road 394B and opened the East-West axis road for technical traffic, contributing to the completion of traffic infrastructure.
Prime Minister cuts ribbon to inaugurate Tan Son Nhat T3 Terminal
|
HCMC - On April 19, Prime Minister Pham Minh Chinh cut the ribbon to inaugurate the Tan Son Nhat Airport Terminal T3 project.
Starting construction of the 265 billion VND road connecting National Highway 28 with National Highway 1
|
Binh Thuan - The 4.5km long route connects National Highway 28 - the expressway intersection to National Highway 1 to shorten the distance and travel time.
Camera "accuses" many bus drivers of traffic violations
|
Many bus drivers are heavily fined for habits such as using cell phones and not wearing seat belts while driving.
Spending more than 2,500 billion to upgrade Highway 70, Ha Dong - Van Dien section
|
Component project 2 "Renovation and upgrading of Highway 70, Ha Dong - Van Dien - Tu Hiep intersection section" was spent more than 2,500 billion to implement.
Morning news: Ho Chi Minh City has not completed 4 road projects for 10 years
|
Morning news 8.12: Forecast of severe cold in the North; Ho Chi Minh City has not yet completed 4 main roads; Russia may deploy Oreshnik missiles in Belarus;...
Man smashes car after traffic collision
|
Binh Duong - A motorbike collided with a car while changing direction. The man on the motorbike attacked the car driver, causing traffic congestion.
Ho Chi Minh City will reclaim land from 1,118 households to widen National Highway 1 to 60m
|
Ho Chi Minh City plans to reclaim 35.48 hectares of land from 1,118 households in Binh Chanh and Binh Tan districts to implement the project of widening National Highway 1 to 60m.
1 ton of rotten organs discovered on the way to Dien Bien
|
Hoa Binh - Authorities have just discovered a passenger bus running on National Highway 6 carrying 1 ton of foul-smelling animal organs on its way to Dien Bien.
Inside the most beautiful central station of metro line 1
|
HCMC - Ben Thanh Station of metro line 1 has been completed and is expected to be put into operation on December 22.
Road project of over 4,200 billion from Phan Thiet straight to the highway
|
Binh Thuan - Planning plan for a road connecting Phan Thiet city center straight to Vinh Hao - Phan Thiet highway with the surveyed route.
Why does the 1,300 billion project in Dien Bien have to be extended for another year?
|
The 1,300 billion VND transport project in Dien Bien will have to be extended by another year because it cannot be completed by the end of 2024 as planned.
"Hurry, forget" - the common excuse when violating the law of not wearing a helmet
|
Helmets are a measure to limit injuries for people sitting on motorbikes and scooters in case of an accident. However, many people still forget to wear helmets when going out.
Quang Tri airport project faces difficulties due to slow site clearance
|
Quang Tri - The price has not been agreed upon, the land origin is unknown and the resettlement area is not yet available, so the site clearance for the Quang Tri airport project has not been completed.
Hanoi reclaims land from nearly 800 households to expand arterial roads
|
Hanoi - It is expected that 788 households in two districts will have their land reclaimed to expand a 7km-long arterial road, with an investment capital of more than VND5,480 billion.
4 main roads in Thu Thiem remain unfinished after 10 years
|
HCMC - After 10 years of construction, 4 main roads in Thu Thiem New Urban Area (Thu Duc City) are still not completed due to land acquisition problems.
Progress of 47km, 4-lane route to relieve traffic jams in Ho Chi Minh City
|
After 18 months of construction, Beltway 3 passing through Ho Chi Minh City is more than 47km long (passing through Thu Duc, Cu Chi, Hoc Mon, Binh Chanh) with 4 expressway lanes, reaching 24.3% of the volume.
Cause of Highway 6 traffic accident that killed 12-year-old girl
|
Hoa Binh - The police have determined the cause of the traffic accident on National Highway 6 through Tan Lac district at midnight that killed a 12-year-old girl.