Traffic
There should be regulations and standards on helmets for children under 6 years old
|
I have a friend who takes her 5-year-old daughter to kindergarten by motorbike every day. On her head was a standard helmet, while her little daughter was wearing only a pink soft fabric helmet.
HCMC builds 4-lane elevated road to relieve traffic jams at Northeast gateway
|
HCMC - The 3.2 km long elevated road with 4 lanes on National Highway 13 is expected to relieve serious traffic congestion at the city's Northeast gateway.
Vinh Hao - Phan Thiet Expressway shows erosion, dangerous frog jaw openings
|
Lam Dong - The roadbed of the Vinh Hao - Phan Thiet expressway has eroded and has open frog jaw, causing a risk of insecurity for vehicles participating in traffic.
A section of National Highway 1A through Vinh Long will be repaired in the third quarter of 2026
|
The Ministry of Construction has just responded to Vinh Long voters about the repair of National Highway 1A through Binh Minh Bus Station.
Heavy rain causes landslides in Son La, 1 person injured, National Highway 4G is partially congested
|
Son La - Heavy rain caused local flooding on the 4G National Highway section through Chieng Khuong commune, landslides injured 1 person.
The appearance of terminal T3 has reached 95%, ready for operation
|
HCMC - After more than two years of construction, Tan Son Nhat airport's T3 terminal is 95% complete, expected to be inaugurated on April 30, celebrating the 50th anniversary of the liberation of the South.
Land clearance problems, 122 billion VND project in Can Tho has been stuck for 2 years
|
Can Tho - The traffic project worth more than 122 billion VND has been delayed for more than 2 years, due to problems with 175m of uncleared land.
Traffic will be reorganized when demolishing Ham Ca Map building
|
Hanoi - The authorities are reorganizing traffic at Dong Kinh - Nghia Thuc Square during the demolition of Ham Ca Map building.
Hanoi to enforce land acquisition to build 2 traffic projects
|
Hanoi - The authorities will forcibly reclaim land from a number of households to implement the project to expand National Highway 1A and complete the construction of the new route of Provincial Road 427.
The first day of Ho Chi Minh City implementing the issuance and exchange of driving licenses in wards
|
HCMC - On the first day (March 17), Binh Tho Ward Police received applications for granting and exchanging motorcycle driving licenses, many people were surprised because it was too convenient.
After more than 1 hour, the traffic police only discovered 2 people violating alcohol concentration
|
Hanoi - Continuously stopping vehicles for inspection, however, traffic police only discovered 2 cases of alcohol concentration violations on the afternoon of March 17.
Causes of a series of traffic accidents in Dak Nong
|
Dak Nong - A tractor-trailer was going downhill when it crashed into a truck parked on the side of the road and crashed into another vehicle, causing a series of traffic accidents, killing one driver.
Car hoes small truck while parked, causing a series of accidents
|
Ba Ria - Vung Tau - Seeing the driver of the car causing the accident showing signs of being unconscious, people used rocks to insert into the wheel to prevent the car from continuing to circulate.
Ho Chi Minh City residents convenient when changing driving licenses in the ward
|
HCMC - Binh Tho Ward Police have received applications for granting and exchanging motorcycle driving licenses. Many people coming to do the procedures were surprised because it was too convenient.
Current status of more than 8km of National Highway 91B is broken after patching
|
Hau Giang - National Highway 91B through Hau Giang province is deteriorating and is expected to start construction in early 2026.
HCMC builds 4-lane expressway, modern railway connecting Tay Ninh
|
Ho Chi Minh City strengthens connections with Tay Ninh province through a series of key transport projects such as the Ho Chi Minh City - Moc Bai expressway, expanding National Highway 22 and modern railway.
Starting schedule for 2 traffic projects worth 8,500 billion VND in Hanoi
|
Hanoi - Two important transport projects in the city center, with an investment capital of more than 8,500 billion VND, are starting construction after many years of stagnation.
Expanding the 30km long road connecting 2 districts of Dong Nai province
|
Dong Nai - The project to upgrade and expand DT 769 road, nearly 30km long, passes through 2 districts of the province connecting Dau Giay intersection and Long Thanh airport.
Lack of materials, Hoa Lien - Tuy Loan Expressway at risk of being behind schedule
|
The Hoa Lien - Tuy Loan Expressway (Da Nang) is being rushed to complete to open to traffic at the end of August, but is still stuck with land clearance and lack of materials that need to be resolved soon.
The nightmare with homemade three-wheeled vehicles
|
Many times I have almost had traffic accidents because of homemade three-wheeled vehicles carrying bulky goods running on the road.