Traffic

Hai Duong starts construction of provincial road 394B and opens the East-West axis road

|

Hai Duong - Hai Duong province has just started construction of provincial road 394B and opened the East-West axis road for technical traffic, contributing to the completion of traffic infrastructure.

Prime Minister cuts ribbon to inaugurate Tan Son Nhat T3 Terminal

|

HCMC - On April 19, Prime Minister Pham Minh Chinh cut the ribbon to inaugurate the Tan Son Nhat Airport Terminal T3 project.

Starting construction of the 265 billion VND road connecting National Highway 28 with National Highway 1

|

Binh Thuan - The 4.5km long route connects National Highway 28 - the expressway intersection to National Highway 1 to shorten the distance and travel time.

From today, a series of roads in the center of Ho Chi Minh City will be closed to traffic for many nights

|

HCMC - From 6pm to 10am on April 19, 26, 29 and 30, many roads in the city center will be closed to traffic.

Starting construction of Ho Chi Minh City Ring Road 2 project, section through Thu Duc city

|

HCMC - The Ho Chi Minh City Ring Road 2 project, a package to relocate technical infrastructure and clear mines - phases 1 and 2 started construction on April 19.

"3 cars in, 1 car out", parking lot violations face difficulty in finding a solution

|

Currently, many parking lots for vehicles in violation are overloaded because the owners have not come to claim them for a long time.

Northwest end of the day: 546 billion road connecting Noi Bai - Lao Cai highway

|

546 billion VND road connecting Noi Bai - Lao Cai highway; Pesticides dumped to poison neighbors; Garbage surrounds Muong Thanh rice fields...

People look forward to walking on the 512 billion VND bridge connecting District 7 and Nha Be

|

HCMC - Local people are eagerly awaiting the day when traffic can travel on Rach Dia bridge connecting District 7 and Nha Be district after many years of waiting.

Close-up of the Thai Nguyen - Bac Giang connecting road, more than 1 year ahead of schedule

|

Thai Nguyen - The section connecting Pho Yen City to Hoa Son Bridge to Bac Giang, part of the connecting road project, was completed more than 1 year ahead of schedule.

Passenger bus crashes into electric pole, kills a woman in Binh Dinh

|

Binh Dinh - On November 22, the leader of Tuy Phuoc Traffic Police Station under the Traffic Police Department of Binh Dinh Province Police confirmed that a traffic accident had just occurred, causing 1 death.

Motorbike slipped and crashed into shipper's car, 1 person died

|

HCMC - On November 22, Thu Duc City Police are investigating the cause of a traffic accident that left one person dead.

Fined for overpaying, the "tiger pounced" driver regretted overloading

|

Hanoi - During the night of November 21 and early morning of November 22, Traffic Police Team No. 6 arranged 2 traffic police teams using specialized cars to patrol and handle a series of overloaded vehicles, including Howo dump truck drivers (also known as "tiger" trucks).

On the construction site of the 6-lane road worth nearly 500 billion at the Northwest gateway

|

The project to renovate and upgrade National Highway 6 at the Northwest gateway with a total investment of nearly 500 billion VND and a scale of 6 lanes is being accelerated.

Parents also punished for student riding bareheaded motorbike with three people in a car

|

Hanoi - Authorities have identified a group of students who committed a series of traffic violations that have caused public outrage.

Current status of the southern gateway road planned to build an elevated road

|

HCMC - Nguyen Huu Tho Street, connecting Nguyen Van Linh (District 7) to Ben Luc - Long Thanh Expressway (Nha Be District), is expected to be built as a 4-lane elevated road.

Da Nang collects cashless fees in driving tests

|

Da Nang officially piloted software to monitor exams and collect cashless fees in driving tests.

Serious accident leaves 1 dead, 1 injured

|

Thanh Hoa - A traffic accident between a truck and a motorbike left 1 person dead and 1 injured.

Focus on solving the coastal road through Quang Binh

|

Quang Binh - Component project 1 - Coastal road is still stuck in land clearance, the locality has had thorough implementation plans to speed up progress.

Bridge connecting Dong Nai and Ho Chi Minh City to be completed before Lunar New Year 2025

|

Dong Nai - Nhon Trach bridge project under component 1A of Ho Chi Minh City Ring Road 3 is expected to be completed before Lunar New Year 2025.

Technology motorbike taxis at risk of having their apps locked because of "customer favoritism"

|

A motorbike taxi driver took a passenger onto the Thang Long Avenue highway (Hanoi) because the passenger was afraid of being late for work.