Traffic
Provincial road 101 in Son La is blocked due to heavy rain and landslides
|
Son La - Heavy rain causes landslides on the positive slope on provincial road 101, passing through Doan Ket commune, causing traffic paralysis, expected to open to traffic until April 30.
Calculating travel time, people "avoid" traffic jams after holidays
|
Hanoi - In the afternoon of April 27, on the last day of the Hung Kings Commemoration holiday, many people actively moved early to avoid traffic jams.
North - South expressway through Gia Lai opens to traffic before the April 30 holiday
|
Gia Lai - Nearly 178km of the North - South expressway through Quang Ngai and Gia Lai will be opened to traffic from noon on April 29, before the April 30 - May 1 holiday, helping to reduce vehicle load on National Highway 1.
Phan Thiet Civil Airport will open the sky, attracting investment
|
Lam Dong - Phan Thiet Civil Airport was started on April 27. When completed, it will attract investment and create thousands of jobs for workers.
Hanoi gateway is crowded, bus station is clear after the Giỗ Tổ holiday
|
After the Hung Kings Commemoration holiday, the volume of vehicles from provinces pouring into Hanoi caused many gateway routes to become crowded.
Hot Saigon: Technical traffic of Nguyen Thi Minh Khai overpass and National Highway 13 will open in December
|
Hot Saigon 4.12: Opening of Nguyen Thi Minh Khai Bridge and National Highway 13 in December 2025; Public and private hospitals and the distance for patients to score.
Two trucks collide on Chuoi Pass in Lam Dong, causing local traffic congestion
|
Lam Dong - The strong collision caused severe damage to both trucks, causing local congestion on National Highway 20 in the Chuoi Pass area.
Another deep flooding point on National Highway 1 through Lam Dong
|
Lam Dong - Floodwaters caused deep flooding at km1700 of National Highway 1, causing traffic congestion.
Close-up of a large, long crack appearing on National Highway 1 through Deo Ngang
|
Quang Tri - People discovered a large crack on National Highway 1 through Deo Ngang, stretching for tens of meters, posing a potential risk of landslides.
HCMC experienced a traffic jam at the end of the year, up 24% over the same period
|
HCMC - Traffic congestion increased by 24% compared to the same period in 2024, the average traffic speed of the whole city reached 34.9 km/h.
Dong Nai invests in 3 routes and Xom La bridge connecting Ho Chi Minh City
|
Dong Nai - D21 road project, D30 road, Pham Van Dieu street and Xom La bridge are implemented from the provincial budget connecting Ho Chi Minh City.
The Traffic Department states the reason for the delay in the opening of the first elevated road in Ho Chi Minh City
|
HCMC - The 14.7 km long eastern elevated road section of Ho Chi Minh City Ring Road 3 will only be technically open to traffic on December 19, 2025, instead of officially opening as planned.
People are excited when Thanh Duc Street is completed after 2 years of waiting
|
Vinh Long - Cai Chuoi Street, Thanh Duc Ward was completed after the reflection of Lao Dong Newspaper, people were excited and happy.
Hanoi strengthens safe driving skills training for students
|
Hanoi Police coordinate with schools to organize training and foster legal knowledge and safe motorbike driving skills for students.
Diversifying traffic on Prenn Pass - the gateway to Da Lat to overcome landslides
|
Lam Dong - The authorities organized traffic diversion on Prenn Pass in Xuan Huong - Da Lat Ward to serve the landslide recovery work.
Steel block on tractor-trailer crashes into motorbike, injuring one person
|
HCMC - Steel blocks fell from the trailer of a tractor-trailer onto the road, colliding with a motorbike, injuring the driver.
The race of the last 15 days at the Can Tho - Ca Mau expressway construction site
|
Can Tho - In just 15 days, the Can Tho - Ca Mau expressway will officially open to traffic. The project has an investment capital of more than VND 27,500 billion, and is completing the final items.
Scene of the accident at the intersection of My Phuoc - Tan Van road that killed a man
|
HCMC - The motorbike and truck accident that occurred at noon on December 4 at the intersection of My Phuoc - Tan Van and Tran Ngoc Len streets killed Mr. T.V.L.
Large-scale landslide, Prenn Pass - gateway to Da Lat is temporarily closed
|
Da Lat - A large amount of rock and soil and forest trees from the embankment tens of meters high collapsed, burying the surface of Prenn Pass, paralyzing traffic on this route.
Limit height and vehicle weight across Tan Thuan 1 Bridge, Ho Chi Minh City
|
HCMC - On December 4, the Traffic Police Department announced a plan to adjust traffic organization in the Tan Thuan 1 bridge area (Tan Thuan ward), applicable from December 6, 2025.