Traffic
Hiding license plates to avoid traffic tickets, 7 teenagers handled by Dong Thap traffic police
|
Dong Thap - Traffic police discovered 7 teenagers using tape to cover license plates to evade traffic tickets, and made a record of violations.
Ben Thanh - Thu Thiem Metro opens axis connecting Ho Chi Minh City with Long Thanh airport
|
Ho Chi Minh City - Ben Thanh - Thu Thiem Metro, 6 km long, with a total capital of 46.300 billion VND, will start construction tomorrow morning (April 29), helping to increase connectivity between the center of Ho Chi Minh City and Long Thanh airport.
Fining driver for overtaking barriers to warn of impending train
|
Quang Tri - Driver fined 5 million VND, license revoked for 2 months for crossing a level crossing when the warning signal for a train to arrive.
65,573 billion VND to extend the metro line from Ho Chi Minh City to Dong Nai and Long Thanh airport
|
The project to extend the Ben Thanh - Suoi Tien Metro line to Dong Nai and Long Thanh airport has a total investment of 65,573.8 billion VND, applying BT contract type.
Traffic on the first day after the Giỗ Tổ holiday, many points are locally congested
|
Hanoi - On the morning of April 28, the first working day after the Giỗ Tổ holiday, traffic on central streets recorded contrasting images.
Many households voluntarily hand over the site for the Vu Cong Dan road project, Hai Phong City
|
Hai Phong - Currently, the majority of people have agreed to hand over the site, contributing to speeding up the progress of the Vu Cong Dan road project, Tu Minh ward.
Completed repair of erosion on the edge of the road on the Vinh Hao - Phan Thiet Expressway
|
Lam Dong - The concrete edge of the water barrier that was blocked and removed is believed to be the cause of erosion on the road edge on the Vinh Hao - Phan Thiet Expressway and has now been repaired.
finalizing the completion time of 2 road and railway bridges across rivers in Hanoi
|
Hanoi will complete 2 road and railway bridges across the Duong River, with a total investment of nearly VND 1,850 billion by 2026.
In the early stages of Long Thanh airport, priority should be given to cargo exploitation and support for Tan Son Nhat
|
According to Associate Professor, Dr. Nguyen Thien Tong, in the first phase, Long Thanh airport should prioritize cargo exploitation, logistics service development, and support Tan Son Nhat airport.
Bus collides with truck, 2 injured trapped in cabin
|
Ha Tinh - A bus collided with a truck on National Highway 8, injuring the bus driver and a passenger.
Lottery ticket seller on motorbike died after colliding with a car on National Highway 1
|
Lam Dong - The collision between a motorbike and a car caused the motorcyclist to die on the spot on National Highway 1.
Thanh Hoa announces emergency situation of landslides on spillway in Quy Luong commune
|
Thanh Hoa - Due to the impact of storm No. 5, the spillway project in Quy Luong commune suffered serious landslides, so the Provincial People's Committee has declared a natural disaster emergency.
Students riding motorbikes over 50cc are still allowed to collect tickets right in school
|
Hanoi - Although they are not old enough to drive vehicles over 50cc, many students still use them and park them in their school's parking lot.
HCMC Chairman hands over a road rongter than 100 m and many bridges in the East
|
Ho Chi Minh City assigned the task of implementing a key project to open a 100 m wide road connecting Hanoi Highway with Ring Road 3 and build a 4-storey Go Cong intersection.
Close-up of the system to help lift the clearance of Binh Trieu 1 bridge weighing 11,000 tons
|
HCMC - The project to lift the clearance of Binh Trieu 1 bridge is currently about 75% complete. The project is currently about 68 cm high, aiming for a target of more than 1 m.
Multiple collisions in Thu Thiem tunnel, traffic congestion
|
HCMC - The series of collisions in Thu Thiem tunnel caused prolonged congestion. The authorities are making efforts to regulate and handle the scene.
Morning news 19.9: Hanoi enforces land acquisition for a 20.5 - 93.6m wide central road
|
Morning news on September 19: Hanoi enforces land acquisition for road construction in the center with an area of 20.5 - 93.6m; Nguyen Thuy Linh is examined for injury before returning home;...
Heavy rain causes deep flooding, traffic jams for kilometers in Ho Chi Minh City
|
HCMC - On the evening of September 18, a prolonged heavy rain caused many areas in HCMC to be deeply flooded and congested for a long time.
Paying traffic fines using QR Codes, people in Ho Chi Minh City say quickly and transparently
|
HCMC - Traffic violators in HCMC believe that the procedure for paying traffic fines using on-site QR Codes is transparent and time-saving.
Can Tho prepares to do 2 traffic projects worth 14,000 billion VND
|
Can Tho - 2 projects have a total capital of nearly 14,000 billion VND, most of which is Japanese loans.