Traffic
The 6,400 billion VND, 8-lane road is about to be completed in Ninh Binh
|
Ninh Binh - The Nam Dinh - Lac Quan - coastal road has 8 lanes and is expected to be completed in November 2025.
The hundred-billion-dong road in Quang Tri is about to be completed, there is a choice not to go through the BOT station
|
Quang Tri - When Hung Vuong Street connects the East-West Economic Corridor and the Southeast Quang Tri Economic Zone, people have the choice not to go through the road with a BOT toll station.
The project to build a 4,800 billion VND road will accelerate and expand the connection between Tay Ninh - Ho Chi Minh City
|
Tay Ninh - The 823D road construction project, with a total capital of more than VND4,800 billion, is accelerating construction, expected to be completed in 2025, and will connect directly with Ho Chi Minh City.
Arrest of the subject who assaulted an elderly man after a traffic collision in Ho Chi Minh City
|
HCMC - HCMC Police have temporarily detained Nguyen Lam Minh Tuan, a car driver who beat someone in the middle of the road after a traffic collision.
HCMC is about to start construction of 3 key transport projects worth over VND52,500 billion
|
HCMC - Metro No. 2, Nguyen Khoi bridge, Ho Chi Minh City - Long Thanh expressway access road with a total capital of more than VND 52.500 billion will start construction in the last months of 2025.
Tet on the highway worth over 27,500 billion VND in the West
|
Although it is New Year's Day, at the Can Tho - Ca Mau highway construction site, workers and engineers are still working non-stop.
Traffic police on the road all night long to ensure smooth traffic
|
Hanoi - To ensure smooth traffic and people can enjoy fireworks, the Traffic Police force has been on duty all night.
For the first time, Ho Chi Minh City residents welcome the New Year with Metro Line No. 1
|
HCMC - At Metro Line 1 stations, crowds of people lined up to board the train and travel to the city center to watch fireworks and welcome the new year 2025.
Bidding for 1 package of Long Thanh airport connecting road project
|
Dong Nai - A consortium of two contractors won a bid worth over 200 billion VND for the project to build provincial road 25C connecting Long Thanh airport.
HCM City traffic police and people go to the street to collect nails
|
HCMC – HCMC Traffic Police have coordinated with local residents to remove nails and prevent "nail thieves" to ensure traffic safety on National Highway 1A.
The old bridge is fenced off because of deterioration, the new bridge is not yet completed
|
Quang Tri - The old An Mo bridge has deteriorated after many years of exploitation so it has been fenced off, but the new bridge has not been completed, making travel difficult.
Close-up of the 50 billion VND bridge in Yen Bai that just opened to traffic
|
Yen Bai - After nearly 2 months of renovation, Van Phu bridge has now completed all items and opened to traffic.
Three traffic jam black spots on Hanoi's main roads await "rescue"
|
Hanoi - The main road connecting Ha Dong district with Thanh Tri district currently has 3 black spots of traffic congestion waiting for a project worth nearly 5,500 billion VND to "rescue".
4,800 billion VND road to "rescue" Tan Son Nhat traffic jam reaches 88% of volume
|
HCMC - The Tran Quoc Hoan - Cong Hoa connecting road, costing over VND4,800 billion, has reached 88% completion, and is expected to open the entire route by the end of February 2025, reducing traffic congestion at Tan Son Nhat airport.
Hot in Saigon: Expected to start construction of Can Gio port worth 4.8 billion USD
|
Hot News Saigon December 30: Construction of Can Gio port worth 4.8 billion USD expected to start in 2025; Ho Chi Minh City Ring Road 3 sprints to the finish line;...
Straightening the Cat Lai bridge approach road connecting Ho Chi Minh City and Dong Nai
|
Dong Nai agreed on a plan to adjust the route of the Cat Lai bridge project across the Dong Nai river connecting Thu Duc city and Ho Chi Minh city.
Bac Lieu officially has a 1,450 billion ring road
|
Bac Lieu - That is the outer ring road connecting Hoang Phat Urban Area, Ward 1, Bac Lieu City to the sea.
Key fishing area, but Phu Quy island has no fishing port yet
|
Binh Thuan - Phu Quy island district is a key fishing area but has no fishing port, causing difficulties and inadequacies in implementing regulations on fishing port docking.
Sustainable development, the driving force of the real estate market
|
In the period when the real estate market of "surfing investment" and speculation is showing signs of slowing down, giving way to real housing needs, for the real estate market, sustainability is gradually becoming the key to increasing project competitiveness and becoming a core factor in urban development planning.
From 2025, what level of alcohol concentration violation will not result in driver's license revocation?
|
From January 1, 2025, depending on the level of alcohol concentration violation, violators may have their points deducted or their driving license revoked.