Traffic

The pain of encroachment on the road corridor on National Highway 6

|

Hanoi - The situation of encroachment on the road corridor on National Highway 6, the section passing through Yen Nghia ward for many years, poses a potential risk of insecurity.

People in the Northeast of Ho Chi Minh City have more options to avoid traffic jams on Binh Trieu Bridge

|

Ho Chi Minh City allows Binh Quoi ferry terminal to operate again to serve the travel needs of people in the Northeast region and reduce traffic pressure at Binh Trieu bridge.

The risk of landslides still lurks on the La Son - Hoa Lien Expressway

|

HUE - Historical floods caused rocks and soil from the mountain slopes to fall down, burying many sections of the La Son - Hoa Lien Expressway and Provincial Road 14B, and the risk of landslides still exists.

Vinh Airport is expected to reopen from December 19, 2025

|

Nghe An - After more than 5 months of suspension of operation for repair and upgrading, Vinh airport is expected to welcome the first flight back on December 19, 2025.

The most congested road in Ho Chi Minh City is about to be expanded, people are happily waiting

|

HCMC - Nguyen Tat Thanh Street is one of the most congested routes in HCMC, exceeding the designed capacity by 140%, and is about to be expanded, making people excited and happy.

The current situation of titanium mines causes the DT.719B road project to stagnate

|

Binh Thuan - 3.8 km through the titanium mine that has not been cleared yet has caused the project to renew the coastal road DT.719B, Phan Thiet - Ke Ga section, to "standstill".

2 accidents caused 3 deaths in Thuy Nguyen, Hai Phong

|

On January 21, the Traffic Safety Committee of Hai Phong City informed about an accident involving a tractor-trailer that left one person dead.

Quang Tri promotes the implementation of key transport projects

|

Quang Tri - Quang Tri province requests relevant departments, branches and sectors to promote the progress of key transport projects in the area.

1,300 billion VND traffic project in Dien Bien on Tet holiday

|

In the days leading up to Lunar New Year 2025, the working atmosphere at the construction site of the 1,300 billion VND traffic project in Dien Bien is still bustling.

Rach Mieu Bridge is congested, traffic police of 2 localities are trying to regulate

|

Tien Giang - Rach Mieu Bridge has local congestion, the traffic police of the two localities have actively coordinated to regulate and reduce this situation.

4-lane bridge opens, eliminating bottleneck in the west of Ho Chi Minh City

|

HCMC - On the morning of January 21, Tan Ky - Tan Quy bridge (Binh Tan district) with a total investment of nearly 500 billion VND officially opened to traffic, helping to reduce traffic congestion at the western gateway of the city.

Close-up of the area where many out-of-province vehicles are fined in Hanoi

|

Hanoi - The section passing through Bach Mai Hospital gate (Giai Phong Street, Hai Ba Trung District) is an area where many vehicles with out-of-province license plates are fined.

Passengers taking Metro Line 1 must buy handwritten paper tickets

|

HCMC - Many passengers at the National University station on Metro Line 1 reported that the automatic ticketing system was faulty, forcing them to buy paper tickets with cash.

Final site handover for expressway project through Quang Binh

|

Quang Binh - The North-South Expressway project, a section of more than 126km long, has completed site clearance.

HCMC residents can easily buy Metro train tickets on the first day of toll collection

|

HCMC - After 30 days of free commercial operation, metro line 1 has now officially started collecting fees to serve the needs of the people.

The highest ticket price for the Bac Giang - Lang Son highway is over 450,000 VND

|

The ticket price for the Bac Giang - Lang Son expressway at the Voi town intersection is up to 454,000 VND/trip for overweight trucks.

HCMC residents start paying for Metro

|

HCMC - Since early morning, many passengers have been lining up at Ben Thanh Station (District 1) to wait to pay for their train tickets. Today (January 21), Metro Line No. 1 started collecting ticket money.

Vinh Hao - Phan Thiet expressway stop is not yet in operation

|

Binh Thuan - Postponing the operation time to wait for approval of the traffic safety plan to temporarily operate the Vinh Hao - Phan Thiet expressway rest stop at Km205.

Intersections in Hanoi are sometimes paralyzed due to traffic conflicts

|

Hanoi - Traffic at Thanh Xuan intersection these days is very tense, sometimes paralyzed due to traffic conflicts.

Hot in Saigon: Hundred billion dong bridge in the Southwest area before opening to traffic

|

Hot News in Saigon on January 20: Hundred billion dong bridge in the Southwest area before opening to traffic; Police work with people who arbitrarily adjust traffic lights in Ho Chi Minh City;...