Traffic

Workers struggle amid the sound of drilling machines and excavators at the underpass construction site worth nearly 800 billion VND

|

Hanoi - The Kim Dong - Giai Phong underpass project is being urgently constructed, workers are sticking to the construction site and expect to bring the project on schedule by the end of this year.

Collision between car and motorbike leaves 3 injured in Ho Chi Minh City

|

HCMC - On the afternoon of September 16, authorities blocked off the scene of a car colliding with a motorbike on Truong Chinh Street, injuring 3 people.

Traffic jam on Nhat Tan bridge after installing iron fences to separate lanes

|

Hanoi - Motorbikes have difficulty moving at the installment of an iron fence to separate lanes on Nhat Tan Bridge.

turned over a tractor in Lam Dong, killing a man

|

Lam Dong - While going down a slope in a coffee garden, the tractor overturned, causing a man in Dinh Trang Thuong commune to die on the spot.

People talk about Ho Chi Minh City's proposal to arrange separate lanes for buses

|

HCMC - The HCMC Department of Construction has just proposed to arrange separate lanes, prioritize and standardize bus designs, attracting much attention from the people.

In 2025, Hanoi will reclaim land from nearly 700 households to open a 6-lane road

|

Hanoi - In 2025, Thanh Xuan district will focus on clearing land for nearly 700 households to build a 1.5km long road with an investment capital of more than 2,500 billion VND.

Voters complain about the quality of some sections of Ho Chi Minh Road

|

Voters in Quang Nam and Dak Lak provinces have just petitioned about the quality of some sections of Ho Chi Minh Road.

Another motorcycle accident with a tractor leaves 1 person dead

|

In the past 4 days in Binh Thuan, there have been 2 consecutive accidents between motorbikes and tractors on the road and both cases resulted in fatalities.

Phong Chau Bridge construction site before the start of new construction

|

Phu Tho - The sound of machinery resounds at the construction site before the start of construction of the new Phong Chau bridge (December 21).

Image of the large bridge on Ring Road 4 in the Capital region under construction

|

The 27-span railway overpass (part of package 8 - construction of the parallel road to Ring Road 4) has taken shape and is expected to be completed in April 2025.

Will study investment in Dak Lak - Dak Nong expressway in 2030

|

The Ministry of Transport said it will study investment in the Dak Lak - Dak Nong expressway in 2030.

Road Department provides documents to police on Phong Chau bridge case

|

Responding to voters recently, the Ministry of Transport said it had assigned the Roads Department to provide investigation documents to the police on the Phong Chau bridge collapse.

Spending 50 billion VND to renovate and upgrade mountain streets in Phu Tho

|

Phu Tho - Doan Hung District invested 50 billion VND in the project of Upgrading and renovating the inner-city road of Doan Hung town.

Ho Chi Minh City develops green transportation, aiming for carbon credits

|

Ho Chi Minh City is promoting the conversion of transportation to green energy, not only reducing pollution and improving the quality of life, but also exploiting the potential of carbon credits, bringing sustainable revenue to the city.

Request for quality control of Nha Trang - Cam Lam expressway before opening day

|

Khanh Hoa – The joint venture of contractors proposed to allow the Nha Trang - Cam Lam expressway to operate, the Ministry of Transport requested the investor to closely monitor the quality of the project.

People can ride free electric buses connecting to Metro Line 1

|

HCMC - On the morning of December 20, 17 electric bus routes connecting Metro Line 1 officially started running, serving people to experience the city's first tram line.

The Hundred Billion Road in Hanoi Stops Before the Finish Line

|

Hanoi - Land acquisition problems have caused the 250 billion VND road project to be under construction for 4 years without completion, affecting people's lives.

Current status of the road proposed to invest 1,750 billion to expand

|

HCMC - Phan Anh Street - the connecting road between Hoa Binh and Tan Hoa Dong streets - is proposed to invest 1,750 billion VND to expand to 30m.

After 2 years of buying a car, people are happy because they escaped emission inspection

|

Currently, information about the regulation that motorbikes with less than 5 years of use will not have to be inspected for emissions is receiving much attention.

Two students died while visiting a friend who died in an accident

|

Thai Nguyen - On the way to a funeral, two students had an accident, one died and one was injured.