Traffic
AI cameras "detect errors" 24/24, vehicles parked incorrectly in Hanoi have no way to avoid
|
Hanoi - AI cameras help traffic police detect vehicles stopping and parking in violation of regulations, thereby conducting remote fines.
Motorbike crashes into stray dog, collides with tractor-trailer, 2 people seriously injured
|
Lam Dong - A motorbike driven by a young man crashed into a stray dog, then collided with a tractor-trailer, seriously injuring 2 people.
Lam Dong agrees to let Khanh Hoa deploy Nha Trang - Da Lat expressway
|
Lam Dong - The Provincial People's Council agreed to let Khanh Hoa province be the agency to research and implement the Nha Trang - Da Lat expressway project with a total investment of more than 25,000 billion VND.
The 2nd runway of Long Thanh airport is expected to be completed before June 30
|
Dong Nai - Package 4. 12 construction of the 2nd runway at Long Thanh airport is expected to complete the entire item before June 30, 2026.
Cars banned from crossing Long Bien bridge, pressure pours on Chuong Duong bridge
|
Hanoi - The number of vehicles flocking to Chuong Duong bridge increased sharply after the traffic ban on Long Bien bridge.
Technology motorbike taxi drivers are ready to switch to electric vehicles if there is a support solution
|
To synchronously deploy and completely switch from gasoline vehicles to electric vehicles, whether in Ho Chi Minh City or other major cities, many more solutions are needed to support workers.
Heavy rain, truck overturns in the middle of the road in Ho Chi Minh City, people break the door to rescue a driver trapped
|
HCMC - On May 20, a truck overturned on Tran Van Giau Street, the driver was trapped inside the cabin, causing traffic congestion.
Hanoi Metro talks about fixing the leaked water incident on the Cat Linh - Ha Dong train
|
The problem of water regulation flowing caused passengers on the Cat Linh - Ha Dong train to wear umbrellas, many people were worried and hoped for a quick fix to ensure safety and convenience.
HCMC builds an intersection connecting the South with the Ben Luc - Long Thanh Expressway, with a total capital of 591 billion VND
|
HCMC - The Ben Luc - Long Thanh Expressway Intersection with National Highway 50 (Binh Chanh District) has a total capital of VND591 billion, expected to start construction at the end of 2025, and be completed in 2026.
Bridges to expand Hanoi's development space
|
Yesterday (May 19), Tu Lien Bridge was started. This is a project along with the Tran Hung Dao and Ngoc Hoi bridges projects that Hanoi started construction in 2025 with the goal of solving traffic problems and bringing many important economic development opportunities to Hanoi and neighboring areas.
170 electronic boards of Ho Chi Minh City bus waiting rooms damaged, affecting people
|
Ho Chi Minh City has 170 damaged electronic boards for bus waiting rooms, many places are occupied, painted with figures, littered... affecting people's experience.
Air conditioners flow, visitors on the Cat Linh - Ha Dong train must cover themselves
|
Hanoi - On the afternoon of May 19, some passengers on the Cat Linh - Ha Dong train had to use an umbrella to hide in the train car to avoid water from the air conditioning system flowing down to them.
The Metro line worth over2 billion USD through 6 districts of Ho Chi Minh City has a domestic investor proposing construction
|
HCMC - Metro Line 2 (Ben Thanh - Tham Luong) is more than 11km long, passing through 6 districts, expected to start construction at the end of 2025, with a domestic consortium proposed as a general contractor.
HCMC is about to build 5 more bridges in District 8, with a total capital of thousands of billions of VND
|
HCMC - Binh Tien Bridge and Road, Rach Cat Bridge and the three Canh Ngang bridges No. 1, 2, 3 are about to be built in District 8 to increase traffic connectivity and reduce congestion in the area.
Hot Saigon: 2,177 households in Ho Chi Minh City are about to give up land to build a 4-lane highway
|
Hot Saigon News on September 19: 3 secondary schools enroll students in grade 6 using a survey test to announce the impact ratio; 2,177 households are about to give up land to build a highway;...
The theory of driving test, if 1 question is incorrect, must also be retaken
|
If only 1 question is correct about handling serious traffic safety violations, the driving test theory test will not meet the requirements.
Nhon Trach Bridge finishes early, ready to open to traffic at the end of June
|
Ho Chi Minh City - Nhon Trach Bridge, a key project of the Ho Chi Minh City Ring Road 3 project, will open to traffic at the end of June, 3 months ahead of schedule.
Research on investment in the 14.6 km long coastal road project through Phan Thiet
|
Binh Thuan - The province is studying an investment plan for the coastal road project through Phan Thiet city and the Ca Ty River overpass.
Opening more than 40km of road from Binh Phuoc to Dong Nai connecting to Ho Chi Minh City Ring Road 4
|
Dong Nai - The road project from Ma Da bridge to the intersection with Ho Chi Minh City Ring Road 4 (phase 1) has a scale of 4 lanes, with a total investment of VND 11,020 billion.
Tractor trailer plunges into a ravine in Quang Binh
|
Quang Binh - A tractor-trailer fell into a deep ravine on National Highway 12A, passing through Dan Hoa commune, the driver was lucky to escape.