Traffic
Close-up of the bridge connecting 2 wards in Ho Chi Minh City gradually taking shape by the Doi canal
|
Ho Chi Minh City - After a period of implementation, Hiep An 2 bridge, belonging to the project to renovate the North bank of the Doi canal, is gradually taking shape, bringing expectations for a new face for the area.
Cases of security searches at airports
|
Spokespersons threatening flight security, ownerless luggage or cases with unusual signs can be searched for security at the airport.
Ho Chi Minh City gateway to Dong Nai is congested, traffic police guide alternative routes
|
On June 20, the Traffic Police Department of Ho Chi Minh City Police guided alternative routes to reduce congestion at the gateway to Dong Nai.
Land acquisition for Metro extension project from Ho Chi Minh City to Dong Nai and Long Thanh airport
|
Dong Nai - The project to extend the Ben Thanh - Suoi Tien Metro line to the City Administrative Center and Long Thanh airport is about to announce land acquisition.
Car collides with motorbike at intersection, 1 young man dies on the spot
|
Gia Lai - A collision between a car and a motorbike at the Ly Thai To - Thanh Nien intersection (Quy Nhon Nam ward) killed 1 young man on the spot and injured 1 person.
Piloting lane division, regulating speed on two expressways from August 15
|
During the month, on the two expressways of Hanoi - Hai Phong and Phap Van - Cau Gie, the authorities will pilot lane division and speed regulation.
Traffic light incident and quick coordination of Hanoi Traffic Police
|
Hanoi - Through the surveillance camera system, traffic police quickly detect and fix traffic light incidents.
Quang Ninh Police rescue truck driver trapped after traffic accident
|
Quang Ninh - At about 2:30 a.m. on August 14, at Km 98+800 on National Highway 18, through Tuan Chau Ward, a traffic accident occurred.
A car crashed into a house in Hue at night
|
HUE - The car suddenly crashed straight into a house on Bui Thi Xuan Street, and the injuries are currently unknown.
Scene of the car crash into a house in Hue
|
HUE - A car suddenly crashed into a house on Bui Thi Xuan Street, causing the front of the car to deform and damage a lot of the property of the house.
On the four-day September 2 holiday, Ho Chi Minh City bus stations mobilize maximum vehicles and human resources
|
HCMC - Bus stations in HCMC have developed a plan to serve passengers during the September 2 holiday, focusing on increasing the number of trips.
The resettlement area for the North-South high-speed railway project of Da Nang will start construction on August 19
|
Da Nang The City People's Committee has just approved an investment project of more than 76 billion VND, building a resettlement area to serve the North-South high-speed railway project through the city.
Technology drivers are happy with the proposal to participate in social insurance
|
According to the new proposal in the Draft Law on Digital Transformation, hundreds of thousands of technology motorbike taxi drivers across the country will have the opportunity to participate in social insurance.
HCMC temporarily suspends the traffic violation handling system from August 13 to 18
|
HCMC - The Traffic Police Department of HCMC Police said that it will temporarily suspend the Administrative Violation Handling System for many days to come.
Ha Tinh proposes to adjust the direction of the high-speed railway
|
Ha Tinh - The province has just proposed that the Ministry of Construction adjust the route of the North-South high-speed railway project through this locality due to overlapping of many large projects.
The billion-dollar expressway in Tuyen Quang races for progress ahead of schedule
|
The Tuyen Quang - Ha Giang expressway project aims to open to technical traffic on December 19, 2025, with only 4 months left to urgently construct the entire route.
Mobilizing total resources for 2 expressway projects in Lang Son
|
Lang Son - 2 key expressway projects in the province are required to complete 100% of site clearance before August 15, 2025.
Progress of the National Highway 14E upgrade project, Da Nang faces difficulties due to land clearance problems
|
Da Nang - The National Highway 14E renovation and upgrade project still has 154 households that have not been handed over and many technical infrastructure have not been relocated, affecting the construction progress.
Da Nang people suffer because the construction of the highway caused cracks in the walls, mud and dirt to flood into their houses
|
Da Nang - Many households in Phu Thuong village are living in fear when their walls are constantly cracked and mud from the Hoa Lien - Tuy Loan Expressway project.
Scene of the accident in Quang Tri that killed one person
|
Quang Tri - At the scene, an electric motorbike fell close to the roadside, about 20m from the truck, one person died on the spot.
