Traffic
AI cameras "detect errors" 24/24, vehicles parked incorrectly in Hanoi have no way to avoid
|
Hanoi - AI cameras help traffic police detect vehicles stopping and parking in violation of regulations, thereby conducting remote fines.
Motorbike crashes into stray dog, collides with tractor-trailer, 2 people seriously injured
|
Lam Dong - A motorbike driven by a young man crashed into a stray dog, then collided with a tractor-trailer, seriously injuring 2 people.
Lam Dong agrees to let Khanh Hoa deploy Nha Trang - Da Lat expressway
|
Lam Dong - The Provincial People's Council agreed to let Khanh Hoa province be the agency to research and implement the Nha Trang - Da Lat expressway project with a total investment of more than 25,000 billion VND.
The 2nd runway of Long Thanh airport is expected to be completed before June 30
|
Dong Nai - Package 4. 12 construction of the 2nd runway at Long Thanh airport is expected to complete the entire item before June 30, 2026.
Cars banned from crossing Long Bien bridge, pressure pours on Chuong Duong bridge
|
Hanoi - The number of vehicles flocking to Chuong Duong bridge increased sharply after the traffic ban on Long Bien bridge.
Speeding up the construction progress of the Cao Lanh - An Huu Expressway
|
Dong Thap - Chairman of the Provincial People's Committee (PPC) Tran Tri Quang requested to speed up the construction progress of the Cao Lanh - An Huu expressway.
HCMC to spend VND19400 billion to open a 60-meter strategic road connecting Long An
|
Ho Chi Minh City is about to invest in Vo Van Kiet Street extending from National Highway 1 to Long An province, with a length of about 14.6km, 60m wide, and a total investment of about VND 19,400 billion.
Traffic infrastructure opens the way for Ho Chi Minh City after the merger
|
The merger of Ho Chi Minh City with Binh Duong and Ba Ria - Vung Tau poses an urgent need for a modern inter-regional transportation system, with a series of key projects such as Ring Road 3, Ring Road 4, Metro Line 1 extension, coastal road... being and being invested in.
Hanoi will build 7 more bridges across the Red River
|
Hanoi - In addition to closing the belt roads, national highways in the center..., the city will invest in 7 large bridges across the Red River to reduce traffic congestion.
Driver overtakes red light filmed by locals, driver fined 19 million VND
|
Khanh Hoa - From the clip provided by the people, the traffic police force fined 19 million VND and deducted driving license points for car drivers who ran red lights on National Highway 1.
Can Tho speeds up treatment of flooding on many roads
|
Can Tho - Many roads in the center of Can Tho are being accelerated to contribute to ensuring urban aesthetics and solving flooding.
Proposal to run two trains to welcome guests when merging Quang Binh with Quang Tri
|
Vietnam Railway Corporation proposed to organize a pair of passenger trains between Dong Hoi (Quang Binh) - Dong Ha (Quang Tri) to facilitate the travel of officers and people after the merger of the province.
Cam Lo - La Son Expressway expected to expand in August 2025
|
HUE - Cam Lo - La Son Expressway is expected to be expanded at the end of August 2025 with a total investment of VND6,400 billion.
Proposal to arrange another North-South high-speed railway passenger station in Dong Nai province
|
Dong Nai - The North-South high-speed railway through the province is nearly 82km long, with 1 passenger terminal at Long Thanh airport and 1 cargo terminal in Trang Bom district.
The only provincial road leading to the village in Quang Tri is seriously degraded
|
Provincial Road 587 through Huc Commune, Huong Hoa District (Quang Tri) is seriously degraded, greatly affecting the lives and livelihoods of local people.
Workers urgently repair damaged roads in Duyen Hai before heavy rain
|
Tra Vinh - Workers urgently repair a road about 6.5km long with 240 damaged points regardless of rain, sun or Saturday, Sunday.
The extension period has expired, the road is dusty on sunny days, muddy on rainy days and has not been completed
|
Vinh Long - Many items in the project to upgrade and expand DH 22 road in Long Ho district are still not complete despite the expiration of the extension period.
Sprinting to complete a 1.2 km long road worth nearly 480 billion VND in Quang Ninh
|
Quang Ninh - The road connecting Vung Duc road, Cam Dong ward to Cam Son ward, Cam Pha city is 1.2km long, with a total investment of nearly 480 billion VND, to be completed before June 15, 2025.
Traffic collision between 2 motorbikes in Ho Chi Minh City, one person died on the spot
|
HCMC - The authorities are investigating the traffic collision between two motorbikes in Go Vap District that caused a young man to die on the spot.
Consider adjusting the planning of the Bien Hoa - Vung Tau railway line
|
Ba Ria - Vung Tau - The Bien Hoa - Vung Tau railway project is being proposed to adjust the final station and some sections of the route accordingly.