Traffic

8 PM News: The last site clearance bottleneck on Nguyen Tuan street is removed

|

Demolishing the last project to expand Nguyen Tuan street; Commune police in Khanh Hoa discover illegal soil and rock mining at night...

Saigon Hot News: Recovering 192.5ha of land to build metro connecting Ho Chi Minh City with Long Thanh airport

|

Hiep An 2 bridge gradually takes shape next to Doi canal; Proposal to develop social housing for rent to retain workers... are Saigon Hot News No. 20.6.

Hanoi is expected to start construction of 5 key metro lines on June 22

|

Hanoi - 5 key metro lines are expected to start construction simultaneously on June 22, creating momentum for the development of public and urban transport.

Close-up of the resettlement area serving the high-speed railway project through Hue

|

HUE - The first resettlement area in Hue City has completed infrastructure, ready to serve site clearance for the North-South high-speed railway project.

The reason airports are sometimes upgraded to security level 1, 2 or 3

|

Many passengers have heard about the application of increased security levels at the airport, but not everyone understands the meaning of these three levels.

Information clearance of two road expansion projects in Hoang Mai

|

Hanoi - It is expected that in May and June, Hoang Mai district will take turns to complete the site clearance to expand Tam Trinh and Linh Nam streets.

6 traffic diversion situations on the occasion of the 50th anniversary of the Liberation of the South

|

On the evening of April 16, the Traffic Police Department has just issued a plan to remotely divert traffic, resolving traffic congestion in Ho Chi Minh City and related localities.

1.4km of unfinished road, workers worry about more difficulties in the rainy season

|

Vinh Long - The about 1.4km long road connecting Long Ho town with Loc Hoa bridge is a nightmare for people, especially the workers.

Some buses in Ho Chi Minh City do not stop completely when picking up passengers, the risk of traffic accidents

|

Ho Chi Minh City - Some buses do not stop when they pick up passengers, urge passengers to get up and down the bus, potentially at risk of accidents for passengers and pedestrians.

Lao Cai Sports Center officers violate the frame alcohol content

|

Lao Cai - Violation of frame alcohol content, 1 officer of the Provincial Sports Training and Sports Competition Center was fined 35 million VND

Metro tunnel excavators - Hanoi Railway Station is about to advance through the residential area

|

Hanoi - Metro tunnel dug machine - Hanoi "speedy" station is moving in the S10 station area, preparing to enter the residential area.

The road connecting Nam Tu Liem - Ha Dong touches the finish line, is expected to open the car before 30.4

|

Hanoi - Project on construction of Le Quang Dao street has basically completed the main items, proposed to clear the whole route in April 2025.

Planning for sea encroachment to build Ly Son airport

|

Quang Ngai - The planning of the sea encroachment to create a new land fund, expand the space to invest in building Ly Son airport is necessary, because the area of ​​the island is not large and the population density is high.

Land acquisition nearly 110 households built overpasses, saved black spots in Hanoi

|

Hanoi - Nearly 110 households will be recovered with land and ground clearance to build overpasses at black congestion in Ha Dong and Thanh Tri districts.

The conversion car operates on Hanoi street, potentially dangerous traffic

|

Hanoi - UAZ, Jeep cars ... converted, carrying tourists operating on the streets, there are many risks of traffic safety.

The concrete bridge for more than 50 years is at risk of subsidence

|

Thanh Hoa - For many years, people in a ward in Thanh Hoa City have to go through a bridge with a hammock, seriously degraded and at risk of subsidence at any time.

The path for the visually impaired in Can Tho leads to the stump, electric pole

|

Can Tho - Instead of facilitating, making floating roads (for visually impaired people) led people to pedestrians on a towering tree on the sidewalk.

Applying for a license to relocate and cut nearly 100 trees to open the center of Hanoi wide 50m

|

Hanoi - Functional branches are applying for compassion and moving nearly 100 trees to implement the project of Ring Road 1 section of Hoang Cau - Voi Phuc.

Details of the parade and parade routes will pass on April 30

|

Ho Chi Minh City - Below is the expected roadmap for the parade and parade delegations that will move through on April 30, so that people can take the initiative in moving and monitoring.

Ho Chi Minh City announced a new traffic plan around Tan Son Nhat station

|

Ho Chi Minh City has officially announced the plan to organize the traffic organization connecting Tran Quoc Hoan - Cong Hoa, serving to connect to T3 station of Tan Son Nhat Airport.