Traffic
National Highway 279 is about to be completed after more than 6 years of construction
|
Lao Cai - After more than 6 years of implementation, National Highway 279 has completed most of the items, contractors are focusing on handling arising points to hand over soon.
Vinh Hao - Phan Thiet expressway trial run to collect tolls for the entire route, fixing technical errors
|
Lam Dong - The toll collection system on the Vinh Hao - Phan Thiet expressway is being tested, fixing errors arising before official toll collection.
Morning in the Mekong Delta February 5th: Plans to combat traffic jams on Dinh Khao ferry during Tet
|
Morning in the Mekong Delta 5/2: Plan to prevent traffic jams on Dinh Khao ferry during Tet; Verifying clip of a woman at a private kindergarten beating a child;...
8 PM News: Bus stations and train stations in Hanoi increase trips, maintain ticket prices to serve people during Tet
|
3 Military Regions of the Vietnam People's Army will have a military school; Passenger transport enters peak season to serve the Lunar New Year...
Narrow channel, reduced visibility, Hanoi waterway traffic police proactively protect transport routes
|
Hanoi - Thick fog, narrow channels due to construction sites make waterway traffic potentially risky, traffic police strengthen patrols and controls.
Hot in Saigon: 14 years without completing the expansion of the main road
|
Hot News Saigon November 30: 14 years have passed without completing the expansion of the Eastern arterial road; Forecast of rain developments in the South;...
Resolving traffic flow conflicts at the intersection of National Highway 1 and expressway access roads
|
Binh Thuan - The intersection of km1717 National Highway 1 with the Phan Thiet - Dau Giay Expressway is a point of conflict between traffic flows and traffic accidents often occur.
Hanoi reclaims 98,300m2 of land to open a 6-lane road, to be completed in 2027
|
Hanoi - It is expected that by March 2025, Hoang Mai district will complete the land clearance of about 98,300 square meters of land to expand Linh Nam road.
People are miserable because of the road degradation caused by trucks carrying dirt and rocks
|
Thanh Hoa - For many years, people in two communes have had to live with dust and degraded roads caused by trucks carrying dirt and rocks running day and night.
The provincial road surface cracked and sank, but after being repaired, it was damaged again
|
Quang Tri - The surface of provincial road DT.585C continuously cracks and sinks, and after being repaired, it becomes damaged again.
Combined with tourism, Thai Nguyen railway hopes to regain its position
|
After 4 years of being in a state of depression, transporting only goods, passenger trains combined with tourism and cultural promotion will soon restart on the Hanoi - Thai Nguyen route.
The Eastern arterial road of Ho Chi Minh City has not been expanded for 14 years and is not yet completed
|
HCMC - After 14 years of implementation, the project to expand Hanoi Highway and National Highway 1 - the main road of the eastern gateway of HCMC - is still not completed.
Hot in Saigon: Metro Line 2 faces a major turning point
|
Hot News Saigon November 29: More than 7,000 billion VND has been paid for compensation for Ring Road 3; After 14 years of waiting, Metro No. 2 in Ho Chi Minh City is facing a major turning point;...
There was a license plate that exceeded the 13 billion mark in the auction on November 29
|
License plate auction: At the end of the license plate auction on November 29, many beautiful license plates brought in high winning bids.
The nearly 315 billion VND embankment project in Can Tho has subsided before it was completed
|
Can Tho – The Cai Son canal embankment project, over 2.8 km long, started construction at the end of 2019, however, to date, this project remains unfinished and degraded.
Collision in front of port gate in Hai Phong, one person died
|
Hai Phong - Hai Phong City Traffic Safety Committee has just reported 3 consecutive accidents causing 3 casualties.
Close-up of the center operating more than 600 "magic eyes" in Hanoi
|
More than 600 traffic camera clusters and nearly 600 traffic light clusters are being operated by the Hanoi Traffic Police force.
Long-term, capital-intensive project in Hanoi to be completed in 2025
|
Hanoi - After many years of delay and an additional capital increase of nearly VND 1,290 billion, the Tam Trinh Road expansion project is expected to be completed by the end of 2025.
Overview of the urgent 600 billion project that is sluggish due to lack of land
|
Hoa Binh - The urgent project of Pheo - Che flood prevention dyke in the lower Da River with a total investment of nearly 600 billion VND is being slowly constructed due to lack of land.
7-seat car caught fire on highway in Ho Chi Minh City
|
HCMC - A 7-seat car was traveling on the HCMC - Long Thanh - Dau Giay highway (section through Thu Duc City) when it suddenly caught fire.