Traffic
Road damaged, high tide, Can Tho people struggle to move
|
Can Tho - The road is degraded, often flooded when high tides rise, making it difficult for people to travel and worried about water overflowing into gardens.
Car collides with a series of motorbikes stopping at a red light near Tan Binh industrial park
|
Ho Chi Minh City - A car suddenly collided with many motorbikes stopping at a red light on Truong Chinh street (Ho Chi Minh City), dragging vehicles under the vehicle, injuring some people.
Construction of road connecting commune center - industrial cluster - expressway in Phu Tho
|
Phu Tho - The 3km long road connecting Thanh Ba commune - Thanh Ba Industrial Cluster - Tuyen Quang - Phu Tho expressway will be officially deployed.
Rescue of 19 people in overturned sleeper bus in Dong Nai
|
Dong Nai - 19 people on a sleeper bus running the Ho Chi Minh City - Dak Lak route that overturned into a drainage ditch were rescued safely.
3 expressway projects in Dong Nai connecting Ho Chi Minh City have completed more than 90% of the site
|
On September 16, according to the Dong Nai City Land Fund Development Center, there are 3 expressway projects connecting Ho Chi Minh City that have completed over 90% of the site.
Accident on Mai Dich overpass, Hanoi Ring Road 3 congested for 6km
|
Hanoi - The accident between a car and a motorbike on the Mai Dich overpass left 1 person dead, traffic on Ring Road 3 was congested for many kilometers.
Dai Ngai 2 Bridge strives to open to traffic to welcome the April 30 grand ceremony
|
Soc Trang - Hundreds of workers and engineers are working hard day and night at the Dai Ngai 2 bridge construction site, determined to complete the key project on the occasion of the April 30 holiday.
The project to expand the gateway to Ho Chi Minh City is stuck with 146 premises in Binh Duong
|
HCMC - The project to expand Hanoi Highway and National Highway 1 (from Tram 2 intersection to Tan Van) has been unfinished for many years due to 146 land issues in Binh Duong province.
No need to take a ferry, people can go home faster thanks to Quang Da bridge
|
On the morning of March 27, the more than 1,400m long Quang Da bridge connecting Da Nang and Quang Nam was technically opened to traffic, meeting the expectations of the people.
Over 48 billion VND to upgrade 795m of road in the center of Can Tho City
|
Can Tho - The nearly 800m long road connecting Lo Mo Street to Tran Nam Phu Street (Ninh Kieu District) is being upgraded with a total investment of more than 48.5 billion VND.
Collision with truck, dump truck driver dies
|
Ha Tinh - The accident occurred on National Highway 1, avoiding Ky Anh town, killing the dump truck driver.
Accelerating the construction of bridges across rivers and roads on highways
|
Soc Trang - Most of the overpasses on the Chau Doc - Can Tho - Soc Trang expressway through Soc Trang province have met and exceeded the set schedule.
Traffic collision causes National Highway 20 through Lam Dong to be jammed
|
Lam Dong - After the collision, the truck overturned and blocked the road, causing Quoc 20 to be stuck, vehicles lined up waiting for a long time.
Over 450 billion VND to build 2 overpasses to reduce congestion in Can Tho
|
Can Tho - The investment in building overpasses at the two intersections aims to solve traffic congestion, meeting the requirements of modern and sustainable urban development.
29,000 billion VND expressway extends the dream of developing border areas
|
Lang Son - The Lang Son - Thai Nguyen expressway is expected to become a lever for economic development for the Northern "fence" area.
Continuously violating alcohol concentration exceeding the threshold in Hanoi
|
In recent days, Hanoi Traffic Police have stepped up handling of alcohol concentration violations, detecting many cases of high-level violations.
Investing 420 billion VND to build a road along Thi Tinh river in Binh Duong
|
Binh Duong - Ben Cat City People's Committee will build a road along Thi Tinh River with an investment capital of about 420 billion VND.
Land clearance problems, Mo Cay bridge project is about 40% behind schedule
|
Ben Tre - Due to land clearance problems, the construction volume of the Mo Cay bridge project has only reached about 18% of the contract value, about 40% behind schedule compared to the plan.
The messy scene at the rest stops of the expressway through Thanh Hoa
|
Thanh Hoa - Rest stops on the expressway (through this province) are temporarily invested, with small and somewhat shabby spaces.
Unfinished resettlement, bottleneck in the progress of Tuyen Quang expressway
|
The delay in relocating people to resettlement areas and site clearance is a bottleneck that needs to be removed to ensure the progress of the Tuyen Quang - Ha Giang expressway.
