Traffic

Investigating the case of a man setting fire to a motorbike in the middle of the road in Lam Dong

|

Lam Dong - Functional agencies are verifying and investigating to clarify the case of a man personally setting fire to a motorbike, causing the vehicle to burn to ashes, leaving only the frame.

Hanoi accelerates to eliminate flooding points, reducing worries about waterlogging in the rainy season

|

Hanoi completes many flood prevention items in the inner city area, renovates pumping stations and handles 16 flooding points before the peak rainy season of 2026.

Removing site obstacles, road costing more than 740 billion VND in Ninh Binh accelerates construction

|

Ninh Binh - The old central road project of Hai Hau district with a total investment of more than 740 billion VND is accelerating the construction progress after removing site clearance obstacles.

Hanoi conducts general review of items at risk of unsafety on 2 metro lines

|

Hanoi - After the plaster peeling incident at Van Khe station, the Department of Construction requested to review and inspect items at risk of unsafety on 2 metro lines.

Hanoi Highway 16 years not completed, Ho Chi Minh City sets land handover deadline

|

Ho Chi Minh City - Prolonged for 16 years due to site clearance problems, the Hanoi Highway expansion project has just been set a deadline by Ho Chi Minh City to complete compensation and hand over the remaining land.

Amidst the crowded traffic, Lang Son traffic police pave the way to save patients

|

Lang Son - The traffic police force promptly guided the car carrying the patient to overcome the crowded traffic flow and quickly reach the Provincial General Hospital for emergency treatment.

Car crashes into barrier on Nhat Tan bridge, suspected to be due to driver drowsiness

|

Hanoi - A car moving on Nhat Tan bridge lost control and crashed into a barrier separating the lane.

Series of large projects in Hue are directed to accelerate

|

HUE - Hue City leaders inspect and request to accelerate the progress of a series of key transportation, industrial, and tourism projects.

Xuyen A road "bends over" carrying trucks, dust covers residential areas

|

Quang Tri - After more than 10 years of use, Xuyen A road is seriously degraded, covered in dust, affecting people's lives and posing a risk of accidents.

Dust, peeling road surface, constant risk of accidents on Xuyen A road

|

Quang Tri - Xuyen A road connecting National Highway 1A with National Highway 12A is seriously degraded, causing dust, affecting life and posing a potential risk of traffic accidents.

Motorcycle crashes into container truck in Ho Chi Minh City, one person dies on the spot

|

Ho Chi Minh City - April 2nd, units under the Ho Chi Minh City Police are verifying and clarifying the case of a motorbike crashing into the rear of a container truck, killing 1 person on the spot.

2. 460 locations to install more AI cameras in Hanoi

|

Hanoi - In addition to the number of AI cameras currently being deployed, Hanoi City Police is about to install more cameras at 2,460 locations.

The access road to the bridge has not been built, people take temporary paths to bet on safety

|

Can Tho - Concrete bridge has been completed but access roads have not been built. Many households in Vi Tan ward (Can Tho city) have to walk on precarious temporary paths, with danger lurking.

Ho Chi Minh City and Dong Nai start construction of 2 metro lines connecting Long Thanh airport in 2026

|

Ho Chi Minh City and Dong Nai have just agreed to deploy two metro lines directly connecting Long Thanh airport, preparing to start construction in 2026.

778 billion VND underpass project in Hanoi entangled in "super-thin houses", unable to complete site clearance

|

Hanoi - Ring Road 2.5 underpass project has some works that have not been cleared, the Traffic Management Board requests investors and authorities to handle them thoroughly.

56 more electric buses operate in Hanoi

|

Hanoi - April 1st, Hanoi Transport Corporation officially put into operation 56 medium-sized electric buses on routes 15, 17 and 36.

The main reason why Hanoi does not have 5-star bus enterprises

|

Hanoi - Among the 11 bus transport units, no business has been rated 5 stars. The reason is said to be that the evaluation criteria do not reflect reality.

Vehicles practice driving in line, landing on the Tuyen Quang - Phu Tho expressway

|

Many driving practice cars moving every day on the Tuyen Quang - Phu Tho expressway make traffic participants worried about the risk of unsafety.

The Ba Trieu road expansion project in Hue has not yet started construction even though it has expired

|

HUE - The Ba Trieu road expansion project with a total investment of more than 541 billion VND has been overdue for nearly 1 month, but the contractor has not yet implemented it.

Driving teachers must have diplomas and pedagogical professional certificates

|

The Government regulates the standards and procedures for issuing certificates for driving practice teachers.