Traffic

Hundred billion dong bridge to relieve traffic jams in the southwest of Ho Chi Minh City reaches the finish line

|

HCMC - After a period of restart, Tan Ky - Tan Quy bridge (Binh Tan district) has completed the final stages, preparing to open to traffic tomorrow (January 21).

The road leading to Nguyen Trai intersection is crowded, motorbikes spill onto the sidewalk

|

Hanoi - Traffic jams persist on Nguyen Xien and Khuat Duy Tien streets towards Nguyen Trai intersection.

Revealing ways to save gas when driving during Tet

|

A representative of a car service facility in Hanoi has provided information on how to check and repair cars so they can operate well and save fuel during Tet.

New look of the road leading to the largest unit market in Can Tho

|

Can Tho - Facing the new, spacious appearance of the road leading to Tan An market, many traders expressed their excitement and expectations for a favorable Tet shopping season.

The trillion-dong overpass construction site in Hue is about to be completed

|

HUE - The overpass project across the Huong River and Nguyen Hoang Street with a total investment of nearly 2,300 billion VND is expected to open to traffic at the end of March 2025.

184 level crossings have funding to be repaired before 2025

|

The Government has just approved a list of 184 level crossings nationwide to receive funding for repairs.

Hanoi is about to open two 6-lane roads with a capital of over 1,200 billion

|

Hanoi - The Le Quang Dao extended road project and Thanh Oai economic axis road, with a capital of more than 1,200 billion VND, are in the "final stage", expected to be completed by the end of 2024.

Breaking rocks to open a hundred billion dong road in Tuyen Quang

|

Tuyen Quang - After 3 years of construction, the more than 4 km long Son Duong town bypass road still cannot be completed due to the hard rocky terrain.

Hanoi faces major obstacles in site clearance for Ring Road 4

|

Hanoi - Difficulties in applying regulations when determining land origin, price differences between departure and arrival... are hindering the progress of site clearance for the Ring Road 4 project.

Ho Chi Minh City rescues 2 most congested roads in the Northwest gateway

|

HCMC - Truong Chinh and Cong Hoa streets will be expanded and elevated roads will be built to reduce traffic congestion and open up the city's Northwest gateway.

People will be able to travel on Metro Line 1 for free for 30 days

|

Ho Chi Minh City plans to spend 33 billion VND to give people the opportunity to experience Metro Line 1 (Ben Thanh - Suoi Tien) and 17 connecting bus routes for free for 30 days.

Intersections with high potential for accidents in Hanoi

|

Hanoi - Vehicles going from Nguyen Tuan to Nguyen Trai street to go down Thanh Xuan tunnel are potentially dangerous.

2 traffic projects in Ba Ria - Vung Tau completed before April 30, 2025

|

Ba Ria - Vung Tau - Two key traffic projects in the province are required to complete technical traffic before April 30, 2025.

The road is being expanded to 40m, 6 lanes in Hanoi

|

Hanoi - The Tam Trinh road expansion project was restarted in August 2024 after many years of delay. Contractors are currently working on some sections where the ground has been cleared.

Hanoi reclaims more than 320,000m2 of land to build 40-60.5m wide roads

|

Hanoi - Dan Phuong District plans to reclaim about 326,000m2 of land to build the 5.8km long Tay Thang Long road, with a cross-section of 40-60.5m, with a capital of nearly 1,300 billion VND.

Removing the final “bottleneck” for the Central Highlands Connection project

|

This morning, November 4, the Tay Son district government (Binh Dinh) mobilized security forces to construct package XL01, the project to enhance traffic connectivity in the Central Highlands region, through the two communes of Tay Giang and Tay Thuan.

Ho Chi Minh City sets milestone for opening 13km of 4-lane elevated road in Thu Duc

|

HCMC – The 13km-long, 4-lane elevated road through Thu Duc City (part of Ho Chi Minh City's Ring Road 3) is targeted to open to traffic on January 30, 2026.

Ho Chi Minh City is about to open 2 key bridges connecting District 7 and Nha Be

|

HCMC - Rach Dia and Phuoc Long bridges connecting District 7 and Nha Be district, with a total investment of 1,260 billion VND, will open to traffic in December, helping to reduce traffic congestion in the South of HCMC.

Driver's licenses of 2 Dai Loc Phat concrete mixer truck drivers suspended

|

After the Lao Dong Newspaper's reflection, 2 Dai Loc Phat concrete mixer truck drivers were fined by District 12 Police (HCMC).

People take a 10km detour because Binh Quoi ferry stops operating

|

HCMC - For nearly 4 months, many people in Binh Thanh District and Thu Duc City have had to travel by a detour, more than 10km away, because the Binh Quoi ferry has temporarily stopped operating.