Traffic
Cars congested at the Phan Thiet - Dau Giay expressway exit due to technical errors at the toll station
|
Lam Dong - Technical incident at the Phan Thiet intersection toll station on the Phan Thiet - Dau Giay expressway caused prolonged traffic jams.
Hanoi general sanitation of transport infrastructure, urban embellishment before election day
|
Hanoi generally cleans traffic infrastructure, embellishes green trees, lighting and urban landscape to ensure aesthetics and safety to serve elections.
Technical opening of Hieu Liem bridge across the Dong Nai River on April 30th
|
Dong Nai - Hieu Liem Bridge across the Dong Nai River, the section of Tri An commune, is planned to be technically opened to traffic on April 30th.
Car collides with motorbike on National Highway 3, one person seriously injured
|
Thai Nguyen - An accident occurred between a motorbike and a car on National Highway 3, seriously injuring one person.
Improving people's travel experience
|
Over the past time, Hanoi has promoted the conversion of electric buses in the public passenger transport system. This is considered a "double arrow" when it both contributes to reducing environmental pollution and improving the service quality and travel experience of people.
HCMC considers postponing the time of limiting gasoline vehicles to the center until 2027
|
HCMC - Instead of implementing from 2026, HCMC plans to start limiting gasoline vehicles to the central area from 2027.
Rapid construction of Duy Phuoc bridge, Da Nang
|
After the historic flood at the end of October, the bridge abutment and access road to Duy Phuoc bridge (also known as Ba Ngan bridge) were swept away by water, paralyzing traffic, affecting people's lives.
HCMC opens new 60 m wide road, 12 lanes to rescue traffic jams in the East
|
Ho Chi Minh City will reclaim land from 139 households to build a 60 m wide Cat Lai - Phu Huu port inter-road, accommodating 12 lanes, helping to increase connectivity and reduce congestion in the East.
Investors respond to Van Phong-Nha Trang Expressway having to patch the road
|
Khanh Hoa - The investor had to patch the Van Phong - Nha Trang expressway surface due to damage caused by floods.
Dong Nai Traffic Police fined 2 ambulances for turning on lights even though they did not provide emergency care
|
Dong Nai - Road Traffic Police Team No. 2 issued a fine for 2 cases of ambulance drivers using priority signaling devices that were not in accordance with regulations.
Hanoi traffic at the end of the year is congested, the road is expanded
|
Traffic in Hanoi is entering its peak at the end of the year with the risk of increased congestion. Faced with this situation, many solutions are being implemented.
Khanh Le Pass connecting Nha Trang - Da Lat officially opens route
|
Khanh Hoa - The authorities allow people and vehicles with a load capacity of less than 5 tons, along with passenger cars with 16 seats or less, to travel through Khanh Le Pass.
The road to the resettlement area in Da Nang is as dilapidated as soy sauce after many years
|
Da Nang - The main road leading to the residential area of Le Son 1 Resettlement Area (Hoa Tien Commune) is full of potholes, becoming a dangerous "trap" for people passing by.
Night accident, one person died, two injured
|
Ha Tinh - Two motorbikes collided at night, killing one person and injuring two others.
Hot Saigon: The bridge connecting the South and East of Ho Chi Minh City has been suspended for 10 years
|
Hot Saigon on December 23: The bridge connecting the South and East of Ho Chi Minh City has been suspended for 10 years; Shipbuilding across the Saigon River is convenient after raising the clearance of Binh Phuoc 1 bridge...
The largest road in the Southeast will start construction in 2026 and be completed in 2028
|
HCMC - The Ring Road 4 project, the largest route in the Southeast region passing through HCMC, Dong Nai and Tay Ninh, will start construction in September 2026 and be completed in 2028.
Hanoi cuts sidewalks at a series of black spots of traffic jams, people hope to complete soon
|
Hanoi - Having to take a detour to avoid congestion, people expect the sidewalk section of Le Van Luong - Hoang Minh Giam - Nguyen Tuan streets to be completed soon.
HCMC today: From December 27, HCMC changes location for administrative dossier submission
|
Ho Chi Minh City stops receiving administrative records at departments and branches from December 27; Remove obstacles for granting pink books at the 132 Ben Van Don project...
11 more Tet trains from Ho Chi Minh City to the Central region, adding 5,500 tickets
|
HCMC - The railway will run 11 more trains in the Southern region, adding about 5,500 tickets, focusing on the routes Saigon - Da Nang, Nha Trang, Tam Ky.
Hanoi will limit trucks over 10 tons to the Peak 3-hour Ring Road
|
From January 1, 2026, Hanoi will pilot the limitation of trucks over 10 tons and container trucks traveling towards Ring Road 3 during rush hour.