Traffic

Tan Son Nhat Airport is bustling on the days leading up to Tet At Ty

|

HCMC - In the days leading up to Tet At Ty, at Tan Son Nhat airport, the number of passengers returning home has begun to increase.

The potholed road in Thu Duc City has become smooth again

|

HCMC - The project to upgrade and expand Nguyen Hoang Street was just opened to traffic right before Tet, contributing to creating convenience for people to travel with peace of mind.

Hot in Saigon: Traffic jam for kilometers due to road closure for racing

|

Hot News in Saigon on January 19: Traffic jam for kilometers due to road closure for racing; Multiple accidents between trains, cars and motorbikes in Binh Thuan;...

Handing over 100% of the project site of the belt connecting Ho Chi Minh City - Dong Nai

|

For the Ho Chi Minh City Ring Road 3 project, the section passing through Dong Nai province, Nhon Trach district has so far handed over 65 hectares, reaching 100% of the project area.

Thai Nguyen City bans vehicles on some roads during Tet

|

Prohibiting vehicles on some streets to serve people's shopping and trading needs during the Lunar New Year 2025.

Widening a chronically congested road in Hanoi to 21m

|

Hanoi - Lane 381 Nguyen Khang (Cau Giay District) is constantly congested, waiting for a project worth nearly 320 billion VND to rescue it.

Ho Chi Minh City is about to open a 5.8 km long, 40 m wide national highway in the South

|

Ho Chi Minh City is preparing to implement a project to open a new National Highway 50B through Binh Chanh and Nha Be districts, about 5.8 km long and 40 m wide, to strengthen connectivity with the Western provinces.

20h News: Revealing the cause of the bus accident in Dien Bien

|

20h News: Decomposing body found at An Phu karaoke; Bus accident leaves 1 dead, nearly 20 injured...

Riding a motorbike on the highway is "very dangerous, but still go in a hurry"

|

For many people, riding a motorbike or bicycle on the highway may make the journey home faster and shorter. However, this is no different from committing suicide...

Hot News in Saigon: Pham Van Dong Avenue is about to have a 4-level intersection

|

Hot News in Saigon on October 16: Pham Van Dong Avenue is about to have a 4-level intersection; Water outage schedule in Ho Chi Minh City from today until October 18;...

HCMC Center is tidier after 5 months of sidewalk charging

|

HCMC - The project to collect fees on part of the roadway and sidewalk has come into effect and has created positive changes to the city's appearance after more than 5 months of implementation.

Container truck collides with motorbike, killing 1 person in Ho Chi Minh City

|

HCMC - District 12 police are blocking off the scene of an accident between a container truck and a motorbike on National Highway 1A, leaving one person dead on the spot.

The highest BOT price for Phuoc An port road is nearly 9 million VND

|

Dong Nai - The BOT price for the project to build a road connecting to Phuoc An port is the lowest at 20,000 VND/trip and the highest at nearly 9 million VND/quarter.

Besides Phong Chau bridge, Phu Tho has many weak bridges

|

Phu Tho - Many bridges on provincial roads are old and weak but have not been repaired for many years, and still carry countless series of heavy-duty trucks every day.

4-level intersection to be built on Pham Van Dong Avenue in Thu Duc

|

HCMC - The Pham Van Dong intersection with Ring Road 2 in Thu Duc City will be designed with 4 floors, including an underpass and three overpasses.

Passenger bus hit the back of a tractor trailer, assistant bus driver had half of his arm severed

|

Binh Thuan - A sleeper bus crashed into the iron frame of a crane carrying a trailer behind a tractor-trailer on Highway 1, causing the bus assistant to have half of his arm severed.

Lao Cai warns of increasing traffic accidents

|

In the first 9 months of 2024, traffic accidents in Lao Cai increased in both the number of cases, deaths and injuries.

Thorough appraisal of North-South high-speed railway project

|

The North-South high-speed railway project is a particularly important transport infrastructure project, so the appraisal must be carried out very carefully.

Truck driver trapped in cabin after accident

|

Nghe An - People had to open the cabin to rescue the driver trapped inside and take him to the emergency room.

Proposal to invest 5,400 billion VND to build coastal road in Van Phong

|

Khanh Hoa - The transport sector has proposed building a coastal road in Van Phong Economic Zone, more than 23km long, with a capital of more than 5,400 billion VND.