Society
Weather today August 4th: Northern region has heavier rain from tomorrow afternoon
|
Weather today, August 4th, the North has showers and scattered thunderstorms, locally heavy to very heavy rain, from the afternoon there will be moderate rain, heavy rain and thunderstorms, locally very heavy rain.
Overloaded waste, Hung Yen accelerates treatment plant planning
|
Hung Yen - Hung Yen is accelerating planning and investing in centralized waste treatment plants to improve the capacity of domestic waste treatment.
Urgently search for 2 fishermen suspected of falling into the sea in Phu Quoc
|
An Giang - Functional forces and surrounding fishing boats are still actively coordinating to participate in the search for 2 fishermen suspected of falling into the sea in Phu Quoc.
Quang Ninh plans to terminate slaughterhouse operations that do not meet conditions
|
Quang Ninh - The Provincial People's Committee has just requested localities to review and complete the plan to terminate the operation of slaughterhouses that do not meet the conditions before October 31.
Voters reflect that the construction of the North-South expressway divides traffic and irrigation
|
The Ministry of Construction has issued a document responding to voters' reflections in Nghe An about the construction of the North-South expressway cutting off traffic and irrigation.
Officially opening Quang Da bridge connecting Quang Nam - Da Nang
|
The bridge connecting Quang Nam - Da Nang officially opened to traffic, shortening travel time and promoting trade between the two localities.
Nha Trang people are surprised by the drug processing factory
|
Khanh Hoa - Many people in Nha Trang City were extremely surprised to learn that there was a huge drug processing factory located on the edge of a cemetery.
Continuously violating alcohol concentration exceeding the threshold in Hanoi
|
In recent days, Hanoi Traffic Police have stepped up handling of alcohol concentration violations, detecting many cases of high-level violations.
Investing 420 billion VND to build a road along Thi Tinh river in Binh Duong
|
Binh Duong - Ben Cat City People's Committee will build a road along Thi Tinh River with an investment capital of about 420 billion VND.
Land clearance problems, Mo Cay bridge project is about 40% behind schedule
|
Ben Tre - Due to land clearance problems, the construction volume of the Mo Cay bridge project has only reached about 18% of the contract value, about 40% behind schedule compared to the plan.
slow construction, road project in Da Bac unfinished after nearly 3 years
|
After nearly 3 years of construction, the 400 billion VND road project in Da Bac district (Hoa Binh) is still unfinished and messy. This situation not only affects people's lives but also poses a potential risk to traffic safety.
Fine forestry company for arbitrarily leveling forest land in Thanh Hoa
|
After Lang Chanh Forestry Company (in Lang Chanh District, Thanh Hoa Province) arbitrarily leveled more than 1 hectare of forest land, the authorities proceeded to handle the violation according to regulations.
High-speed railway, an opportunity to master modern technology
|
Vietnam is facing an unprecedented wave of strong investment in large-scale high-speed railway projects. This is an opportunity for domestic enterprises to participate more deeply, gradually mastering modern technology and technical processes.
Border province collects 2,600 billion VND in budget for the first 3 months of the year
|
Lang Son - In the first 3 months of the year, the "bean sprout" province's economy has improved a lot with a budget revenue of VND 2,666 billion.
Ambulances carrying the crew of the movie Am Duong Lo are not licensed
|
HCMC - According to the City Department of Health, the ambulance carrying the film crew of Am Duong Lo is an unlicensed vehicle that has been administratively sanctioned. This vehicle registration company has been dissolved.
Cold air is about to cause rain in the North, some places below 13 degrees Celsius
|
According to the meteorological agency, cold air will cause rain and cooling down in the North from tomorrow night, March 28.
The messy scene at the rest stops of the expressway through Thanh Hoa
|
Thanh Hoa - Rest stops on the expressway (through this province) are temporarily invested, with small and somewhat shabby spaces.
Southern region continues to have hot weather, latest developments forecast
|
According to the meteorological agency, in the next 3 days, the South will continue to be hot and sunny with the highest temperature of about 35 - 36 degrees Celsius.
Vietnam Airlines adjusts flight times on March 27 and 28
|
Vietnam Airlines adjusted operations at Tan Son Nhat airport and Con Dao airport.
Racing for the progress of a park project worth over VND60 billion in Hai Phong
|
Hai Phong - The project to renovate and embellish Dam Vuong Park (Do Son District) has reached more than 70% of the progress, basically completed in April 2025.
