Society
The site clearance work for the Ring Road 1 project is in a key phase
|
The authorities are actively removing obstacles and creating consensus among the people to speed up the site clearance (GPMB) progress of the Ring Road 1 project, Hoang Cau - Voi Phuc section, contributing to improving the urban appearance of the capital.
Many parks in Hai Phong are under construction, exploitation is ineffective
|
When the Resolution to build a series of parks and flower gardens is passed, Hai Phong people expect a more spacious and green living environment. However, the program is slow to be implemented, many projects are unfinished, and have not met the expectations of the people.
Slow implementation of limitations on gasoline motorbikes, how to reduce pollution?
|
In recent years, Hanoi's air index has continuously exceeded the red threshold, the image of thousands of explosive vehicles jostling each street became a pain. In that picture, gasoline-powered motorbikes are still the largest source of emissions.
Stop trial operation at wood enterprise where a fatal accident occurred
|
Lao Cai - The authorities requested to stop the trial operation of Kiet Lam YB Company Limited to investigate the work accident that left 2 people injured and dead.
High tides submerge fields, farmers are left penniless
|
In the last days of October, high tides combined with prolonged heavy rains caused many rice, crops and fruit trees in many areas of the Mekong Delta to be flooded. Farmers have to pump and beat continuously, reinforcing the embankment but it is still difficult to avoid damage.
Authorities talk about the phenomenon of mud splashes that appeared after 46 years in Phu Yen
|
Phu Yen - The authorities have come to collect samples and assess the cause of the phenomenon of unusual mudflow from the ground to the agricultural land in Dong Xuan district.
Southern region continues to have hot weather, forecast for the next 2 days
|
According to the meteorological agency, in the next 2 days, the Northwest and the South will have mainly hot weather.
Latest accommodation allowance for leaders on business trips in 2025
|
The latest accommodation allowance for leaders on business trips is regulated in Circular No. 12/2025/TT-BTC.
The billion-dollar road is still quiet despite the policy of restarting
|
Hanoi - The billion-dollar road from Dam Hong to National Highway 1A (Ring Road 2.5) with a length of 2,061m is still quiet despite a plan to restart since March.
Thanh Hoa Police work through the afternoon to issue and renew driving licenses for people
|
After receiving the task of issuing and renewing driving licenses (GPLX), Thanh Hoa Police immediately started work without interruption.
Deputy Prime Minister requests urgent investigation into the house fire that killed 4 people in Tien Giang
|
Tien Giang - Deputy Prime Minister Nguyen Hoa Binh directed the investigation into the cause of the fire in Tien Giang.
Son La invests 56 billion VND to repair the main road connecting to Lai Chau
|
Son La province has invested more than 56 billion VND to renovate the provincial road connecting Quynh Nhai district and Tan Uyen district (Lai Chau province).
Body of missing young man found on Hieu River
|
Quang Tri - Rescue forces found the body of a young man missing on the Hieu River.
Lang Son explains the reason for almost being stripped of the SIPAS index
|
Lang Son - Only one province is above, this province is relegated to 62/63 in the 2024 Administrative Service satisfactory index (SIPAS) ranking.
Young girl found dead under irrigation dam in Lam Dong
|
Lam Dong - The authorities have just found the body of a young woman under Mai Thanh irrigation dam. The victim was confirmed to have died from suicide.
In June 2025, Ma Da bridge connecting Dong Nai - Binh Phuoc will start construction
|
Ma Da bridge connecting Dong Nai and Binh Phuoc is planned to start construction in June 2025. Dong Nai province assigned tasks to 8 key officials to implement the project.
Quang Tri urgently handles a series of abandoned public offices
|
Many projects worth billions of dong in Quang Tri have been abandoned for many years, causing waste, potential safety risks and making the public angry.
The site of the nearly 1,500 billion VND dam project in Quang Ngai is deserted
|
Quang Ngai - The Tra Khuc River downstream dam project is expected to be completed in 2021, but is still unfinished, the construction site is deserted.
Cage fish die abnormally, people worry about losing their livelihood
|
Quang Binh - The phenomenon of unusually dead fish in the Vung Chua sea area has caused many cage farming households to panic, suffer economic losses and worry about livelihoods.
Quang Binh handles unfinished works before organizational merger
|
Many construction works in Quang Binh are unfinished, the province requires reviewing and speeding up the progress to prepare for administrative merger.