Society
Da Nang transfers the last Asiatic black bear for rescue
|
Da Nang - Successfully mobilized the voluntary transfer of the last Asiatic black bear being kept in captivity in the area to the State for rescue according to regulations.
Border Guards stick to the people, stick to the area, and be on duty during Tet in the sea and islands
|
An Giang - Before, during and after the 2026 Lunar New Year, the unit needs to continue to focus on leading the synchronous implementation of Border Guard work measures.
Northern region is about to welcome strong cold air, forecast for the coldest rainy day
|
In the upcoming strong cold air wave, it is predicted that February 8th is the coldest day in the North.
Ho Chi Minh City today: The western gateway road is about to be expanded nearly 4 times
|
Ho Chi Minh City recovers land from 1,424 households to expand the western gateway road 4 times; Appoints and transfers many principals and vice principals in Ho Chi Minh City...
Weather forecast for tomorrow February 6th nationwide
|
Weather forecast for tomorrow 6/2, Hanoi morning with light rain, drizzle and scattered fog, cold weather. Ho Chi Minh City sunny day.
The North-South Expressway through Gia Lai overcomes the storm, rushes to the finish line on time
|
Gia Lai - Despite interruptions due to the impact of storms, the construction progress of the North-South expressway component projects through the province is still guaranteed, expected to be completed on time.
Strong cold air is about to affect, the North will have cold rain, some places below 8 degrees Celsius
|
Due to the impact of strong cold air, from November 17-18, the Northern region will have rain, showers and thunderstorms in some places; the weather will turn cold from the night of November 17.
Proposal to remove obstacles to electric vehicle charging stations to reduce traffic emissions
|
The development of electric vehicle charging station infrastructure is a key factor to promote green transportation to reduce emissions.
Explaining many people's confusion about Tran Nhat Duat and Long Bien bridges
|
Hanoi - Many people think that Tran Nhat Duat Bridge and Long Bien Bridge are one, but in reality they are not.
Hue operates to regulate two hydroelectric reservoirs to cope with heavy rain
|
HUE - Hue operates the regulation of Huong Dien and Binh Dien lakes to ensure the safety of dams and downstream during heavy rains.
Forecast of heavy to very heavy rain in provinces and cities throughout next week, dangerous weather
|
The meteorological agency continues to warn that heavy rains in the provinces from Ha Tinh to Khanh Hoa will last throughout next week; from November 22, heavy rain will tend to decrease.
Close-up of the 170 billion VND housing project for rotating officials in Ninh Binh
|
Ninh Binh - The Ninh Binh Province Guest House construction project, meeting 3-star standards, is being accelerated for use.
Many roads in Hue are flooded due to heavy rain, water flows like waterfall
|
HUE - Heavy rain caused many roads in A Luoi 3 commune to be flooded, water from the mountains poured down, creating a strong flow, endangering vehicles.
Unexpected landslide on National Highway 40B, Da Nang, motorbikes trapped in the mud
|
Da Nang - A section of National Highway 40B to Tra Nam - Tra Linh commune suddenly collapsed when it rained, rocks and soil flowed onto the road, many people managed to escape.
Assessing and appraising Ia Ko wind power project overlapping on mineral land in Gia Lai
|
Gia Lai - Wind power project overlaps on land in the national mineral reserve area of laterite iron ore Chu Se 2.
HCMC promotes investment in the largest road in the Southeast, to be completed in 2028
|
HCMC - The 207 km long Ring Road 4 project, with a total capital of more than VND 120,000 billion, passing through HCMC, Dong Nai and Tay Ninh, is being accelerated to start construction in 2026.
Hanoi public toilets are lacking, dirty and degraded
|
Hanoi - Many public toilets (NVSCC) are degraded and shabby. Some places are still surrounded by shops.
Strong cold air is about to impact, lowest temperature forecast for cold in the coming days
|
Around the afternoon and night of November 17, strong cold air will affect the Northeast region.
The 4km runway at Long Thanh airport will be basically completed before December 19
|
Dong Nai - The second runway at Long Thanh airport is 4 km long and 75 m wide, basically completing the cement concrete part before December 19.
Buon Don improves nutrition, improves physical fitness for children in ethnic minority areas
|
Dak Lak - The medical team of Buon Don commune has been making efforts to improve nutrition and improve physical fitness for children in ethnic minority areas.