Society

876m of road built for 11 years not completed, Quang Ngai provincial leaders direct removal

|

Quang Ngai - The Chu Van An road project section from Hai Ba Trung - Ngo Si Lien is 876m long, but after 11 years of implementation it has not been completed.

Lessons in creating consensus in urban development

|

After Lao Dong Newspaper published the article "Thank you sign appears at Ring Road 2.5 project in Hanoi", images with the words "Respectfully thank the people for handing over the site" quickly spread on social networks, many people expressed surprise at the response that was considered receptive and humane of the local government in the site clearance process of a project that had been stuck for many years.

Weather today June 21st: Northern and Central regions are experiencing intense heat, with places above 39 degrees Celsius

|

Today's weather June 21, the North and Central regions are hot, with intense heat in some places and especially intense with temperatures above 39 degrees Celsius.

Hai Phong diverts traffic to serve the construction of the Lam Khe bridge intersection underpass

|

Hai Phong - Hai Phong Department of Construction has just announced the traffic diversion to serve the construction of the Lam Khe underpass intersection tunnel.

10-day weather forecast from the night of June 20 to June 30 across the country

|

The National Center for Hydro-Meteorological Forecasting forecasts the weather for the next 10 days (from the night of June 20 to June 30) in regions across the country.

Quang Ngai - Hoai Nhon expressway just opened to traffic has temporarily stopped operating

|

Project Management Board 2 temporarily suspended the opening of the Quang Ngai - Hoai Nhon expressway before the Tet opening time due to some technical factors and unsafe operation.

Lien Khuong airport runway continuously peels off, proposal to close for major overhaul

|

Lam Dong - According to the operating unit, for many months, the runway surface of Lien Khuong airport has continuously peeled off and cracked locally, posing a potential safety risk.

Ho Chi Minh City today: Spending 1,100 billion VND to expand the Northwest gateway road 4 times

|

Ho Chi Minh City spends more than 1,100 billion VND to expand the Northwest gateway road 4 times; Staying up all night waiting for the Trade Union flight to take you home for Tet...

Ho Chi Minh City opens a sea-crossing delivery route Can Gio - Vung Tau by UAV

|

Ho Chi Minh City officially operates a sea-crossing delivery route using UAV connecting Can Gio - Vung Tau, shortening the time to 15 minutes/way, 6 times more optimal than roads.

People anxiously waiting to see the horse mascot in Can Tho

|

Can Tho - As horse mascots in other localities gradually reveal themselves, Can Tho people are also anxiously waiting to see the complete horse mascot on the Spring Flower Street.

People flock home, Mien Tay Bus Station in Ho Chi Minh City is crowded with people on the afternoon of the 25th of Tet

|

Ho Chi Minh City - In the afternoon of February 12th (ie, December 25th of the lunar calendar), the number of people flocking to Mien Tay Bus Station increased sharply, when the peak of returning home for Tet began.

Hanoi bus station is still deserted, no need for increased vehicles

|

Hanoi - On the 25th of Tet, bus stations such as Giap Bat, Nuoc Ngam... are not overloaded, the number of passengers has increased slightly, and fares are basically stable.

The reason a 17-year-old girl abandoned her newborn baby in a durian garden

|

Dak Lak - Functional agencies have determined the initial cause of the 17-year-old girl abandoning her newborn child in a durian garden.

Accelerate site clearance for the 4,600 billion VND dry port project in Bac Ninh

|

Bac Ninh - Site clearance for the dry port and logistics service project in Phong Khe is being accelerated.

Fire on the 16th floor of PH apartment building in Khanh Hoa, black smoke rises high

|

Khanh Hoa - Fire on the 16th floor of PH apartment building in Khanh Hoa caused black smoke to rise high, firefighters are urgently extinguishing the fire.

Ho Chi Minh City spends more than 1,100 billion VND to expand the Northwest gateway road 4 times

|

Ho Chi Minh City - Huong Lo 80B (section from Nguyen Anh Thu to Le Van Khuong) was spent more than 1,100 billion VND to expand from 7 - 8 m to 30 m, helping to reduce traffic jams at the Northwest gateway.

Entangled with site clearance, 600 billion VND road unfinished for 2 years

|

Ha Tinh - Due to site clearance issues, the road project connecting Hung Nghiep Formosa Steel and Iron Complex with National Highway 12C has not been able to connect and put into operation.

When Tet is moments of reunion together

|

After more than 1 month, Nestlé Vietnam's 2026 Tet campaign attracted more than 350,000 participants, spreading the message of cherishing the moment of reunion.

Drunkenness on the Dakrong River kills 2 children

|

Quang Tri - Dakrong River drowning incident killed 2 3rd grade children, Huong Hiep commune authorities visit and support families.

Collision of 2 motorbikes, 5-year-old child dies tragically under tractor-trailer wheels

|

Lam Dong - Grandparents carrying their grandchild on a motorbike collided with another motorbike, causing the grandchild to be thrown onto the road and run over by a tractor-trailer and die.