Traffic

A section of National Highway 1A through Vinh Long will be repaired in the third quarter of 2026

|

The Ministry of Construction has just responded to Vinh Long voters about the repair of National Highway 1A through Binh Minh Bus Station.

Heavy rain causes landslides in Son La, 1 person injured, National Highway 4G is partially congested

|

Son La - Heavy rain caused local flooding on the 4G National Highway section through Chieng Khuong commune, landslides injured 1 person.

At night, a refrigerated truck crashed into a wall and crashed into a house

|

Quang Tri - A refrigerated truck lost control and crashed into a house in Vinh Hoang commune, injuring one person.

HCMC changes lane division on Vo Chi Cong Street from today, September 13, drivers need to pay attention

|

HCMC - From today (September 13), traffic organization on Vo Chi Cong Street (from Phu My Bridge to My Thuy intersection, Cat Lai Ward) will be adjusted.

National Highway 13 expansion, expected to relieve pressure at the Northeast gateway of Ho Chi Minh City

|

HCMC - The project to upgrade National Highway 13 to 8 lanes, a 15km long section through the old Binh Duong province, is being accelerated in areas where the site has been handed over.

HCMC adjusts the route of operation of a series of bus routes

|

HCMC - A series of bus routes have adjusted their operating routes from today (March 26) to May 12, due to traffic adjustments to serve important events on April 30.

National Highway 91C is repaired with nearly 100 billion VND

|

Responding to voters in An Giang, the Ministry of Construction said that due to resource difficulties, National Highway 91C cannot be expanded. However, from 2023 to 2025, the Ministry will spend nearly 100 billion VND to repair it.

About to open 33km of expressway connecting Long An - Ho Chi Minh City - Dong Nai

|

HCMC - On the occasion of April 30, an additional 33km of the Ben Luc - Long Thanh expressway was put into operation, helping to increase connectivity between HCMC, Long An, Dong Nai, and shorten travel time.

Fake name when asked by traffic police to measure alcohol concentration in Ho Chi Minh City

|

HCMC - A man gave a fake name and refused to cooperate when the traffic police asked him to measure his alcohol concentration.

The road project connecting Dong Nai with the expressway to Ho Chi Minh City is stuck in land clearance

|

Dong Nai - The Huong Lo 2 - Section 1 project, nearly 2km long, to connect the Ho Chi Minh City - Long Thanh - Dau Giay expressway, is stuck with 250m of site clearance.

In Hanoi, anyone who travels can have their alcohol concentration checked

|

Hanoi - Traffic police are strengthening control and handling of alcohol concentration violations, especially at key routes and areas.

Thang Long high-speed train will resume operation of Ho Chi Minh City - Con Dao route

|

Ba Ria - Vung Tau - The Thang Long high-speed train operator with 1,017 seats is completing procedures to re-operate the Ho Chi Minh City - Con Dao route.

Students and parents raise awareness thanks to "Safe Traffic School Gate"

|

The model of "Safe school gates" helps reduce congestion, raising awareness of law compliance of students and parents at school gates in the capital.

Plugged into the rear of a truck in Hai Phong, a young man died

|

On March 26, information from the Traffic Safety Committee of Hai Phong City said that there had just been 2 accidents in the area, killing 1 person and injuring 2 others.

2 motorbikes collide head-on in Phan Thiet, 1 person dies

|

Binh Thuan - 2 motorbikes collided on the road in the center of Phan Thiet city, killing 1 person

Hanoi completes 2 more trillion-dong traffic projects in 2025

|

Hanoi - Two projects to build new and expand roads, with a total capital of more than VND1,500 billion, are being accelerated, expected to be completed in 2025.

Watch the billion-dollar Nguyen Hoang bridge in Hue before the opening ceremony

|

HUE - Nguyen Hoang Bridge across the Huong River will be opened to traffic on the morning of March 26 under the excitement of the people of Hue City.

Hopefully the project will be constructed quickly to escape the scene of climbing into houses

|

Binh Duong - Many households on Hanoi Highway have to climb stairs into their houses due to the impact during the construction of the Ho Chi Minh City Ring Road 3 project.

Car stuck on Thai Ha overpass again

|

Hanoi - A truck went onto the Thai Ha overpass (Dong Da district) and got stuck.

Foreign tourist passenger bus crashed in Da Nang

|

Da Nang - A traffic accident between a passenger bus and a truck carrying soil occurred this afternoon, causing the truck driver to get stuck in the cabin.