Traffic
Heavy rain, many streets in Da Nang are deeply flooded, vehicles stalled in large numbers
|
Da Nang - Heavy rain caused many roads in the city to be deeply flooded, authorities immediately put up ropes and warning signs to ensure the safety of the people.
Dump rain, many streets in Hanoi are congested from early morning
|
Hanoi - On the morning of November 3, prolonged drizzle caused many streets in the capital to be seriously congested.
Building Ben Thanh underground space, an opportunity for Ho Chi Minh City to have the first underground parking lot
|
HCMC - After more than 20 years of underground parking planning still on paper, the Ben Thanh underground space project is considered an opportunity for HCMC to have its first underground parking lot.
HCMC on November 2: The East of HCMC has a new traffic direction, reducing traffic congestion
|
New road in the East of Ho Chi Minh City opens more direction, reducing pressure on Vo Nguyen Giap traffic axis; A road in Ho Chi Minh City will be banned from circulation for many days to come
The truck driver who crossed the dump truck and did not give way on National Highway 20 was fined by Dong Nai Traffic Police
|
Dong Nai - Dong Nai traffic police fined the truck driver who crossed the dump truck because he was upset and refused to give way on National Highway 20, Gia Kiem commune section.
Interdisciplinary inspection, handling a series of UAZ vehicles violating traffic in Hanoi
|
Hanoi - The type of passenger transport used for tourism by UAZ (U-oat) and jeep is flourishing. However, there are still some drivers using this type of transport to violate traffic laws.
Water recedes to the finish line of the nearly 2,000 billion VND road in Soc Trang
|
Soc Trang - Hundreds of workers and engineers have worked day and night, determined to open the entire East-West economic development axis road to traffic by the end of April.
Land reclamation for a 40m wide road, capital of nearly VND2,600 billion in the center of Hanoi
|
Hanoi - Thanh Xuan District is implementing the recovery of 60,902.1m2 of land related to 687 households and 17 organizations to build Ring Road 2.5, with a capital of nearly VND 2,600 billion.
Workers work overtime to build a highway through Quang Binh
|
Quang Binh - Workers and laborers on the North-South Expressway through Quang Binh work overtime to prepare for the set progress.
Tan Son Nhat T3 Station officially opens its first flight
|
HCMC - On the morning of April 17, Tan Son Nhat T3 terminal marked an important milestone in successfully exploiting the first practical test flight.
Hanoi Traffic Police spent the night blocking and arresting a series of trucks violating traffic laws on the southern road
|
Hanoi - The southern axis of Hanoi has a high density of vehicles, especially heavy trucks. Many drivers take advantage of the late night to violate traffic laws.
Van Phong - Nha Trang Expressway is 83km long before opening to traffic
|
The Van Phong - Nha Trang Expressway, over 83 km long, is expected to open to traffic on April 19.
Many people are annoyed with the situation of intersection, blocking right lanes in Ho Chi Minh City
|
Ho Chi Minh City - Despite the signs, lines, many cars still blatantly block the right turn in Ho Chi Minh City, causing congestion and danger, pressing public opinion.
Dozens of electric power off the road in the middle of the road, people are heartbroken when moving
|
Vinh Long - a rural route in Mang Thit district has a series of electricity pillars, hindering traffic and potentially at risk of accidents.
Information clearance of two road expansion projects in Hoang Mai
|
Hanoi - It is expected that in May and June, Hoang Mai district will take turns to complete the site clearance to expand Tam Trinh and Linh Nam streets.
6 traffic diversion situations on the occasion of the 50th anniversary of the Liberation of the South
|
On the evening of April 16, the Traffic Police Department has just issued a plan to remotely divert traffic, resolving traffic congestion in Ho Chi Minh City and related localities.
1.4km of unfinished road, workers worry about more difficulties in the rainy season
|
Vinh Long - The about 1.4km long road connecting Long Ho town with Loc Hoa bridge is a nightmare for people, especially the workers.
Some buses in Ho Chi Minh City do not stop completely when picking up passengers, the risk of traffic accidents
|
Ho Chi Minh City - Some buses do not stop when they pick up passengers, urge passengers to get up and down the bus, potentially at risk of accidents for passengers and pedestrians.
Lao Cai Sports Center officers violate the frame alcohol content
|
Lao Cai - Violation of frame alcohol content, 1 officer of the Provincial Sports Training and Sports Competition Center was fined 35 million VND
Metro tunnel excavators - Hanoi Railway Station is about to advance through the residential area
|
Hanoi - Metro tunnel dug machine - Hanoi "speedy" station is moving in the S10 station area, preparing to enter the residential area.