Traffic

Nghe An urges site clearance for Vinh - Thanh Thuy expressway

|

Nghe An - Localities must hand over the entire site of the Vinh - Thanh Thuy expressway before September 30, 2026.

Trailer truck overturns, blocking Vinh Hao - Phan Thiet expressway, causing 2-way traffic jams

|

Lam Dong - Trailer truck overturns, blocking Vinh Hao - Phan Thiet expressway, causing traffic jams in both directions.

Ngoc Hoi bridge accelerates construction, bridge pillars have been revealed

|

Hanoi - Taking advantage of favorable weather, contractors are making efforts to accelerate the progress of the Ngoc Hoi bridge project across the Red River, connecting Hanoi with Hung Yen.

Overview of Ring Road 3 HCMC, more than 90 km long, passing through 3 localities about to reach the finish line

|

After three years of construction, Ring Road 3 of Ho Chi Minh City, more than 90 km long, is accelerating, many sections are being completed, aiming to open to traffic and complete the entire route in 2026.

Construction without warning signs threatens Da Nang residents amid heavy rain

|

Da Nang - Amidst heavy rain in Da Nang, the Tong Phuoc Pho road infrastructure project is under construction in a mess without warning signs, directly threatening people's safety.

Strengthening supervision, limiting vehicles circling in Hanoi

|

Hanoi - Functional agencies have strengthened inspection and supervision of vehicles after departure, minimizing the situation of vehicles circling around.

Hanoi informs about the progress of the National Highway 32 expansion project from Quang Oai to Son Tay

|

Hanoi - Voters proposed that the City accelerate the progress of investment in construction, upgrading and expanding National Highway 32 from Quang Oai to Son Tay.

Leaders of Quang Tri province urgently direct the upgrade of Tan Lien - Thuan road

|

Quang Tri - Provincial leaders request relevant units to urgently remove obstacles and ensure the completion of upgrading the Tan Lien - Thuan road in 2026.

Billion-VND traffic route in Southeast Hai Phong gradually revealed

|

Hai Phong - The investment project to build the road from Provincial Road 354 to National Highway 10 is accelerating progress, striving to reach the target in June 2026.

Hanoi informs about the progress of the extended To Huu road - National Highway 6 and Provincial Road 419

|

Hanoi - Voters proposed that the City People's Committee invest funds and direct the acceleration of the construction progress of traffic road projects in Chuong My ward.

Hanoi dismantles, relocates works, and hands over land for National Highway 6

|

Hanoi - National Highway 6, Ba La - Xuan Mai section, will have a cross-section extended to 50-60 m, and many bridges on the route will also be built.

More than 4,000 people violate alcohol concentration during the New Year holiday in Ho Chi Minh City

|

Ho Chi Minh City - During the 2026 New Year holiday, the traffic police force of Ho Chi Minh City handled more than 4,000 cases of alcohol and drug concentration violations.

Continuing the bridge span, Da Nang workers are out of the scene of blocking the river from the market

|

Da Nang - Duy Phuoc bridge has officially temporarily opened to motorbike traffic, shortening travel distance for thousands of workers before the New Year.

Multiple-vehicle accident on National Highway 47B causes 1 death

|

Thanh Hoa - An accident between a truck, a tractor-trailer and a car on National Highway 47B killed 1 person and injured 1 person.

Phu Quy Island temporarily runs out of gas due to rough seas

|

Lam Dong - Gas stations in Phu Quy Special Zone are temporarily out of gasoline due to rough seas, and transport ships cannot transport fuel from the mainland to the island.

Hanoi Ring Road 3 reduces prolonged congestion thanks to flexible traffic organization

|

Hanoi - On the last day of the New Year holiday, Ring Road 3 is "easier to breathe" for vehicles thanks to flexible traffic organization plans.

Series of traffic projects reaching the 2026 target

|

2026 begins with high expectations when a series of key transportation projects across the country enter the completion phase, preparing to be put into operation.

Sanctioning passenger car drivers going in the opposite direction, driving in emergency lanes on the highway

|

After reflecting on social networks, traffic police verified and fined the passenger car driver who went against traffic and drove into the emergency stop lane on the Noi Bai - Lao Cai highway.

Ho Chi Minh City installs 8 elevators at Metro Line 1 pedestrian bridges

|

Ho Chi Minh City installs 8 elevators at 7 pedestrian bridges connecting the elevated stations of Metro Line 1 (Ben Thanh - Suoi Tien), expected to be completed in mid-2026.

Many bottlenecks on the key tourist route in Tuyen Quang

|

Tuyen Quang - National Highway 4C, a vital traffic and tourism route leading to the Dong Van Karst Plateau, is revealing many bottlenecks that need to be overcome.