Traffic

Driver in Ninh Binh recounted the moment he escaped death and crawled out of a crumpled car

|

Ninh Binh - After a series of collisions with two trucks and a crushed car, the driver still crawled out of the car safely, surprising many witnesses.

20h News: Traffic lights in Hanoi upgraded with AI, temporarily stopped counting seconds

|

Reasons why traffic lights at many intersections in Hanoi are left behind for a few seconds; Reservoirs broken on mountains in Lam Dong are not built without permission, have not been technically assessed...

Hot Saigon: hotline for the start of construction of a 6.6 km elevated road in the South of Ho Chi Minh City

|

Hot Saigon on November 8: Determined the start date of the 6.6 km long elevated road in the South of Ho Chi Minh City; Forecast of the time when the rain will decrease, the tide will decrease rapidly in the South...

unsafe to clear landslides across coastal roads

|

After 5 days of landslides causing congestion on the Ha Tinh coastal road through Ky Xuan commune, the cleanup to open the route has not yet been implemented.

Progress of the billion-dollar expressway in Tuyen Quang before the opening date

|

Tuyen Quang - Contractors are implementing 3 shifts and 4 teams, aiming to complete the Tuyen Quang - Ha Giang expressway project on schedule.

Collision between motorbike and truck in HCMC, 1 person died

|

HCMC - An accident between a truck and a motorbike occurred at the intersection of Nguyen Thi Tu - Road No. 3, Vinh Loc residential area, Binh Tan district, causing one man to die.

Da Nang expands network, increases buses in remote areas

|

The expansion of bus routes in Da Nang aims to meet the essential travel needs of people in remote areas, helping them easily access public services.

17,800 billion VND highway through Dong Nai paved at the end of December

|

The representative of the joint venture contractor for package 21 (Lizen Joint Stock Company) said that it is expected that the Bien Hoa - Vung Tau expressway will be paved with asphalt by the end of December.

Groundbreaking ceremony for the 20,874 billion VND expressway through Binh Phuoc

|

The Ho Chi Minh City - Thu Dau Mot - Chon Thanh expressway project with an investment capital of about 20,874 billion VND has broken ground, first constructing the section through Binh Phuoc province.

Driving too fast just because he was in a hurry to cook and deliver goods

|

Hanoi - Some people say they are in a hurry to cook, deliver goods or have family matters to attend to when they are fined by the traffic police for speeding.

The scene of the car falling down the Dai Ninh pass cliff

|

Binh Thuan - A car plunged into a ravine at Dai Ninh Pass at a depth of about 25 meters. A rescue crane worked all night to lift the damaged car.

Ho Chi Minh City Traffic Police check passenger car dash cams to handle violations

|

HCMC – HCMC Traffic Police conducted dash cam checks on passenger vans, thereby discovering many violations by the van operators.

Appearance of arterial roads in Ho Chi Minh City after removing median strips

|

HCMC - After completing the removal of the tree-bed median strip in the two-wheeled lane, Vo Van Kiet Street's appearance has changed significantly, becoming more spacious and airy.

Hanoi clears nearly 400 houses to build 60-80m wide road

|

Hanoi - It is expected that nearly 400 houses in Ha Dong and Thanh Tri will be demolished to implement the 10km-long Ring Road 3.5 project, with an investment capital of more than VND8,500 billion.

Traffic collision amid heavy rain causes hours of congestion in Ho Chi Minh City

|

HCMC - On the evening of December 13, Phu Lam Traffic Police Team resolved the scene of a traffic collision between a truck and a 7-seat car that caused traffic congestion for many hours.

Drivers have to go around to another province because of traffic jam at An Khe pass

|

By the evening of December 13, the landslide and slippery road surface incident on National Highway 19 through An Khe Pass had been resolved and reopened to traffic, after many prolonged congestions.

Project worth over 7,200 billion in Can Tho will start construction before April 30, 2025

|

Can Tho - The project to upgrade and expand 7km of National Highway 91, section Km0 - Km7, with a total investment of more than 7,237 billion VND, will start construction before April 30, 2025.

Hot in Saigon: Current status of 7,500 billion VND project in Ho Chi Minh City suspended for 25 years

|

Hot News Saigon December 13: Current status of 7,500 billion project in HCMC suspended for 25 years; The largest intersection in HCMC is about to complete 2 important bridges;...

7-seat car plunged into Dai Ninh pass

|

Binh Thuan - A 7-seat car plunged into the abyss of Dai Ninh Pass (National Highway 28B) more than 20 meters below the road surface.

Still controversial, what to do to solve the problem of sidewalk rental?

|

Experts say that to effectively lease sidewalks, Hanoi needs a specific roadmap that does not affect or destroy the main function of pedestrians.