Society

Khanh Hoa assigns tasks to Chairman and Vice Chairman of the Provincial People's Committee

|

Khanh Hoa Provincial People's Committee has issued a Decision to assign specific work to the Chairman and Vice Chairmen of the Provincial People's Committee for the 2021-2026 term.

A woman in Quang Ngai fell off a bridge and was swept away by water and went missing

|

Quang Ngai - A woman was swept away by floodwaters while trying to cross a spillway in the middle of rising river water levels, despite warning signs of danger.

A specialist in Dien Bien receives nearly 1.5 billion VND when retiring early

|

Dien Bien - According to the published list, many cadres, civil servants and public employees received over billion VND when retiring early.

Police verify the incident of a motorbike taxi driver being beaten in heavy rain in Hanoi

|

Hanoi - A motorbike taxi driver was assaulted in the pouring rain. Currently, the authorities have stepped in to verify.

Heavy rain causes Trieu Khuc to be deeply flooded, people worry about pollution due to garbage and stagnant wastewater

|

Hanoi - On July 3, heavy rain caused Trieu Khuc Street to be flooded for many hours. Wastewater and garbage stagnate, causing concerns about pollution and affecting people's lives.

Improve the capacity of 4-wheel electric vehicles to avoid traffic jams

|

According to experts, in order for 4-wheel electric vehicles to become a means of connecting railway lines and bus routes, many more changes are needed.

Quang Ngai struggles to disburse public investment capital

|

Quang Ngai aims to achieve a disbursement rate of at least 80% of public investment capital by the end of this year, requiring investors to make efforts to remove obstacles to speed up progress.

Traffic accident on Highway 27 leaves 2 dead

|

Dak Lak - A serious traffic accident just occurred on National Highway 27, passing through Lak district, causing 2 deaths on the spot.

Good news about the project to open a 46-56m wide arterial road in Hanoi

|

Hanoi - It is expected that in 2024, Thanh Tri district will complete site clearance for the expansion of National Highway 1A after many years of delay.

Tay Ho: Road subsidence creates deep holes causing traffic safety problems

|

Hanoi - For many years, To Ngoc Van Street (Tay Ho) has had subsidence and deep holes, causing serious traffic insecurity.

Another scam call about emergency child appears in HCMC

|

Many parents in Ho Chi Minh City received scam calls informing them that their children were in emergency care at Cho Ray Hospital.

Cold air strengthens, the North is about to cool down more deeply

|

The meteorological agency predicts that from the night of November 19, cold air will have a stronger impact, causing temperatures in the North to drop.

Farmers sadly look at piles of dry firewood worth millions in Hai Phong

|

Hai Phong - Before Tet, many peach blossom gardens in Dang Cuong (An Duong, Hai Phong) withered. Farmers sadly saw peach branches worth millions of dong now turned into piles of dry firewood.

 

Typhoon No. 9 Man-yi causes waves up to 7m high, rough seas

|

The meteorological agency said that storm No. 9 Man-yi is at level 11, gusting to level 14, and is having a strong impact on the northern East Sea area.

Long An police recruit sister of fallen police lieutenant colonel

|

Long An - The sister of martyr Nguyen Xuan Hao - a police lieutenant colonel who died while pursuing drug dealers - has been recruited by Long An Police.

Hundred billion VND bridge in Thai Nguyen opens to traffic after 1 year of barriers

|

The 100 billion Hoa Son bridge across Cau River, connecting Thai Nguyen - Bac Giang, has opened to traffic after nearly a year of being blocked due to lack of access roads.

The main road in Yen Bai is about to be upgraded with more than 27 billion VND

|

Yen Bai - Provincial Road 170 has many potholes, affecting people's travel.

Investing 230 billion VND to build a rest stop on Van Phong - Nha Trang highway

|

Khanh Hoa - The investor is bidding to find an investor to implement the rest stop project on the Van Phong - Nha Trang highway with a total investment of more than 230 billion VND.

Current status of Thanh Xuan 220/110kV transformer station behind schedule

|

The Thanh Xuan 220/110kV Transformer Station construction project is scheduled to receive full site clearance in December 2022, but to date the project area is still in disarray.

Woman swept away to death while swimming in the sea

|

Quang Binh - A woman in Son La was swept away and died while bathing at Nhat Le beach.