Society
Intense heat, machinery still operating at full capacity at Ring Road 2.5 construction site
|
Hanoi - Intense heat but Ring Road 2.5 construction site still maintains continuous construction, with many machinery and equipment operating at full capacity.
Car catches fire while passing through straw drying area
|
Nghe An - When passing through an area with a lot of straw being dried on the roadside, a car suddenly caught fire in the front of the car.
Forecast of the highest temperatures in provinces and cities and the time to end intense heat
|
The hottest area is forecast to be from Thanh Hoa to Da Nang city and eastern Quang Ngai province, with some places above 40 degrees Celsius.
Ha Tinh accelerates site clearance for 2 trillion-dong projects
|
Ha Tinh - Slow site clearance, the government has mobilized hundreds of people to help people move property and demolish works to overcome this inadequacy.
Recovering nearly 67ha of land to build schools and open new roads in Viet Hung
|
Hanoi - The city plans to recover 66.889ha of land to open a new road, build schools, transformer stations... in Viet Hung ward.
Hanoi directs traffic to speed up construction to prevent inner-city flooding
|
Hanoi adjusts traffic diversion on many central streets to speed up the progress of drainage and flood prevention projects in the inner city before the rainy season.
Forecast of the start of this year's storm season and the risk of a strong storm
|
According to meteorologists, the forecast for this year's storm season starts at a level close to the multi-year average, which is around June.
The 137 billion VND bridge project in Can Tho is still unfinished after many years of construction
|
Can Tho - The Kenh Ngang bridge project with an investment of more than 137 billion VND has been implemented for many years but has not been completed, currently only about 25% of the volume.
Bien Hoa - Vung Tau expressway opens Long Thanh intersection, temporary operation from May 24th
|
Dong Nai opens Long Thanh intersection on the Bien Hoa - Vung Tau expressway, put into temporary operation from May 24.
Northern region is about to enter a peak hot day, forecast to end
|
According to the meteorological agency, hot weather in the North is forecast to last until May 27 and the hottest period in this period is from May 24-27.
Southern region forecast to enter a 4-day prolonged heat wave
|
According to the Southern Regional Hydrometeorological Station, Ho Chi Minh City and the Southeast region still maintain widespread hot weather.
Forecast of the possibility of storms, low pressures and widespread heavy rain in the next month
|
Forecast for the next month, there is a possibility of low pressure or storms at an average level of many years in the same period.
Businesses paying social insurance contributions below regulations will directly affect pensions
|
According to Vietnam Social Security, there is currently a situation where businesses pay social insurance below regulations, directly affecting the pension level later.
Three children in Quang Ngai die from drowning
|
Quang Ngai - Inviting each other to the Tra Khuc River to swim, three children died from drowning. Their bodies have been found.
Propaganda sessions that silenced cargo truck drivers
|
Hanoi - Hundreds of drivers and representatives of transport businesses watched real accident clips and signed commitments to comply with the law to prevent traffic risks.
The arduous journey across the river to go to school of island commune students in Hanoi
|
Hanoi - For many years, high school students in Minh Chau commune have had to take boats and cross rivers to school because the locality does not have a high school, posing many dangers.
Increasing fines, increasing inspections reduces railway safety violations
|
After a period of functional forces strengthening inspection and handling, the situation of railway traffic safety violations has had positive changes.
Long Bien Bridge reopens to traffic from May 27th after nearly 2 months of repairs
|
Hanoi - After nearly 2 months of temporary suspension of operation for repair, Long Bien bridge has completed over 90% of the workload and is expected to reopen to traffic from May 27.
Railway cameras detect 181 violations, fined more than 617 million VND
|
The camera surveillance system at level crossings and railway passages has detected 181 violations, and fined more than 617.5 million VND.
Elderly people need to pay special attention to these things when prolonged intense heat
|
Hot weather and rising temperatures will significantly affect the health of many people, especially the elderly.