Society
Decomposing body discovered in the median strip of Nguyen Xien Street
|
Hanoi - Authorities are verifying the identity of the body in the process of decomposing in the median strip of Nguyen Xien Street.
Disturbing order when reclaiming bauxite mining land in Lam Dong, 1 subject sentenced to 2 years in prison
|
Lam Dong - Phan Trong Cuong was sentenced to 2 years in prison for disturbing and obstructing authorities to reclaim land at the Lam Dong Bauxite - aluminum Project.
9th grade male student sang in the Da River
|
Phu Tho - A 9th grade male student living in Hoa Binh ward died from drowning while swimming in the river with a group of friends.
People set up barriers to prevent water from flooding into their homes after heavy rain in Ho Chi Minh City
|
HCMC - On the evening of September 18, a heavy rain lasting for hours caused many roads in HCMC to be deeply flooded over a wide area.
Fine Ngoc Linh ginseng processing enterprise in Da Nang for discharging waste exceeding standards
|
Da Nang fined 85 million VND to a business specializing in processing Ngoc Linh ginseng for violating the environment.
Tan Son Nhat T3 Station officially opens its first flight
|
HCMC - On the morning of April 17, Tan Son Nhat T3 terminal marked an important milestone in successfully exploiting the first practical test flight.
Hanoi Traffic Police spent the night blocking and arresting a series of trucks violating traffic laws on the southern road
|
Hanoi - The southern axis of Hanoi has a high density of vehicles, especially heavy trucks. Many drivers take advantage of the late night to violate traffic laws.
Van Phong - Nha Trang Expressway is 83km long before opening to traffic
|
The Van Phong - Nha Trang Expressway, over 83 km long, is expected to open to traffic on April 19.
On the large reservoir construction site worth over VND500 billion in the far West of the country
|
Dien Bien - After more than a year of construction, the reservoir project worth more than 500 billion VND in Muong Nhe district - the far western part of the country has completed about 30% of the volume.
Scanning gold bandits in Vinh O after Lao Dong Newspaper's reflection
|
Quang Tri - After Lao Dong Newspaper's reflection on the situation of gold bandits operating in Vinh O, the police and forest protection forces have stepped in to search.
Driving on the wrong route, Hanoi - Ha Tinh bus driver still violates alcohol concentration
|
Hanoi - Traffic police discovered a passenger bus traveling on the wrong route, so they stopped the bus for inspection. The driver was later found to have violated alcohol concentration.
Winning the lawsuit, the owner of the torn lottery ticket won a prize of 2 billion VND waiting for the day to pay the prize
|
Quang Nam - Despite winning the lawsuit against Hue Lottery Company, the owner of the torn ticket that won the prize of 2 billion VND has not yet received the prize, because the verdict is not yet valid.
Many people are annoyed with the situation of intersection, blocking right lanes in Ho Chi Minh City
|
Ho Chi Minh City - Despite the signs, lines, many cars still blatantly block the right turn in Ho Chi Minh City, causing congestion and danger, pressing public opinion.
Weather today, September 17: The North is rapidly heating up, some places above 35 degrees Celsius
|
The weather today 17.4, the North is sunny, some places are hot over 35 degrees Celsius. The South has hot places over 36 degrees C.
The appearance of 226 billion dong connected to the largest irrigation lake in Bac Kan
|
Bac Kan - After nearly 2 years of implementation, the hundred billion dong road project connecting the city to Lake Lake has gradually revealed, expected to be completed in 2025.
Dozens of electric power off the road in the middle of the road, people are heartbroken when moving
|
Vinh Long - a rural route in Mang Thit district has a series of electricity pillars, hindering traffic and potentially at risk of accidents.
By the end of June, the National Highway 91 expansion project must disburse all VND 3,235 billion
|
Can Tho - To ensure progress and quality, by the end of June 2025, the project to upgrade and expand National Highway 91 must disburse all the capital allocated in 2025.
New function function of the commune government after the merger
|
Decision No. 759 of the Government stipulates the new functions and duties of the commune -level government after the merger.
Information clearance of two road expansion projects in Hoang Mai
|
Hanoi - It is expected that in May and June, Hoang Mai district will take turns to complete the site clearance to expand Tam Trinh and Linh Nam streets.
Kien Giang identifies 37 important areas of Phu Quoc City
|
Kien Giang - The Provincial People's Committee has identified 37 areas of important significance in Phu Quoc City.