Society

Fire haunting student dormitories in Son La

|

Son La - Not equipped with fire extinguishers, cooking in rooms, degraded power systems, many student dormitories are at high risk of fire.

Road degradation, Can Tho residents cover 2-3 layers of fabric to prevent dust

|

Can Tho - The deterioration of the road is not only dangerous but also disrupts the lives of households on both sides of the road.

The hundred-billion-dong road in Quang Tri is about to be completed, there is a choice not to go through the BOT station

|

Quang Tri - When Hung Vuong Street connects the East-West Economic Corridor and the Southeast Quang Tri Economic Zone, people have the choice not to go through the road with a BOT toll station.

Morning in the West 16.9: Can Tho welcomes a super project worth over 19 billion USD

|

Morning in the West 16.9: Can Tho welcomes a super project of industrial and ecological energy worth over 19 billion USD; Risk of losing a billion-dollar fish pond due to landslides on the Mang River dike;...

Weather today, September 16: Southern region has thunderstorms, some places have heavy rain from this afternoon

|

Weather today, September 16, the North has scattered showers and thunderstorms in the morning, with some places having heavy rain. In the South, there will be heavy rain in some places in the afternoon and at night.

Quang Ngai after the merger, GRDP growth will reach 11.51%

|

The gross regional domestic product (GRDP) of Quang Ngai is estimated to reach nearly 42,000 billion VND, up 11.51% over the same period last year.

Considering supporting VND19,680 billion for Vinh Long to invest in traffic works

|

The Deputy Prime Minister requested to review and balance investment support capital of about VND19,680 billion to invest in traffic works from the central budget for Vinh Long province.

Husband goes to work far away, is stunned when he hears the news of his wife and children dying at home due to landslides

|

Lao Cai - While the mother and child in Xuan Ai commune were sleeping, the hill behind the house collapsed, mud collapsed, killing the two victims.

Lam Dong arranges 9 more resettlement areas to serve the high-speed railway project

|

Lam Dong - The North-South high-speed railway project through the province needs to clear more than 930 hectares of land, and is urgently completing resettlement procedures to start construction.

Renovating drainage, overcoming flooding on "2 Fate" road in Can Tho

|

Can Tho - Tam Vu Street (Tan An Ward) will have its drainage system renovated and the existing road surface will be re-paved.

Due to land clearance problems, Can Tho's public investment disbursement has only reached more than 26%

|

Can Tho - The leaders of the People's Committee of Can Tho City requested to review and speed up the disbursement of public investment capital, especially for projects with land clearance problems.

Unfinished construction road, people suffer in the midst of dust and mud

|

Da Nang - Nam Cao Road has been delayed for many years, causing people to suffer from dust, mud, environmental pollution and traffic insecurity.

Meals to enjoy at the Can Tho - Ca Mau expressway construction site

|

Can Tho - At the Can Tho - Ca Mau expressway construction site, some workers have started their lunch break, while others continue their asphalt paving work.

Forecast of when the South will have thunderstorms, some places over 60mm

|

According to the meteorological agency, thunderstorms in the South will be concentrated in the afternoon and night.

On the first day of having a transport vehicle, civil servants and public employees of Vinh Long have more motivation

|

Vinh Long organized a procession of more than 400 civil servants and public employees from Tra Vinh and Ben Tre (old) to help stabilize the organization, creating a sense of security after the merger.

Hanoi continues to have heavy rain, warning of flooding risk in the afternoon and evening

|

According to the meteorological agency, due to heavy rain, some streets in Hanoi are likely to be flooded deeper with a depth of 20 - 40cm.

Cases of termination of unemployment benefits from January 1, 2026

|

Cases of termination of unemployment benefits from January 1, 2026 are stipulated in Article 41 of the 2025 Law on Employment.

Warning of flash floods and landslides reaching level 1 in Thai Nguyen

|

Thai Nguyen - On July 14, the National Center for Hydro-Meteorological Forecasting issued a warning of flash floods, landslides, and subsidence due to heavy rain and floods in Thai Nguyen.

Adding a car ban sign to the Van Ninh - Cam Lo expressway under construction

|

Quang Tri - Signs prohibiting and blocking entrances and exits to the Van Ninh - Cam Lo expressway to ensure traffic safety for people, vehicles and construction units.

Gia Lai speeds up the construction of resettlement areas, preparing land for the high-speed railway project

|

Gia Lai plans to invest about VND1,400 billion to build 39 resettlement areas and 6 burial areas to serve the North-South high-speed railway project.