Traffic

Khanh Hoa repairs damaged traffic infrastructure after floods

|

Khanh Hoa - Functional agencies are urgently deploying repairs and overcoming damaged traffic infrastructure due to the floods at the end of 2025.

Truck crashes into trailer parked on the side of National Highway 1A, one person dies

|

Quang Ngai - A traffic accident occurred on National Highway 1A when a truck crashed into the back of a tractor-trailer parked on the side of the road, killing one person.

Images of the most overloaded road in Ho Chi Minh City waiting for expansion

|

Nguyen Tat Thanh Street is one of the most congested roads in Ho Chi Minh City, about to expand to at least 8 lanes, associated with the renovation of Nha Rong - Khanh Hoi area.

Current status of the bridge more than 3 decades old in Hue before the new construction

|

HUE - Many items of Thanh Ha bridge are in serious deterioration after more than 30 years of operation, posing a potential safety risk.

Quy Nhon - Pleiku expressway, land origin must be accurate

|

Gia Lai - The determination of land origin needs to be transparent and accurate to facilitate the implementation of the Quy Nhon - Pleiku expressway project.

Long Thanh airport has a separate transformer station with a capacity of 80MVA, ready to supply power to the super project

|

Dong Nai - Dong Nai Power Company has successfully energized the plant installation of 2 110kV transformer stations at Long Thanh airport, increasing the total capacity to 80MVA.

Reasons why Hanoi and Ho Chi Minh City plan to control motorbike emissions from July 1, 2027

|

The Deputy Director of the Department of Environment informed about the implementation of emission inspection for motorbikes and mopeds.

Efforts to restore key traffic routes after floods in Gia Lai

|

Gia Lai - After a long period of floods in recent days, many traffic routes in Gia Lai province have been severely damaged.

Opening one side of Prenn Pass - the gateway to Da Lat after nearly 10 days of paralysis due to landslides

|

Da Lat - After a period of repair, Prenn Pass - the gateway to Da Lat has officially opened to one-way traffic, creating favorable conditions for people and tourists to travel.

The main traffic route connecting Ho Chi Minh City with Dong Nai is about to open to technical traffic

|

Dong Nai - The Ho Chi Minh City Ring Road 3 project through Dong Nai, over 11 km long, will be basically completed in 2025.

Image of the Saigon River overpass connecting Ho Chi Minh City with Tay Ninh that has just been completed

|

Ho Chi Minh City - The 600 m Saigon River overpass has been completed, connecting Ho Chi Minh City with Tay Ninh province.

The temporary road to avoid landslides on Mimosa Pass is about to open to traffic, relieving congestion to Da Lat

|

Da Lat - The temporary bypass road on Mimosa Pass is under construction with a scale of 2 lanes and is expected to open to traffic on November 28.

Road traffic accidents decreased by over 23%

|

Information from the National Traffic Safety Committee said that traffic accidents continue to decrease sharply, especially on roads and railways.

Morning news 11/25: Expected time to ban motorbikes running on gasoline in Ring Road 3

|

Morning news 11/25: After Ring Road 1, Hanoi plans to ban motorbikes running on gasoline in Ring Road 3; Khuong Duy won the gold medal at the Asian Youth Chess Championship...

The residential road was severely damaged by the construction of a highway project

|

Quang Tri - The residential road in Hieu Giang commune was severely damaged after a long period of heavy loads carrying highway construction, causing people's lives to suffer.

Lam Dong invites experts to assess a crack hundreds of meters long on Trang Bang hill

|

Lam Dong - Local authorities invited experts from Hanoi to survey and assess the cracks hundreds of meters long in D'ran commune to propose solutions.

Hanoi informs about the plan to build an extended Vo Thi Sau road

|

Hanoi - Bach Mai Ward People's Committee is coordinating with the Department of Finance to implement the Vo Thi Sau extended road project according to the investment policy decision process.

Chairman of Ho Chi Minh City People's Committee is authorized to speed up metro projects

|

HCMC - The Chairman of the City People's Committee is given special authority to speed up progress and complete metro projects by 2035.

Hot Saigon: The area that caused the Ho Chi Minh City Secretary to be congested for 2 hours has become more open

|

Hot Saigon News on November 24: The area that caused the Ho Chi Minh City Secretary to be congested for 2 hours has now become more open; Ho Chi Minh City residents send their love to the Central region...

HCMC on November 24: A VND17,000 billion project is stuck in land clearance, HCMC establishes a working group to handle it

|

Ho Chi Minh City discovers a warehouse containing a large quantity of helmets of unknown origin; The VND17,000 billion project is stuck, Ho Chi Minh City establishes a working group to handle it thoroughly.