Society

Hanoi adjusts traffic on Thang Long Avenue to construct metro line No. 5

|

Hanoi reorganizes traffic on Thang Long Avenue to serve the construction of metro line No. 5 for 1 year.

Metro Line 1 is being demanded by Japanese contractors for more than 324 million USD in incurred costs

|

Ho Chi Minh City - Metro No. 1 (Ben Thanh - Suoi Tien) is facing many complaints from Japanese contractors with a total arising value of more than 324 million USD (more than 8,474 billion VND).

Hanoi urgently builds parking lot in the central area

|

Hanoi lacks serious parking lots in the central area. The Department of Construction proposes urgent investment in parking lots in Ba Dinh, Hoan Kiem and Cua Nam.

Breathtaking rescue of victim in concrete truck overturned into pond in Bac Ninh

|

Bac Ninh - Functional forces promptly successfully rescued a victim trapped in a concrete mixer truck that overturned into a pond.

Proposal to build connecting roads on the Khanh Hoa - Buon Ma Thuot expressway with about 1,700 billion VND

|

Dak Lak - Locality proposes to invest in building a road connecting the end point of the Khanh Hoa - Buon Ma Thuot expressway... with a total investment of about 1,700 billion VND.

Dong Thap focuses on solutions to speed up the progress of the Cao Lanh - An Huu expressway

|

Dong Thap - Provincial leaders requested relevant units to increase human resources and equipment to speed up the construction progress of the Cao Lanh - An Huu expressway.

Repairing 2 landslides on the 750 billion VND road connecting Hoa Binh Lake

|

Phu Tho - After a period of construction, two landslides on Provincial Road 435 through Muong Hoa commune have been repaired, helping people travel more safely.

How is the water level of Hoa Binh Hydropower Reservoir after closing the 2 bottom spillways?

|

Phu Tho - Hoa Binh Hydropower Reservoir has closed all bottom spillways, the downstream water level has decreased rapidly.

Thai Nguyen mountain town devastated after historic floods

|

Thai Nguyen - After the historic flood, the water is gradually receding, the streets are littered with garbage and mud, people are busy cleaning up and overcoming the consequences.

National Highway 1A is flooded nearly 1m, caring driver helps people overcome 11km of floodwaters

|

Lang Son - National Highway 1A is still deeply flooded, many truck drivers have supported people to cross the floodwaters.

Quang Ninh strengthens prevention and combat of IUU fishing

|

Quang Ninh has achieved initial results in the work of preventing and combating illegal, unreported (IUU) fishing.

Roads in Phu Tho are degraded, people are busy every time there is heavy rain

|

Phu Tho - An Duong Vuong Street through Thong Nhat Ward is seriously degraded, posing a potential risk of insecurity.

3 new groups of subjects to participate in Unemployment Insurance from January 1, 2026

|

The 2025 Law on Employment takes effect from January 1, 2026 with many new regulations on unemployment Insurance policies, including expanding the scope of participants.

Not organizing grassroots social insurance at the location where the provincial social insurance headquarters is located

|

The Director of Vietnam Social Insurance (VSS) has just signed and issued a Decision regulating the functions, tasks and powers of the grassroots social insurance.

Police promptly prevent online property fraud

|

Nghe An - Thanks to the vigilance of bank officials and the quick response of Lam Thanh Commune Police, an online scam was prevented.

Forecast of areas expected to have thunderstorms this afternoon and tonight

|

According to the meteorological agency, it is forecasted that this afternoon and tonight, October 9, the Central and Southern highlands will have scattered showers and thunderstorms; the South will have heavy rain over 80mm.

Dien Bien spends tens of billions of VND to upgrade equipment for online meetings

|

Dien Bien - The Provincial People's Committee spends 23 billion VND to expand the online conference system at departments, branches and People's Committees of communes and wards.

Forecast of bad weather due to low pressure in the East Sea

|

The central and southern East Sea area (including Truong Sa special area) is forecast to have showers and thunderstorms; beware of strong gusts of wind of level 6-7 due to the impact of the low pressure area.

Order to open the bottom spillway of Tuyen Quang hydroelectric reservoir early this afternoon

|

1 bottom spillway of Tuyen Quang hydroelectric reservoir was opened at 1:00 p.m. on October 9.

Urban area project land in Gia Lai has been illegally occupied as a parking lot for many years

|

Although planned to become a new development center, over the years, a part of the land in Long Van Urban Area has been occupied as a parking lot and illegally gathered equipment, causing urban chaos.