Traffic

Many flooded sections on National Highway 1 will be thoroughly handled in 2026

|

The Ministry of Construction said that in the 2026 plan, the Ministry will handle many flooded sections on National Highway 1.

Truck overturned, sliding on National Highway 55, killing 1 person on the vehicle

|

Lam Dong - A truck traveling on National Highway 55 overturned and slid down the side of the road, killing a woman on the truck.

After nearly 3 years of construction, the 1,500 billion VND project to expand the southern gateway of Ho Chi Minh City is gradually reaching the finish line

|

HCMC - After nearly 3 years of construction, the National Highway 50 expansion project with a total capital of VND1,498 billion has reached 70% of the volume, expected to open to traffic the entire route by the end of this year.

Accelerating the construction of the Cao Lanh - An Huu Expressway, ensuring technical traffic opening at the end of the year

|

Dong Thap - The provincial Chairman requested to focus equipment and human resources on the construction of the Cao Lanh - An Huu expressway to ensure technical traffic opening by the end of this year.

2 more transportation projects contribute to the shaping of Cua Luc Bay

|

Quang Ninh - After a number of large projects have been put into operation, Quang Ninh is preparing to build 2 more routes to contribute to smooth connections around Cua Luc Bay.

signal lights have been turned off, an intersection in Hanoi has been closed to reduce congestion

|

On the morning of February 24, Hanoi began a pilot of turning off traffic lights and closing the Tran Huu Duc - Nguyen Van Giap intersection (Nam Tu Liem district) to reduce congestion.

Ho Chi Minh City Ring Road 4 creates momentum for development for the entire region's economy

|

After more than a decade of planning, the Ho Chi Minh City Ring Road 4 project is being accelerated, expected to become a strategic transport route, promoting the development of the Southeast, Mekong Delta and Central Highlands.

Provincial roads have a series of potholes, not completely fixed due to low funding

|

Quang Tri - Heavy trucks carrying sand and hotels are constantly circulating, which is one of the reasons for the serious deterioration of Provincial Road 588A.

Ha Tinh coastal road is peeling and deteriorating

|

Ha Tinh - The coastal road Xuan Hoi - Thach Khe - Vung Ang currently has many peeling, heavily degraded locations, making it unsafe for vehicles to travel.

2 motorbikes face off on National Highway 28, 1 dead, 2 in critical condition

|

Binh Thuan - Two motorbikes collided on National Highway 28, killing 1 young man and causing 2 people to be in critical condition.

Tractor-trailer collision at Vung Tau intersection, 1 woman died

|

Dong Nai - The authorities are verifying the cause of the traffic accident that killed a woman riding an electric bicycle at Vung Tau intersection.

Prolonged fog, traffic police recommend drivers to be careful

|

Cao Bang - The Traffic Police Department is issuing a warning to people when participating in traffic to be careful in foggy conditions.

The scale of 3 bridges worth over VND43,000 billion is about to be built in Hanoi

|

Hanoi - Three bridges across the Red River, with a total investment of more than 43,000 billion VND, are about to be built to help reduce congestion and promote the socio-economic development of the capital.

Tomorrow, Hanoi will reorganize traffic on the 8-lane road

|

Hanoi - On February 24, the authorities will fence off the Tran Huu Duc - Nguyen Van Giap intersection and turn off the light signal at this intersection to reduce traffic conflicts.

Car driver towing a motorbike in Vinh Phuc admits to drinking 1 liter of alcohol

|

At the police station, the male driver who dragged a motorbike in Vinh Phuc confessed to having drunk about 1 liter of alcohol and driving a car to participate in traffic.

Two expressways worth over VND72,000 billion in the West still lack sand

|

The Chau Doc - Can Tho - Soc Trang Expressway and the Can Tho - Hau Giang Expressway are still in a state of sand shortage, leading to slow progress.

Restarting the Hung Vuong extended road project in Quang Tri

|

Quang Tri - After a period of stagnation, the extended Hung Vuong road has started construction, expected to be completed in September 2025.

Damage to the residential access road due to the construction of the expressway rest stop

|

Binh Thuan - Many dump trucks carrying materials damaged the residential road near the construction site of the Vinh Hao - Phan Thiet expressway rest stop.

Close-up of the gateway area of Ho Chi Minh City where there will be a 7km elevated road

|

With a total investment of nearly 10,000 billion VND, the North-South axis upgrade project is one of the key transport projects of Ho Chi Minh City, helping to solve the problem of congestion.

Morning news: 10-lane road project in Hanoi is about to reach the finish line

|

Morning news on February 23: The 10-lane road project in Hanoi is about to reach the finish line; Rapper Viet has a song with 1 billion views; Forecast of the time when the storm will increase sharply in the East Sea;...