Traffic

Many flooded sections on National Highway 1 will be thoroughly handled in 2026

|

The Ministry of Construction said that in the 2026 plan, the Ministry will handle many flooded sections on National Highway 1.

Truck overturned, sliding on National Highway 55, killing 1 person on the vehicle

|

Lam Dong - A truck traveling on National Highway 55 overturned and slid down the side of the road, killing a woman on the truck.

After nearly 3 years of construction, the 1,500 billion VND project to expand the southern gateway of Ho Chi Minh City is gradually reaching the finish line

|

HCMC - After nearly 3 years of construction, the National Highway 50 expansion project with a total capital of VND1,498 billion has reached 70% of the volume, expected to open to traffic the entire route by the end of this year.

Accelerating the construction of the Cao Lanh - An Huu Expressway, ensuring technical traffic opening at the end of the year

|

Dong Thap - The provincial Chairman requested to focus equipment and human resources on the construction of the Cao Lanh - An Huu expressway to ensure technical traffic opening by the end of this year.

2 more transportation projects contribute to the shaping of Cua Luc Bay

|

Quang Ninh - After a number of large projects have been put into operation, Quang Ninh is preparing to build 2 more routes to contribute to smooth connections around Cua Luc Bay.

Prosecution of the bus driver in the accident on National Highway 6 that killed 6 people

|

Son La - The police have prosecuted the driver who caused a serious accident on National Highway 6, killing 6 people and injuring many others.

Exams in Can Tho continue to take place normally

|

Can Tho - Although it is in the process of transferring management units, the exam is still taking place normally, without interruption.

Results of alcohol and drug concentration of the driver in the accident that killed 6 people

|

Son La - The authorities have conducted an alcohol and drug test for the two drivers in the traffic accident that killed 6 people on National Highway 6.

Scene of the accident that killed 6 people on National Highway 6

|

Son La - On the night of February 21, on National Highway 6, a traffic accident occurred between a passenger car and a tractor-trailer, causing many casualties.

Determining the cause of the accident that killed 6 people on National Highway 6

|

Son La - The authorities have determined the preliminary cause of the traffic accident between a passenger bus and a tractor-trailer on National Highway 6, which killed 6 people.

Identities of 6 people who died in a passenger bus accident on National Highway 6

|

Son La - The authorities have identified the victim of the traffic accident between a passenger bus and a tractor-trailer on National Highway 6 that killed 6 people.

5 urgent projects to prevent traffic jams in Ho Chi Minh City are only half open to traffic

|

HCMC - The My Thuy and An Phu intersections, the Tran Quoc Hoan - Cong Hoa connecting road, the Duong Quang Ham road expansion, and National Highway 50 are only half open to traffic due to land clearance problems.

8-lane road in Hanoi after traffic light adjustment

|

The Tran Huu Duc - Trinh Van Bo road (Nam Tu Liem district, Hanoi) has had its traffic light signal adjusted after a persistent traffic jam.

Ho Chi Minh City residents look forward to the day of building a 1,000 billion VND pedestrian bridge

|

HCMC - The pedestrian bridge across the Saigon River connecting Bach Dang Wharf Park with the Saigon Riverside Park is about to start construction, expected on March 29.

Overturning a truck, a car was turned across, dragged on the road

|

Long An - The dashcam recorded images of a 5-seat car crossing the front of a truck at close range and the accident occurred.

Repairing damaged suspension bridge after Lao Dong Newspaper's reflection

|

Thai Nguyen - The Nhat Waterfall suspension bridge (Dong Hy) is damaged, causing difficulties in travel and trade, and has been repaired and overcome.

Current status of the billion-dollar intersection in Ho Chi Minh City has been congested for 9 years due to land clearance

|

HCMC - Construction started in 2016, but the My Thuy intersection (Thu Duc City) has not yet been completed due to land clearance problems.

Preventing fence crossing on unfinished Hai Phong coastal road

|

Although the Hai Phong coastal road project is still unfinished and littered with materials, many people still ignore the danger and travel back and forth.

HCMC expands 4 gateway routes to 60 m, starting construction in 2026

|

Ho Chi Minh City will invest more than 57,000 billion VND to upgrade and expand 4 gateway arterial routes to 60m, expected to start construction in 2026 and be completed in 2028.

Hanoi metro tunnel underpass, tunnel drilling accessories float to the ground

|

On the evening of February 20, the Hanoi Urban Railway Management Board informed about the phenomenon of tunnel excavation and spraying on the ground at the Hanoi Metro tunnel drilling project.