Traffic
The cause of a series of potholes appearing on National Highway 1A through Hue City
|
HUE - Many sections on National Highway 1A through Chan May - Lang Co commune are severely damaged, with dense "elephant holes, potholes" causing danger and are being repaired.
Morning news 9.11: Starting construction of 6.6 km long elevated road in the South of Ho Chi Minh City
|
Morning news 9.11: Starting construction of a 6.6 km long elevated road in the South of Ho Chi Minh City; New information about the case of a reservoir broken on a mountain in Lam Dong under illegal construction;...
Tractor-trailer confronts truck on Ho Chi Minh road, 1 driver dies on the spot
|
Da Nang - A terrible collision between a tractor-trailer and a truck left 2 vehicles deformed, 1 person dead.
Driver in Ninh Binh recounted the moment he escaped death and crawled out of a crumpled car
|
Ninh Binh - After a series of collisions with two trucks and a crushed car, the driver still crawled out of the car safely, surprising many witnesses.
20h News: Traffic lights in Hanoi upgraded with AI, temporarily stopped counting seconds
|
Reasons why traffic lights at many intersections in Hanoi are left behind for a few seconds; Reservoirs broken on mountains in Lam Dong are not built without permission, have not been technically assessed...
Traffic police lead the way for ambulances on the highway
|
Binh Thuan – A car carrying a person had difficulty breathing and convulsions on the highway. The patrolling traffic police used a special vehicle to lead the way to a medical facility in time.
Ho Chi Minh City opens 9-year-old unfinished road in Thu Duc
|
HCMC - After 9 years of implementation, Luong Dinh Cua Street (from Nguyen Hoang Street to Tran Nao intersection, Thu Duc City) will open to traffic before Lunar New Year 2025.
Nearly 100 million passengers use electric buses in Hanoi
|
Hanoi - After 3 years of implementation, electric buses have transported nearly 100 million passengers in the capital.
Hai Phong strives to complete Hoa River bridge before Tet
|
Hai Phong - Hai Phong City directs to speed up progress, striving to complete the Hoa River bridge before Lunar New Year 2025.
Scene of car crashing into house wall in HCMC
|
HCMC - Recorded by Lao Dong on December 2nd after a strong collision from a 5-seat car caused the wall of a house in Hoc Mon district to collapse, many items were damaged.
Identities of 6 young men who died in 2 traffic accidents in Hoa Binh
|
Hoa Binh - Authorities have identified the six young men who died in two consecutive traffic accidents on National Highway 12B and National Highway 6.
Investing 45 billion VND to repair National Highway 12B through Hoa Binh
|
Hoa Binh - National Highway 12B section through Lac Son and Tan Lac districts has just received an investment of 45 billion VND for repair.
5-seat technology car crashes into house wall in HCMC
|
HCMC - A 5-seat technology car driven by a male driver suddenly lost control and crashed into a house wall in Hoc Mon town (HCMC).
Two consecutive traffic accidents killed 6 people in Hoa Binh
|
Hoa Binh - Two consecutive traffic accidents occurred on National Highway 12B and National Highway 6, passing through Tan Lac district, causing 6 deaths.
Multiple accidents on Highway 6, many vehicles damaged
|
Hoa Binh - Authorities are investigating the cause of a series of traffic accidents on National Highway 6 that damaged many vehicles.
How to manage a team of motorbike taxi drivers at a bus station in Hanoi
|
Hanoi - Good management of the motorbike taxi team at bus stations helps passengers feel secure using the service, reducing solicitation and chaos...
Panorama of the 800 billion VND underpass that will open to traffic at the end of December
|
HCMC - The HC1 tunnel branch of the Nguyen Van Linh - Nguyen Huu Tho intersection underpass project has reached 85% progress and is expected to be completed and open to traffic on December 31.
First girder of 8,000 billion VND bridge installed in the West
|
Soc Trang - On the afternoon of December 1, the first girder span of Dai Ngai 2 bridge was installed.
The first steel arch bridge in Quang Ngai is under construction
|
Tra Khuc 3 Bridge with the first steel arch design in Quang Ngai is accelerating construction, ready for technical traffic opening by the end of this year.
In 2025, an important road connecting two districts in Hanoi will open to traffic
|
Hanoi - The extended Le Quang Dao road connecting Nam Tu Liem district with Ha Dong has reached 85% of its volume after 22 months of construction, expected to be completed in May 2025.