Society
Hung Yen removes obstacles to site clearance for 10 key projects
|
Hung Yen - Leaders of Hung Yen province request to focus on removing obstacles, accelerating site clearance and the progress of implementing 10 key public investment projects.
Taking biological samples of 155 martyrs' remains in Hue
|
HUE - Biological sampling activities are being implemented at 3 martyrs' cemeteries in Chan May - Lang Co commune to serve DNA testing and identify martyrs.
3-day weather forecast from June 26 to June 28 in all three regions
|
Weather forecast for the next 3 days in the North with scattered showers and thunderstorms, with heavy rain in some places. Rain concentrated in the late afternoon, night and morning. Intermittent sunny days.
Weather forecast for tomorrow June 26th nationwide
|
Weather forecast for tomorrow, June 26, Hanoi will have showers and thunderstorms at times in the morning, intermittent sunshine in the afternoon. Ho Chi Minh City will have scattered showers and thunderstorms in the late afternoon and evening, with heavy rain in some places.
8 PM News: Many localities propose increasing allowances for Village Heads and Party Cell Secretaries
|
8 PM News on June 25th: Ho Chi Minh City exempts 134 bus route tickets from July 1st; Many localities plan to increase allowances for Village Heads, Party Cell Secretaries...
Ca Mau points out 12 projects that are behind schedule and low in efficiency
|
Ca Mau - The Inspectorate of Ca Mau province concluded the inspection of 12 projects with difficulties, problems, delays, and long-term backlogs, risking loss and waste.
Mobilizing machinery and human resources to construct the Chau Doc - Can Tho - Soc Trang expressway
|
An Giang - At the Chau Doc - Can Tho - Soc Trang expressway construction site (through An Giang), the contractor mobilized all resources to aim for the end of June 2026.
Gia Lai builds safe livestock areas to control epidemics
|
Gia Lai - The relevant agencies are organizing control and establishing safe livestock areas to limit epidemics.
The East-West axis is about to open to traffic, expected to be the backbone for development in the western area of Can Tho
|
Can Tho - After more than 2 years of construction, the East-West economic development axis has been completed, creating momentum to promote socio-economic development in the Western region.
My Thuy Port construction vehicles destroy the first leg of National Highway 15D
|
Quang Tri - Many heavy trucks carrying construction materials for My Thuy Port enter and exit every day, causing the first section of National Highway 15D to seriously deteriorate.
All kinds of garbage are burned openly in Hanoi residential area, people "hold their breath" because of smoke
|
Hanoi - The spontaneous garbage burning on Mieu Nha Street (Xuan Phuong Ward) has seriously affected people's lives and health.
HCMC asks for opinions from 4 ministries on the project of road and overpass connecting Can Gio - Vung Tau
|
Ho Chi Minh City asks for opinions from 4 ministries on the project of the road and overpass connecting Can Gio - Vung Tau proposed by Vingroup, nearly 15 km long, expected to start construction in June 2026.
Public investment disbursement in Quang Tri is slow, risk of missing progress
|
Quang Tri - Up to now, public investment disbursement in Quang Tri has only reached 45.54% of the plan assigned by the Prime Minister, lower than the national average.
17-year-old resettlement area in Cao Bang invested 60 billion VND to renovate
|
Cao Bang - The project to renovate and upgrade the technical infrastructure system of the new urban area of De Tham is being urgently implemented.
Lao Cai urgently prepares for the groundbreaking ceremony of the billion-dollar railway project
|
Lao Cai - The locality is urgently completing preparations for the groundbreaking ceremony of the Lao Cai - Hanoi - Hai Phong railway project.
Ho Chi Minh City puts into operation a 1.4-hectare bus station at the western gateway
|
HCMC - Le Minh Xuan Bus Station in Binh Loi Commune (old Binh Chanh District) has been in operation since December 16, contributing to the completion of the public transport infrastructure at the western gateway.
Current status of the two most congested roads in Ho Chi Minh City about to build an elevated road
|
HCMC - Xo Viet Nghe Tinh and Dinh Bo Linh streets at the Northeast gateway of HCMC will be expanded and an elevated road will be built, helping to eliminate constant traffic jams.
Forecast of bad weather areas in the next 2 days
|
Many sea areas of the East Sea will have unfavorable weather. Tomorrow, December 17, the Gulf of Tonkin is also forecast to have strong northeast winds of level 5, sometimes level 6, rough seas.
The cemetery has been damaged before it was handed over
|
The project to expand Truong Dong People's Cemetery worth nearly 40 billion VND has been abandoned for many years, many items are degraded, the slope is seriously eroded, and poses a potential risk of insecurity.
Water levels of hydroelectric reservoirs in the North on December 16
|
The water level of large hydroelectric reservoirs in the North generally remains around normal rising water levels, ensuring safe operation and power generation.
