Society

10-day weather forecast from the night of June 28 to July 8 across the country

|

The National Center for Hydro-Meteorological Forecasting forecasts the weather for the next 10 days (from the night of June 28 to July 8) in regions across the country.

Weather forecast for tomorrow, June 29th, nationwide

|

Weather forecast for tomorrow, June 29, Hanoi has scattered rain concentrated in the late afternoon, night and morning. Ho Chi Minh City in the late afternoon and evening has showers and scattered thunderstorms, with heavy rain in some places.

8 PM News: Reason why the nearly 80 billion VND bridge in Nghe An is built but cannot be used yet

|

8 PM News on June 28th: Nearly 80 billion VND bridge in Nghe An is still "covered with tarpaulin"; Proposal to fine up to 20 million VND if preschool children are taught before the 1st grade program...

Hanoi Party Secretary inspects progress of National Highway 6 upgrade project, construction of Co Linh underpass

|

Hanoi Party Secretary Tran Duc Thang directly inspected a number of key traffic projects such as the National Highway 6 upgrade project and the construction of Co Linh underpass.

Using radar to search for 2 collective martyrs' graves in Quang Tri

|

Quang Tri - Division 968 coordinates with specialized units of the Ministry of National Defense to deploy ground-penetrating radar equipment to detect locations suspected of having mass martyrs' graves.

Mrs. dies, grandchildren missing due to capsized boat in flood

|

Thanh Hoa - The authorities have found the body of the grandmother in the boat capsize, while the grandchild is still missing.

Vinh Long starts construction of the 250 billion VND North-South Road to celebrate the Party Congress

|

Vinh Long - Starting construction of a 250 billion VND project, period 2023-2026, connecting Phu Thuan Industrial Park and Phong Nam Industrial Park, promoting the socio-economic development, welcoming the Provincial Party Congress.

Workers take a leave of absence, many boarding houses are paralyzed due to flooding in Hanoi

|

Hanoi - Heavy rain caused many worker dormitories to be submerged in water, causing serious stagnation in daily life and work.

After storm No. 10, 37,000 customers in Quang Tri still have no power outage

|

Quang Tri - Workers and engineers in the Electricity industry are mobilized to work day and night to fix the power outage caused by storm No. 10.

Nghe An has 1 death, 11 injuries, and more than VND1,400 billion in damage due to storm No. 10

|

Nghe An - A quick report as of 1:00 p.m. on September 30 showed that the total damage caused by storm No. 10 in the area is estimated at more than 1,426 billion VND.

Gia Lai establishes temporary command post, urgently searches for 8 fishermen who have been out of contact for many days at sea

|

Gia Lai agreed to establish a temporary command post to direct the search for fishing boat BD 97258 TS and 8 fishermen who have been missing for many days at sea.

Many streets in Hanoi are flooded like rivers, office workers apply to work online at home

|

The heavy rain lasted from the night of September 29 to the afternoon of September 30, causing many streets in Hanoi to be deeply flooded, forcing many workers to take a day off or work online at home.

Thunderstorms in the next 3 days in the South

|

HCMC - According to the Southern Hydrometeorological Station, there will be showers and thunderstorms in some places in the coming days.

Order to close the bottom spillway of Hoa Binh hydroelectric reservoir, request supervision of Tuyen Quang hydroelectric reservoir

|

The bottom spillway of Hoa Binh hydroelectric reservoir was ordered to close at 5:00 p.m. on September 30.

Identities of 3 officers constructing the Dong Dang - Tra Linh expressway swept away by flood

|

Cao Bang - 3 Dong Dang - Tra Linh construction officers were swept away by floodwaters and went missing.

Hanoi announces 65 flooded spots

|

Hanoi Hanoi Drainage One Member Co., Ltd. has just quickly announced about flooded areas in the city.

Time to complete the expansion of La Son - Hoa Lien Expressway

|

HUE - A representative of the Ho Chi Minh Road Project Management Board has just provided information on the progress and expected completion of the expansion of the La Son - Hoa Lien Expressway.

To Lich River rises more than 2m after only 6 hours

|

Hanoi - From 7am to 1pm on September 30, the water level of To Lich River rose to about 2.26m, from 3.85m to 6.11m.

Starting construction of the VND3,900 billion bridge project connecting the An Giang and Ca Mau inter-regions

|

An Giang - The project is one of the projects of strategic significance, connecting the coastal route, connecting the An Giang and Ca Mau inter-regional areas.

Waterway police deploy specialized canoes to rescue 2 crew members in distress on the Ma River

|

Thanh Hoa - Two crew members in distress on the Ma River were fortunately rescued by the police force in time.